This document is a Responses to Questions document from the Housing Authority of the City of Aurora (AHA) for RFP20240604 Construction Oversight/Owner's Representative, addressing clarifications for a new construction project called Sanctuary on Potomac. The RFP seeks an owner's representative to assist with construction management for a 43-unit permanent supportive housing development located at 1280 S. Potomac Street in Aurora, Colorado. The owner's representative will help select the general contractor, advise the design and construction team through design development to construction documents, and provide construction oversight throughout the project. Candidate interviews are anticipated for July 8 and 9th, with a planned construction start date of May 2025.
The project has a $15 million development budget and has been awarded federal 9% tax credits. The development will be constructed on 0.70 acres and consist of one four-story building with one-bedroom units. Current project documents are at 50% Design Development stage, with site plan approval from the City of Aurora already obtained. The RFP clarifies several discrepancies in the original document, specifically confirming the project involves new construction with no renovation of existing facilities, and there are no relocation services included. The anticipated project timeline considers both City of Aurora entitlements and Colorado Housing and Finance Authority (CHFA) tax credit timelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP20240604 Sanctuary Potomac Owners Rep.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP20240604 Construction Oversight/Owner’s Representative Responses to Questions June 18, 2024
1. What is the Cost of Implementing Relocation Services referencing?
This was an error in the RFP. No relocation services will be included in Sanctuary on Potomac
2. The project is listed as a new construction, can you con�irm there are no separate existing facilities that require renovation?
AHA con�irms this a new construction project, there are no separate facilities requiring renovation.
3. Preconstruction and Construction Services are listed as part of the RFP. What further scopes that could be required but not addressed in this proposal be expected to be part of the "Not to Exceed Price"?
The owner’s representative will be expected to help select the general contractor, advise the design and construction team as they move from 50% DD to 100% construction documents, and provide construction oversite throughout the construction period.
4. Please clear up the discrepancy between RFP Section 1. Summary (43 units, $15M) with Section 4. (72 units, $17M).
Section 4 was incorrect and not updated accurately. This is a 43 unit project with a $15 M development budget.
5. What is the status of your plan documents?
We currently have 50% DD design documents and site plan approval from the City of Aurora. The anticipated construction start date of May 2025 considers the City of Aurora entitlements process as well as the expectation of the CHFA tax credit timelines.
6. The RFP mentions both 43-unit and 72-units, please con�irm the correct number of units.
The correct number of units is 43.
7. The RFP mentions both $15M and $17M, please con�irm the correct estimate for construction costs.
The correct estimate is $15M.
8. When would candidate interviews occur?
Candidate interviews are anticipated on July 8 and 9th.