QALI.pdf
PDF 857 KB Posted
- Attached to
- F-35 Flexible Linear Shape Charge Assembly Federal contract opportunity
- Solicitation number
- FA8213-20-R-3038
About this file
This document contains a quality assurance letter of instruction and a related federal contract opportunity solicitation. The quality assurance letter outlines inspection requirements for various part numbers including stamps or signatures required on documentation, witnessing of tests, and notification timelines. Inspection points will be imposed on work orders for critical flight items. The related federal contract opportunity is a solicitation from the Department of the Air Force seeking inert training assemblies and initiators for the F-35 program. It includes 11 line items for various part numbers with quantities ranging from 385 to 2,545 units. The location of performance and delivery is specified as Indian Head, Maryland. The duration of any resulting contract would be for an indefinite delivery indefinite quantity basis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821320R3038-0003.pdf | ||
| SOW_Ammunition_Data_Cards.pdf | ||
| FA821320R3038-0002.pdf | ||
| SPI_PHST_337.pdf | ||
| FA821320R3038.pdf | ||
| CADPAD_IMI_V15.pdf | ||
| SPI_PHST_338.pdf | ||
| Item_Descriptions.pdf | ||
| FA821320R3038-0001.pdf | ||
| CDRLs_FA821320R3038_Rev1.pdf | ||
| AIR_SPEC_Revision_2.pdf | ||
| SOW.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA Signature
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Date
Rev Date: 30 April 2019
Sheet1
| Text49: | |
| Text46: 4 May 2020 | |
| 2020-05-04T12:10:47-0600 | |
| KRAMER.LAWRENCE.C.1141472808 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: V |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| undefined_7: V |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: M |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements as applicable. |
2. Verify gross/fine leak checks are performed per ATP requirements
3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct. EELS have been submitted with corresponding ELACS.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.
| Text24: 1.Inspection |
| Part Number: 876085-123, -143, -144, -145, -146, 876065-01, 831147-01, 876070-01, 876100-03, & 833767-01 |
| Text23: |
| DODIC: JN59, JN58, JN57,JN56, JN60, JN64, JN61, JN65, JN62, JN55 |
| Text22: |
| Text21: |
| Text20: 06331 |
| Text19: PSEMC |
| Part Number Line 2: |
| Contract No: 20-50104 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: F-35 Transparancey Removal System (TRS) |
File details come from the government source that posted it. Updated .