PZ-484-230-003 scope of work-approved_.pdf

PDF 387 KB Posted

Attached to
PZ-484-230-003 Maryland State Police Headquarters, Building J--Roof Replacement, Pikesville, MD
Solicitation number
BPM037581
Issued by
Baltimore County, Point of Rocks CDP, Maryland

About this file

This document is a project manual for the roof replacement of Building "J" at the Maryland State Police Headquarters in Pikesville, Maryland. The work consists of furnishing all labor, material, equipment, insurance, and services necessary to complete the roof replacement project. The project is being managed by the Maryland Department of General Services (DGS) under Project No. PZ-484-230-003.

The project requires the successful contractor to remove and dispose of the existing roofing system, repair or replace any deteriorated deck, install new multi-layered insulation, and provide an adhered thermoplastic membrane roofing system with associated components. The work is to be completed within 180 calendar days from the notice to proceed, with liquidated damages of $250 per calendar day for late completion. Minority Business Enterprises are encouraged to respond to this solicitation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

ROOF REPLACEMENT

BUILDING “J”

AT

MARYLAND STATE POLICE HEADQUARTERS

1111 REISTERSTOWN ROAD

PIKESVILLE, MARYLAND 21208

BALTIMORE COUNTY

FOR THE

DEPARTMENT OF GENERAL SERVICES

DGS PROJECT NO. PZ-484-230-003

CLASSIFICATION CODE A

March 27, 2023

NOTICE:

“Minority Business Enterprises are Encouraged to Respond to this Solicitation”

STATE OF MARYLAND

DEPARTMENT OF GENERAL SERVICES BOARD OF PUBLIC WORKS

Atif Chaudhry, Secretary Wes Moore, Governor

301 West Preston Street Brooke E. Lierman, Comptroller

Baltimore, MD 21201 Dereck E. Davis, Treasurer

DIVISION 0 - PROCUREMENT & CONTRACTING REQUIREMENTS

- Notice To Bidders - Solicitation Fact Sheet (eMaryland Marketplace Advantage attachment)

- Instructions to Bidders for Construction Projects (March 2022) (eMaryland Marketplace Advantage attachment)

- General Conditions for Construction Contracts (July 1, 2022) (eMaryland Marketplace Advantage attachment)

- Bid Proposal Affidavit (eMaryland Marketplace Advantage attachment)

- Payment of Employee Health Care Expenses Certification (eMaryland Marketplace Advantage attachment)

- Contractors Questionnaire

- Bid Bond, if applicable (eMaryland Marketplace Advantage attachment)

- Minority Business Enterprise Utilization Procedures (February 5, 2021) (eMaryland Marketplace

Advantage attachment)

- MBE Attachment D-1A Forms (eMaryland Marketplace Advantage attachment)

- List of Prevailing Wage Rates, if applicable

- Addenda, if any (eMaryland Marketplace Advantage attachment)

- List of Drawings

- Pre-Bid Conference/Site Visit – Refer to: State Finance and Procurement Article §14-

302(a)(7)(v) and COMAR 21.11.03.09.C.(2)(e).

General Scope of Work:

The successful contractor shall provide all labor, equipment, tools, materials, supplies, and insurances required for replacement of roof.

Description of Work:

1. The work to be accomplished under this contract is located at the Maryland State

Police Headquarters building automotive shop (bldg. “J”), 1201 Reisterstown Road, Pikesville, Maryland 21208. It consists of furnishing all labor, material, equipment, and services necessary and incidentals to the completion of the work described therein.

2. Base Bid: Replace roof. (approximately 2,838 sq.ft.)

3. All work shall be completed within one hundred and eighty (180) calendar days from the date designated by the notice to proceed. Liquidated damages are $250 per calendar day.

