Q&A 1 OBR.pdf
PDF 288 KB Posted
- Solicitation number
- ITB-10438
- Issued by
- Seminole County, Florida
About this file
This document is a Question and Answer summary related to an Invitation to Bid (ITB) issued by the Florida Department of Transportation (FDOT) for the complete roof replacement at the Oviedo Operations Barn in District Five. The ITB seeks price proposals for this project due no later than October 22, 2024 at 10:00 AM. There is no required pre-bid meeting, but a voluntary site visit is outlined in the ITB. The project does not require a performance bond. Prospective bidders must be registered in the State of Florida's MyFloridaMarketplace system, properly licensed if required, and authorized to do business in the state.
The ITB indicates that the project will be funded through FDOT and is subject to the 1% MFMP Transaction Fee. It also outlines compliance requirements related to Title VI of the Civil Rights Act and other nondiscrimination statutes. The contractor will be required to comply with the Inspector General reporting requirements per Florida Statutes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOT-ITB-25-5006-OBR Complete.pdf | ||
| DOT-ITB-25-5006-OBR Complete.pdf | ||
| DOT-ITB-25-5006-OBR Complete.pdf | ||
| Q&A 1 OBR.pdf | ||
| Q&A 1 OBR.pdf | ||
| Addendum 1 - OBR.pdf | ||
| Addendum 1 - OBR.pdf | ||
| DOT-ITB-25-5006-OBR Complete.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
605 Suwannee Street
Tallahassee, FL 32399-0450
JARED W. PERDUE, P.E.
SECRETARY
Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov
Questions and Answers #1
ADVERTISEMENT NUMBER: DOT-ITB-25-5006-OBR
DESCRIPTION: District Five Oviedo Operations Barn-Complete Roof Replacement
DATE: 10/1/2024
1. Does this project require a performance bond?
Answer: Per Special Condition 12 of the ITB, “A performance bond is not required for this project.”
2. Is there a required pre-bid meeting?
Answer: No. See Special Condition 8 of the ITB for details on the Site Visit.
File details come from the government source that posted it. Updated .