QALITY ASSURANCE SURVEILLANCE PLAN.pdf

PDF 83 KB Posted

Attached to
R602--Lab Courier Services Ann Arbor Federal contract opportunity
Solicitation number
36C25025Q0389
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

The document is a Quality Assurance Surveillance Plan (QASP) for a lab courier services contract with the Department of Veterans Affairs Veterans Health Administration. The QASP outlines four key performance objectives for the contractor: 1) Infection Control - ensuring 95% safety and integrity of specimens, 2) Courier Routes - performing routes with 90% compliance to the attached schedule, 3) Courier Pickup/Drop-offs - maintaining 90% on-time performance, and 4) Cooler Safety/Integrity - maintaining 100% integrity of serialized pull-tight seals. The monitoring method for all objectives involves 100% daily direct observation by lab personnel and contractor reporting, with specific references to Sections 2, 4, and 10 of the Performance Work Statement (PWS).

View the file

Other files for this federal contract opportunity

Other files attached to R602--Lab Courier Services Ann Arbor, newest first.
File Type Posted
Questions.pdf PDF
36C25025Q0389 0001.pdf PDF
36C25025Q0389_1.docx DOCX document
Service Contract Act WD 2015-4833 REV 27 EFF 12.23.2024 Washtenaw.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QALITY ASSURANCE SURVEILLANCE PLAN:

PERFORMANCE

OBJECTIVE

Tasks:

PWS

REFERENCE

PERFORMANCE

STANDARD

ACCEPTABLE

(MINIMAL)

QUALITY

LEVEL (AQl)

MONITORING

METHOD

Infection Control:

Ensure the safety and integrity of specimens.

Section 2 -

Objectives

No loss or destruction of specimens

95%

100 % Daily Direct

Observation by Lab

Personnel and

Contractor reporting

Courier routes are performed in accordance with the attached courier schedule

Section 4 –

Location/Times

No missed routes 90%

100% Daily Direct

Observation by Lab

Personnel and

Contractor reporting

Courier routes are performed in accordance with the attached courier schedule

Section 4 –

Location/Times

Courier pickup/drop offs are on time

90%

100% Daily Direct

Observation by Lab

Personnel and

Contractor reporting

Cooler safety/integrity

Section 10 –

Description of

Items

No damage or tampering with serialized pull-tight seals.

100%

100% Daily Direct

Observation by Lab

Personnel

File details come from the government source that posted it. Updated .