Roof Replacement

DIVISION 01 - GENERAL REQUIREMENTS

011100 SUMMARY OF WORK 011100 – 1 – 7

012200 UNIT PRICES 012200 – 1 – 2

013300 SUBMITTAL PROCEDURES 013300 – 1 – 7

015000 TEMPORARY FACILITIES AND CONTROLS 015000 – 1 – 7

016500 PRODUCT DELIVERY REQUIREMENTS 016500 – 1 – 3

017700 CLOSEOUT PROCEDURES 017700 – 1 – 3

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY 061000 – 1 – 4

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

072200 ROOF AND DECK INSULATION 072200 – 1 – 4

075419 THERMOPLASTIC ROOFING 075419 – 1 – 5

076000 FLASHING AND SHEET METAL 076000 – 1 – 8

077200 ROOF ACCESSORIES 077200 – 1 – 2

SECTION 011100 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section outlines the scope of work included in the roof replacement at the Maryland State Police

Headquarters Automotive Shop (Building J), Pikesville, MD 21208. Refer to the appropriate specification section for further information about installation methods and components to be provided. In general, the work includes, but is not limited to, the following items:

1. Remove and dispose of existing roofing systems and components, including membrane, insulation, base sheets, flexible and metal flashings, and associated materials and components.

Remove any abandoned rooftop units and miscellaneous penetrations (Division 02 Section

“Selective Structure Demolition”).

2. Repair or remove and replace existing deteriorated deck

3. Provide wood blocking at perimeter edges, walls, fascias, and penetrations (Division 06 Section

“Rough Carpentry”).

4. Provide new multi-layered insulation systems throughout the roof areas (Division 07 Section

“Roof and Deck Insulation”).

5. Provide adhered thermoplastic membrane roofing system, base flashings, strippings, and associated components (Division 07 Section “Thermoplastic Roofing”).

6. Provide perimeter and penetration sheet metal flashings and counterflashings and miscellaneous sheet metal fabrications (Division 07 Section “Flashing and Sheet Metal”).

7. Provide roof scupper assemblies at existing roof scupper locations and down spouts to match existing.

8. Remove and replace all roof drains.

9. Remove unused rooftop equipment and repair decking.

1.2 PROJECT CONDITIONS

A. The building will be occupied and in use during construction. Take necessary precautions to create as little disturbance or disruption to the building and its occupants as possible during the work.

B. Supply, install, and maintain barriers, protection, warning lines, lighting, and personnel required to segregate the work area(s) from pedestrian or vehicular traffic, as well as to prevent damage to the building, its occupants, and the surrounding landscaped and paved areas. The Contractor shall observe all applicable OSHA and MOSHA requirements.

C. Schedule and execute work without exposing the building interior to the effects of inclement weather. Protect the building and its occupants against such risks and repair/replace work related damage to the Owner’s satisfaction.

D. The Contractor shall not be responsible for reported roof related leaks which exist prior to initiating work in the leak areas. The Contractor shall be responsible for all roof related leaks and damage to existing roofing at all locations in which he has initiated work, to include trafficking and materials storage. If damage occurs, the Contractor shall repair damaged areas. Provide and maintain necessary protection and repairs to existing roofing to prevent interior leakage.

E. Any work, material, or supplies which have not been specifically mentioned but are reasonably implied and is necessary for the safe and satisfactory completion of the entire project are to be included and installed by the Contractor.

F. Do not install roofing systems or sealants during precipitation, including fog, or when air temperature is below 40° F (4° C) or is expected to go below 40° F (4° C) during application, or when there is ice, frost, moisture, or visible dampness on the roof.

G. Phased or temporary construction will only be permitted as specified. Schedule, execute, and coordinate work on a daily basis so that components are installed completely and permanently as specified.

H. Schedule, coordinate, and execute work to avoid traffic on completed roof areas. Coordinate work to prevent this situation by working away from completed roof areas, toward roof edges and access ways.

I. Roofing that is removed shall be made 100% weathertight in the same day’s operations.

J. Supply shoring, supports, and other items or materials necessary to brace and support the structure, fixtures, and facilities affected by the work. This includes, but is not limited to, heating and air handling ducts, lighting, rooftop equipment and other items presently supported by or suspended from the roof decks to be removed and associated structural members. Supply temporary walkways and ramps necessary to remove existing decking systems and install the replacement deck materials.

K. Roof construction and materials shall comply with these specifications and the latest editions of the following:

1. Sheet Metal and Air Conditioning Contractors National Association (SMACNA)

2. The National Roofing Contractors Association (NRCA) “Roofing and Waterproofing

Manual”

3. The Asphalt Roofing Manufacturers Association (ARMA).

4. Factory Mutual Global (FMG) publications “Loss Prevention Data for Roofing

Contractors” and “Building Materials Approval Guide”

5. Underwriters Laboratories, Inc. “Roofing Materials and Systems Directory”

6. All work shall be performed in accordance with the International Building Code (IBC) in effect at the time of Bid and applicable Federal, State, and local code amendments, requirements, and publications.

