This document is an addendum to an Invitation to Bid (ITB) issued by the City of Norcross, Georgia for the Pinnacle Park Dredging project. The addendum provides responses to questions received from potential bidders and clarifies key details about the project scope and requirements.

The project involves hydraulic dredging and sediment removal from Pinnacle Park's pond. The depth of the pond is 4 to 7 feet, with approximately 4 feet of sediment to be dredged. The preferred methods are hydraulic dredging and using geotextile tubes for dewatering. Subcontracting the sediment removal is not allowed, and the general contractor must perform all aspects of the project. There are no wage requirements or drawings provided, but the city will meet with bidders on-site to show the dredging area. The work hours allowed are 7:00 AM to 8:00 PM, Monday through Friday. The last time the pond was dredged was in 2017, and non-potable water will be available on-site at no charge for the contractor's use.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Norcross – Public Works 345 Lively Avenue, Norcross GA 30071 Office: 678-421-2069 Fax: 770-255-2335 www.norcrossga.net

Addendum 1 – Q&A

Pinnacle Park Dredging

ITB PW 24-07

The following changes and clarifications to the ITB are provided based on questions received and must be added/considered when completing your Bid packet:

Q. Can you please tell me if this is a hydraulic dredging job or a mechanical excavation?

If hydraulic dredging is allowed, would Geotextile tubes for dewatering be allowed?

A. Hydraulic dredging and geotextile tubes for dewatering are the preferred methods.

Q. Can a Contractor licensed in Texas work on this project?

A. There is no local preference stated in the ITB; however, the Contractor will be expected to have the appropriate licenses and requirements to perform the scope of work in Georgia.

Q. According to paragraph 2.3.1. we cannot subcontract out the removal of the sediment to a trucking company. We are a dredging company located in Ohio and our trucks are not licensed to work outside the state. Can an amendment be made to allow us to perform the dredging via hydraulic dredge and subcontract out the removal of the material?

A. No – Joint Ventures between two contractors will not be allowed. The General Contractor shall be required to perform all aspects of this projects and will not be allowed to sub-contract these items.

Q. Is this a prevailing Wage Job?

A. There are no wage requirements attached to this project.

Q. There are no drawings with the procurement. Are drawings of the body being dredged depicting what areas are to be dredged available?

A. No will meet on site to show Dredging area

Q. How deep is the pond?

A. 4 to 7 FT

Q. Do you know approximately how deep the sediment to be dredged is?

A. 4 Foot

Q. Do you know what the insitu solids are of the material being dredged?

A. Sandy Material http://www.norcrossga.net/

Q. Can you please disclose the area proposed for a dewatering area?

A. Opposite side of Pond at Haul road at Sewer easement. Can meet you on site

Q. When is the last time this was dredged?

A. 2017

Q. Is water either potable or non-potable available at the site for polymer make up?

A. Non Potable

Q. Will there be a charge for that water?

A. No

Q. What are the hours we will be allowed to work Monday through Friday?

A. 7:00 AM to 8:00 PM

Q. Can you please post or share the details of the sediment trap so we can properly estimate the work and materials involved.

A. Material to be used Type 1 Rip Rap Approximately 1 Truck Load

ACKNOWLEDGEMENT OF ADDENDA

The undersigned hereby acknowledges receipt of the following Addenda:

Addendum Number Dated Acknowledge Receipt (initial)

No addenda were received:

Acknowledged for:

(Name of Firm)

Signature of Authorized Representative

Name (Print or Type)

Title

Date

No addenda were received: