Q&A 3.pdf
PDF 288 KB Posted
- Solicitation number
- RFP-10060
- Issued by
- Volusia County, Florida
About this file
This document contains Questions and Answers #3 from the Florida Department of Transportation (FDOT) related to a solicitation for the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations contract. The solicitation includes four separate projects: Project 1 (Universal Crossovers), Project 2 (Rail Renewal), Project 3 (Surfacing), and Project 4 (MOW Siding). The solicitation requires technical and price proposals, which are due by October 2, 2024, at 10:00am. A mandatory pre-proposal meeting was held on September 4, 2024. The contract will be awarded by FDOT District Five, which serves Volusia County and surrounding areas.
The document provides clarification on several scope of work items, including the storage condition of special trackwork materials, the extent of owner-supplied track material, the work required at grade crossings, and the civil work completed for the MOW Siding project. The overall contract opportunity is focused on track infrastructure improvements along the CFRC, with a combination of crossover, rail renewal, surfacing, and siding work across multiple locations. Pricing and licensing requirements are standard for FDOT public works contracts in Florida.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
JARED W. PERDUE, P.E.
SECRETARY
Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov
Questions and Answers # 3
ADVERTISEMENT NUMBER: DOT-RFP-25-5002-TIML SunRail DESCRIPTION: Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations
DATE: 9/11/2024
1. Project 1 (Universal Crossovers) – Please clarify if the special trackwork material stored at 523 N.
Garland Avenue is panelized or loose.
Answer: Crossovers panelized except the crossover “common ties”, 15 - 23 ft long ties.
2. Project 1 (Universal Crossover) – Section 3.1.1 of the Scope of Services document notes that
Contractor shall supply “OTM”. It is assumed that this is limited to track spikes and rail anchors only. Please confirm.
Answer: correct
3. Project 2 (Rail Renewal) includes the replacement of rail through several grade crossings.
Please clarify the scope of work at these locations.
Answer: At grade crossing cut existing rail at the grade crossing welded joints and match new rail to existing grade crossing rail. Assume no transition rails are required. All rail cuts shall be staggered in accordance with the CFRC MWI 801-06 CFRC Welding Manual.
4. Project 4 (MOW Siding) shows a 700’ underdrain on the plan & profile drawing which is not mentioned in the Scope of Services document. Please clarify.
Answer: The civil work including the underdrain is complete. The Project 4 scope of work is only for the construction of the MOW Storage track – ties, rail, fasteners, ballast, etc. See
Addendum 4 for revised MP806.3 Storage Track Plan.