L. All workmanship and materials shall be of the best construction practice. Should a conflict arise between the specification requirements and those of the referenced publications, the better quality or more stringent requirement will prevail. Specification requirements that exceed the minimum requirements of the manufacturer shall be complied with by the Contractor.

M. Coordinate the work in this Section with other Sections, including preparatory work, building protection, daily clean-up, and protection of building, and occupants.

N. Supply labor, vacuums, tools and appliances necessary to keep the interior and exterior building and site areas below and around the construction clean, with as little accumulation of dust and debris as possible on a daily basis.

1.3 REFERENCES

A. Applicable publications: Publications listed herein form a part of this Specification to the extent referenced and are indicated in the text by basic designation only. Applicable publications referenced shall be those that were issued and in use at the time of the Bid Submission.

1.4 PRECONSTRUCTION CONFERENCE

A. A preconstruction conference will be held with the Owner, Owner’s Representatives, Contractor, and involved trades to discuss all aspects of the project. The Contractor's foreman or field representative will attend this conference. The foreman must be English-speaking and shall be on site at all times that work is performed.

B. The Owner shall reserve the right to require an alternate superintendent and/or foreman.

C. Delivery of materials and commencement of construction shall not proceed until the preconstruction conference is held. Delays in obtaining a complete set of submittals shall not extend the contracted completion date.

1.5 EMERGENCY RESPONSE

A. The Contractor shall provide the Owner with after-hours (24 hour) emergency telephone numbers of the Contractor’s superintendent and foreman.

B. The Contractor must respond to emergency situations or calls within two (2) hours.

1.6 CONSTRUCTION SCHEDULE

A. It is the intent of the Owner to have portions of the existing roof assembly removed and replaced in a completed, watertight condition on a daily basis.

B. Proper coordination of all aspects of the work by the Contractor and any sub-trades is critical to ensure proper installation and performance of the work. The Contractor’s Construction Schedule shall clearly outline the coordination between job tasks of all involved disciplines. Subject to review and acceptance by the Owner, this Schedule will be strictly adhered to by the Contractor and sub-trades.

C. The Contractor’s Construction Schedule shall clearly identify the on-site crew foreman and the size of the crew to be utilized. The crew size shall remain consistent, and work shall be continuous throughout the project, from start-up to completion.

D. Department of General Services shall review the Contractor’s Construction Schedule prior to the start of any work. After defining the location(s) of the work progress, the Owner shall arrange to control occupancy in the building to the greatest extent possible. It shall be the responsibility of the Contractor to supply the Owner with written notice, 72 hours in advance, if his work location(s) for a workday is different from the schedule. The Contractor shall update his

Construction Schedule weekly and submit a copy to the Owner for review.

E. The Contractor shall schedule periodic site visits by the Membrane Manufacturer providing the warranty during the construction period. Announce the Manufacturer’s site visit (inspection) to the Owner 72 hours prior to its occurrence. Visits by the Manufacturer's Representative shall be made prior to project start-up, one week into the start of construction, with inspections prior to the installation of the membrane surfacing, at project completion, and as requested by the Owner.

The Contractor shall provide the Department of General Services a copy of the Manufacturer’s written report for each inspection, indicating Manufacturer’s comments pertaining to installation of materials and any corrective recommendations. In addition, the Contractor is responsible to notify and obtain acceptance from the Membrane Manufacturer on detail changes that may affect the roof system warranty.

1.7 SCHEDULE OF VALUES

A. Provide a line item breakdown of construction labor and materials costs for each Specification

Section included in these Contract Documents. Additionally, provide line item values for Unit

Price, Alternate, and Allowance Work included in these Specifications. Utilize AIA Forms G702 and G703 to prepare and submit the Schedule of Values.

