QALI.pdf

PDF 900 KB Posted

Attached to
B-1B Escape Handles Federal contract opportunity
Solicitation number
FD20202050070
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance requirements for a sole source contract award to Universal Propulsion Company for escape handles on the B-1B Weapon System. The contract is with the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base. Universal Propulsion will provide 36 escape handles under part number 2674300-301-02, 48 handles under part number 2674200-201-02, and 16 handles under part number 2674100-101-03. Delivery is required in fiscal year 2021. The Defense Contract Management Agency will inspect items at various points including explosive weight verification, leak testing, x-ray examination, lot acceptance testing, and preparation for shipment. Additional inspection requirements may be imposed as necessary.

View the file

Other files for this federal contract opportunity

Other files attached to B-1B Escape Handles, newest first.
File Type Posted
AIR SPEC 20-50070 Amended 30 Aug 2019.pdf PDF
20-50070 807s.pdf PDF
20-77091 EDL.pdf PDF
DD 1653.pdf PDF
20-77090 EDL.pdf PDF
CADPAD Item Marking Instruction - Ver 1.5 - 20190501.pdf PDF
REPSHIP 11 Mar 14.doc DOC document
SPI Part II.pdf PDF
Reman and Repair.doc DOC document
20-93847 EDL.pdf PDF
TransInstruction4.pdf PDF
20-50070 EDLs.pdf PDF
ADC SOW Jan 2018.doc DOC document
20-50070 Item Descriptions.pdf PDF
Hazard Sheet.pdf PDF
SPI.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46:
2019-05-10T14:08:25-0600
SWANSON.DEVIN.D.1385800432
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 2674300-301-02, 2674300-301-03, 2674300-301-04
DODIC: UY02, UY03, UY01
Text20: 17610
Text19:
Part Number Line 2:
Contract No:
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1B

File details come from the government source that posted it. Updated .