This is a Questions and Answers document for Request for Proposals (RFP) issued by the City of Philadelphia's Department of Streets for On-Call Portfolio Management Services. The RFP seeks proposals from PennDOT pre-qualified engineering firms to provide comprehensive project management services for federal and state-funded transportation and bridge projects. The scope of work includes schedule development and maintenance, design reviews, permit processing, utility coordination, right-of-way acquisition support, grant application assistance, constructability reviews, agency coordination, and project file maintenance from conception through construction. A pre-proposal meeting was held on July 10, 2026, with proposals due August 17, 2026 at 5:00 p.m. via eContract Philly. The City anticipates making two separate awards with two consultant firms. The contract term runs from January 4, 2027 through January 3, 2028, with the City holding options to extend for up to four additional one-year terms. Applicant interviews, if required, are scheduled for September 30, 2026, with contract execution anticipated for January 4, 2027.
The maximum compensation per contract is $1.5 million for the initial contract term, with the contract limit subject to increase if needed. Compensation will be structured through individual work orders negotiated on a project-specific basis using Cost-Plus Fixed Fee, Specific Rate, or Lump Sum methodologies; applicants must propose either fixed-price or hourly rate compensation with detailed cost breakdowns. No retainage will be withheld for project management, construction management, construction inspection services, or non-deliverable work orders. The projects under consideration for portfolio management include multiple bridge and roadway initiatives funded through sources such as SS4A 2022 and SS4A 2023 grants. All work must comply with federal FHWA and PennDOT standards and the Philadelphia 21st Century Minimum Wage and Benefits Standard. Local Business Entity certification is encouraged as a positive evaluation factor; applicants currently supporting other City projects are eligible to pursue this contract and will not be considered conflicted out solely due to their current City work. The City will adhere to PennDOT Publication 93 provisions for handling conflicts among different types of contracts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Memo
SUBJECT: Opportunity # 21260430164355 RFP Q & A
RFP TITLE: Portfolio Management
DEPARTMENT: Streets Department
SUBMISSION DATE: July 20, 2026
RFP QUESTIONS & ANSWERS
1. Is there an intent for a single contract award?
a. The City anticipates making two separate awards with two consultant firms.
2. Is the $1.5 million budget for each year or spread out over the potential five-year life of the contract?
a. The $1.5 million is the contract limit per each contract. The contract limit may be increased if needed.
3. Can you confirm whether or not the submission will require an SF 330 and/or resumes?
a. The SF 330 is required. The resumes of key staff are required as part of the SF 330. Include the resumes and SF 330 in the ‘Statement of Qualifications, Relevant Experience’ section of the proposal.
4. Is a budget or cost proposal and schedule required with the proposal?
a. A budget/cost proposal schedule is not required with the proposal. Cost and budget are not a factor within the selection process. Budget/cost proposal will be needed after selection.
5. The RFP states “evaluate methods for targeting materials for collection. Additionally, the City will be evaluating the quality of curbside set outs and evaluating tagging approaches to improve
City of Philadelphia
Department of Streets Transportation, Planning & Analysis Unit
Municipal Services Building, Suite 940
⚫ Page 2 compliance.“ Can you elaborate on the level of support the selected candidate will need to provide?
a. This is an evaluation of curb line layout and geometric design as submitted to the City and should be done the same as design work is managed by a qualified transportation engineer familiar with City code and PennDOT standards.
6. Are consultants currently supporting City projects, including Streets Department projects, eligible to pursue this contract and not be considered conflicted out solely due to their current
City work?
a. Consultants currently supporting City projects are eligible to pursue this contract.
7. Can you talk about how you anticipate conflicts to be handled with existing or new projects?
Would that include anyone on the team as well? Can the City further clarify the potential conflicts between this Portfolio Management contract and the other Design and CM/CI contracts?
a. For this federal and state funded RFP opportunity, City will adhere to the provisions of
PennDOT Publication 93, including requirements for handling of conflicts among different types of contracts. The City has contracted with multiple consultant firms for various Design and CM/CI type of contracts. To mitigate potential conflicts, the City intends to award two
(2) Portfolio Management contracts; two (2) awards will be made to two (2) consultant firms. Please be guided accordingly. Below are some projects to consider as prospective projects under the portfolio management contract.
59th St over Amtrak
• GFT
• Baker = traffic
Gay St Stairway
• JMT
30th St Viaduct from Market to Walnut
• HDR = bridge
• STV = roadway
• NTM = environmental
Leverington Ave over Manayunk Canal
• HDR
• STV = roadway
70,71,72 Sts over Amtrak
• AECOM
⚫ Page 3
• NTM = substructures/foundations
Green Lane over Schuylkill River
• Baker
• Navarro & Wright
Spring Garden St over Amtrak
• HDR
• GFT = substructure analysis
Bridge Paint Contract
• GFT
• HDR
Margie St over Amtrak
• M&M
Old York Road
• Design Fund Sources: SS4A 2022
• Design Obligation: 05/2031
• Construction Fund Source: SS4A 2023
Hunting Park Avenue
• Design Fund Sources: None identified as this time
• Design Obligation: N/A
• Construction Fund Source: SS4A 2023
• Construction Obligation: Anticipated at 05/2032 (5 Years after grant is signed)
Lehigh Avenue
• Project may come to Design Unit
• Design and Construction Source: Unknown at this time
• Obligations: Unknown