QandA HRMPF 06 Jun 23 - Amendment 01.pdf
PDF 98 KB Posted
- Attached to
- ACC Human Resources/Military Flight Personnel Support Services Federal contract opportunity
- Solicitation number
- FA489023R0032
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Document RFP Section/
Paragraph Narrative (if applicable) Question Response
If Revision Required, Solicitation Amendment
Included On
1 PWS 5.6 Please confirm that the IPT meeting notes are due 1-2 business days post-meeting. PWS did not specify, revised section 5.6 Amendment 01
2 PWS 10.1.2 Does consumable office supplies supplied by the contractor include paper? Paper will be provided by the Government. Section 10.1.2 updated Amendment 01
3 PWS 4.5.1.2.11 Since the number (4.5.1.2.11) is lined out, is this section meant to be removed? This was an error, the solciation posted on May 26th included the revised
PWS whee this was corrected
4 PWS 6.2 Please clarify the difference between an overtime request versus a surge request. Surge is when additional hours are required and the process outlined in section 6.2 must be followed. References to overtime have been removed.
Amendment 01
5 PWS 6.2 Is there an anticipated number of surge requests per year? No. A surge CLIN is part of the contract and will be negotiated as needed.
6 HR+MPF+PWS
+5+
May+23+-
+DRAFT (PWS)
page 25, section 8.2 Security Clearances: The Contractor must possess or obtain a facility security clearance at the level SECRET prior to performing contract work
If an offeror responds to this solicitation and they are lacking a security clearence, will this be evaluated as unfavorable by the Government?
52.212-1 Addendum, Section 9.6 states "Offerors shall possess or acquire a facility clearance equal to the requirement on the DD254 without additional authorization (i.e. National Interest Determination (NID)) by the proposal due date. If an Offeror does not have the required clearance at the time of proposal submission, the proposal will not be evaluated and is not eligible for award."
7 PWS page 25, section 8.2 Security Clearances: The Contractor must possess or obtain a facility security clearance at the level SECRET prior to performing contract work
If an offeror does not currently possess a facility security clearance at the level SECRET, will the government provide sponsorship to an awarded offeror?
See question 8 response
8 General Question 4.0 Task Requirements (Roles) Are all 61 positions listed considered to be full time positions that work 40 hours per week?
All positons are full time. The PWS, section 7.16, states operational hours and work week requirements.
9 General Question 4.0 Task Requirements (Roles) Are any of the 61 positions listed considered part-time? See quesiton 10 response
10 PWS page 3, section 4.0 Table 1.0 Core and Optional FTE The OC Code 14160 is titled "Personnel Computer Support Tech/Cyber Liason8". Can the government please clarify the reference to numeral 8?
The number 8 is a type error.
11 PWS page 3, section 4.1 .2. Requirements for all Contractors. Contractor personnel sh Section refers for Contractor to contiplate surging customer loads and other unanticipated constraints not within the control of the Contractor. Can the government please provide an inclusive list the "other unanticipated constraints"?
No, the Government cannot anticipate all "unanticipated events."
12 PWS page 13, section 4.5 4.5.1.9. Section refers to Contractor providing system administration support and troubleshooting of all components. Can the government please define the tasks associated with the "system administration support and troubleshooting of all components"?
Response forthcoming
13 PWS page 22, section 7.0 7.13.1. Transition-In Section refers to a transition period of 30 calendar days for Contractor personnel asign to all locations listed in this task order. Can the government please clarify if the incoming Contractor will have the ability to invoice for the 30 calendar day Transition-In period?
Yes, CLIN 0010 accounts for the 30 day transition.
14 PWS page 24, section 7.0 7.17. Operational Hours The PWS provides an example that states "the MPF may close one weekday afternoon but open
Saturday morning. Surge compensation does not apply to these flexible hours that take place within a
40-hour workweek". Can the government please clarify the Saturday morning working hours?
Additionally, this section refers to "surge compensation". Can the government please clarify when
"surge compensation" is applicable?
See Revisions to PWS, sections 7.17 and 6.2
15 PWS page 24, section 7.0 7.18. Emergency or Special Event Services Section 7.18. refers to additional workload shall be necessary when coordinated through the COR and
CO. Can the government please provide examples of "emergency or special event services" that may be required by Contractor personnel?
No
16 PWS page 29, section 10.0 10.2.2. Office Supplies Section 10.2.2. refers to the Contractor shall provide all consumable office supplies (pencils, pens, staplers, etc.). Can the government please provide an inclusive list of the consumable office supplies that
Contractor is required to provide?
No.
17 PWS page 31, section 11. 11.3. In-House Training Section 11.3. refers to the Contractor shall attend and conduct in-house training to all Contractor employees during the regularly scheduled training session for those activities/duties that are the sole responsibility of the Contractor. Can the government please provide the curriculum that Contractor is required to provide training to Contractor personnel? Additionally, can this "In-House Training" be conducted virtually and will this "In-House Training" be billable by the Contractor and paid by the government for each employee's training participation?
The contractor is responsible for deciding how to conduct in-house training. The costs of the training is not a separate billable CLIN.
18 PWS page 34 ppendix B Monthly Metrics Report (MMR) Deliverable CriteAppendix B includes multiple tables that represent "Customer Service Outputs" with the respective
"Performance Requirement". The "Performance Requirement" in certain instances, represents same day to a range of within 1-10 business days or a certain number of hours/duty hours. In certain instances circumstances may occur outside of Contractor personnel's control, such as reliance on information by other third parties, which would hinder Contractor's personnel meeting certain "Performance
Requirements" in specific instances. Therefore, can the government please clarify the performance requirement that would be required by Contractor's personnel when such instance may occur?
