This document contains the Questions and Answers for the Community College Grant Funding Opportunity to Support Behavioral Health Needs of the Campus Population (BPM043391/BHA24-007) announced by the Maryland Department of Health-Behavioral Health Administration (MDH-BHA). The grant provides one-time funding of up to $100,000-$150,000 per community college, with a total budget of $3.2 million for multiple awards. The scope of work is separate from the project narrative, and the work plan should outline how the applicant plans to achieve the goals with timelines and deliverables. The transmittal letter and cover letter are the same document.
The grant funding is for a 12-month duration from May 10, 2024 to April 30, 2025. There are no mandatory documents beyond the application materials, and the submission does not require an Attachment C, as this was noted in error. The grant is a one-time funding opportunity, and MDH-BHA intends to make multiple awards as a result of this Request for Applications (RFA).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Community Colleges BHA Support RFA final. 4.3.24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q + A’s for Community College Grant Funding Opportunity to Support
Behavioral Health Needs of the Campus Population
BPM043391/BHA24-007
1) What is the grant amount (range/max)?
MDH is offering one-time grants for community colleges of up to $100,000-150,000. BHA has budgeted $3.2 million for this project and intends to make multiple awards as a result of this
RFA.
2) The submission checklist on page 39 references an Attachment C, however, no attachment C is located in the RFA. Is there another Attachment C?
There is no attachment C. This was noted in error.
3) What are the Mandatory Documents in 4.3.1.3? Are there mandatory documents that are required in the submission?
This section was left blank, as there are no other mandatory documents.
4) Is the Scope of Work separate from the Project Narrative or is it apart of the Project Narrative?
The Scope of Work is separate from the Project Narrative.
5) Is the Work Plan simply the Project Narrative or is something else required?
The work plan can describe how the applicant plans to achieve the goals outlined in the project narrative with applicable timelines and deliverables.
6) I see where we are to submit a cover letter as part of the application. Later in the solicitation, there is reference to a transmittal letter with similar requirements that is to be submitted as part of the project narrative. Are these two documents the same thing?
The transmittal letter and cover letter are the same document.
| BPM043391/BHA24-007 |
| 1) What is the grant amount (range/max)? |
| 2) The submission checklist on page 39 references an Attachment C, however, no attachment C is located in the RFA. Is there another Attachment C? |
| 3) What are the Mandatory Documents in 4.3.1.3? Are there mandatory documents that are required in the submission? |
| 4) Is the Scope of Work separate from the Project Narrative or is it apart of the Project Narrative? |
| 5) Is the Work Plan simply the Project Narrative or is something else required? |
| 6) I see where we are to submit a cover letter as part of the application. Later in the solicitation, there is reference to a transmittal letter with similar requirements that is to be submitted as part of the project narrative. Are these two document... |