Performance requirements are as stated and were dervied to meet mission requirements.
19 PWS page 3 Table 1.0 Core and Optional FTE Will the Governemnt please clairify or further explain the "Optional (unexercised) per location" FTE noted in Table 1.0 Core and Optional FTE? PWS revised at section 4.0 Amendment 01
20 PWS page 3 Table 1.0 Core and Optional FTE Table 1.0 lists the number of Full-time Equivalent (FTE) positions, will the Governemnt allow these positions to be filled by part-time employees?
No.
21 PWS page 2 2.0 Scope and Objectives Can the Government provide estimates on the volume of transactions for each system (DEERS, RAPIDS, ARMS, DCPDS, CAC, and Awards programs) by location?
This data is not avaialble.
22 PWS page 9 1.26 Military Awards and Decoration Administration SubtaskWill the Government clarify any differences in 4.4.1.26 Military Awards and Decorations Admin.
Subtasks and Section 4.3.22 with the same title?
Both PAI and PAII are responsible for this task and listed under both positions.
23 PWS page 10 4.4.1.28 Site Security Manager Subtasks
Section 4.4.1.28 Site Security Manager Subtask notes that two (2) site security managers for each
RAPIDS site are required. Will the Government clarify if each (of the 2) site security managers is to be a
PAII, as this is listed under section 4.4 for PAII and only one PAII is listed in Table 1.0 per site.
Additionally, will the Government clarify if both shall be on-site or is the second position utilized more as a backup role?
IAW PWS section 4.3.1.25 the PAII is the Primary SSM and the PAI shall be a back-up. IAW PWS Section 4.4.1.28 "One SSM must be physically avilable on site at all times during RAPIDS operations…"
24 PWS page 10 4.4.1.28. Site Security Manager Subtasks
Section 4.4.1.28 requires site security managers for all RAPIDS operations. Will the Government clarify which locations/sites are RAPIDS operations, or how/when RAPIDS operations take place? All locations have RAPIDS stations.
25 PWS page 11 4.5.1.2.7 MilPDS Subtasks
Section 4.5.1.2.7 notes accuracy percentages, will the Government clarify any penalties or needed actions if percentages fall outside the desired levels? Refer to PWS section 9.0
26 PWS page 18 5.6 Integrated Progress Team (IPT) Minutes
Section 5.6 Requires a Program Manager, will the Government clarify if this position is in addition to the
FTEs in Table 1.0? If so, is this Billable?
Section 5.6 revised to include "Contract Program Manager" - the offeror should decide how this requirement will be fulfilled and propose accordingly. Amendment 01
27 PWS page 19 5.8 Trip Report
Section 5.8 requires trip reports due in 2 business days, would the Government consider extending this to 5 business days to accommodate the completion and/or review before submittal? Yes, PWS section 5.8 has been revised Amendment 01
28 PWS page 19 5.9 File Plan
Section 5.9 File Plan requires the management of inherited/transferred records. Please confirm that these are electronic files and that no proprietary software is needed, or that appropriate access will be granted to the contractor.
The Government confirm these are electronic files and require no software. Contractors will be granted access by the Government.
29 PWS page 19 5.9 File Plan
Section 5.9 Identifies a Record Manager, will the Government clarify if this position is in addition to the
FTEs in Table 1.0? If so, is this Billable?
Section 5.9 was updated to specify that a records manager need to be appointed for each site.The offeror should decide how this requirement will be fulfilled and propose accordingly. Amendment 01
30 PWS page 22 7.12 FTE at Contract Start
Section 7.12 FTE at Contract Start, requires the contractor to have all personnel available at the contract start date. However, Section 5.2 Hiring Status Report appears to outline a hiring process after the contract start date, please clarify.
PWS 7.12 reference the expectation that the contractor will have all positions filled on the start date of the contract. Section 5.2 is in reference to vacant positions and the timeline it takes to fill.
31 PWS page 23 7.17 Operational Hours
Please confirm the Operational Hours, Section 7.17 are 7:30 am to 4:30 pm local time for each location and time zone?
Section 7.16 speifices operation hours and is according to each location and time zone.
32 PWS page 25 8.8 Security Manager Appointment
Section 8.8 Identifies a Security Manager, will the Government clarify if this position is in addition to the
FTEs in Table 1.0? If so, is this Billable?
PWS revised to specify "Security Assistant." Paragraph 8.6 states " … may be a fulltime position or an additional duty position." Offerors should decide how this requirement will be fulfilled and propose accordingly. Amendment 01
33 PWS page 30 11.1 RAPIDS Training
For the RAPIDS Training, Section 11.1, requires personnel to attend. Please clarify if it is personnel from all locations that hold that title or just the location holding the training? Just the location holding the training is required to participate.
34 Draft RFP page 2 Section 4.0 How many of each of the 4 positions are currently vacant and at what locations? Due to the contract type, the Governemnt does not have this information.
35 Draft RFP Page 14 Section 4.5
Does the current contract require a secret clearance and if so what positions? If not, are we correct in assuming only the Computer Systems Analyst II and the Personal Computer Support Tech/Cyber
Liason are the only positions requiring a secret clearance?
See PWS Section 8.2 for security clearance requirements
File details come from the government source that posted it. Updated .