1.8 WORK HOURS

A. The Contractor will be allowed to work on the roof between the hours of 7:00 am and 4:00 pm, local time, Monday through Friday. Work outside these hours may be allowed with 72 hours minimum written notice to the Owner. The Owners reserves the right to disapprove or suspend a request to work outside of normal working hours. The cost of providing building maintenance personnel onsite for weekend work shall be borne by the Contractor.

1.9 PROGRESS MEETINGS

A. Progress meetings shall be scheduled bi-weekly by the Department of General Services or as deemed necessary.

1.10 DIMENSIONS AND QUANTITIES

A. Verify dimensions and quantities in the field prior to bid submission. The Project Plans and

Drawings have been compiled from various sources and may not reflect the actual field conditions at the time of construction.

B. The Contractor is solely responsible for means and methods of construction. Make necessary investigations to become familiar with the project conditions.

C. Additional compensation due to unfamiliarity with project conditions will not be considered.

D. In case of inconsistency between Drawings and Specifications or within either document, the better quality and/or greater quantity of work shall be provided, as determined by the Department of General Services.

1.11 MATERIAL AND SAFETY DATA SHEETS

A. Material safety data sheets (MSDS) shall be submitted in complete sets for all products to be used prior to any work being performed.

1.12 GUARANTEES AND WARRANTIES

A. Refer to specific Sections of this specification for systems and product warranty requirements.

Verify with Manufacturer of proposed systems and products that specified warranty requirements are acceptable, without exception, prior to selecting materials for use on this project.

B. Submit a full Contractor's Guarantee of the Work to be free from defect in materials and workmanship upon Substantial Completion, and prior to final payment. This Guarantee shall be for a period of two (2) years from the date of Substantial Completion, and shall be signed by a

Principal of the Contractor’s firm, and sealed if a corporation.

C. Submit a letter from the Manufacturer acknowledging completed work and that warranty remains in effect.

1.13 CLEAN-UP

A. Restore property of the Owner to its original condition prior to the start of construction. Refer to

Division 01 Section “Temporary Facilities and Controls.” General clean-up of the site shall be performed on a daily basis.

B. Clean, restore, and/or replace items stained, dirtied, discolored, or otherwise damaged due to the

Work, as required by the Owner.

C. Clean roof, building (interior and exterior), landscaped areas, and parking areas so they are free of trash, debris and dirt caused by or associated with the Work.

1.14 PERMITS

A. The Contractor will obtain and pay for any and all permits required to perform the work.

1.15 OWNER OCCUPANCY

A. Owner will occupy premises during entire construction period. Cooperate with Owner in scheduling operations to minimize conflict with Owner’s use of facility.

B. Predetermine and obtain approval, in advance from Department of General Services, for vertical and horizontal transportation of labor and construction materials onto and off of the building roof.

C. Do not transport labor or construction materials to the roof via the interior of the facility.

1.16 PRE-JOB DAMAGE SURVEY OF FACILITY

A. Perform a thorough pre-job survey of property and all affected and adjacent areas of the building with Owner prior to starting the work in order to document existing damage. Damaged items identified during the survey will not be the responsibility of Contractor unless further damaged by Contractor during execution of project.

1.17 CORRECTION OF DAMAGE TO PROPERTY

A. Consider any damage to building or property not identified in the pre-job damage survey as having resulted from execution of this Contract and correct at no additional expense to Owner.

B. Repair, immediately, damages to facility or site that present a safety hazard or danger to the public.

1.18 SUMMARY OF PROJECT REQUIREMENTS

A. The Work requirements of the Contract are summarized by reference to the Bidding

Requirements, the Contract forms, the Conditions of the Contract, the Specification, the

Drawings, and Addenda and Contract Modifications, including, but not limited to, the printed matter referenced in these requirements. It is recognized that the Work is affected or influenced by governing regulations, natural phenomenon (including weather conditions), unforeseen conditions uncovered by the Work, and other forces outside of the Contract Documents.

END OF SECTION 011100

SECTION 013300 - SUBMITTAL PROCEDURES

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Department of General Services responsive action.

B. Informational Submittals: Written information that does not require Department of General

Services responsive action. Submittals may be rejected for not complying with requirements.

1.3 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Department of General Services reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the

Contract Time will be authorized because of failure to transmit submittals enough in advance of the

Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Department of General Services will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 6 by 8 inches on label or beside title block to record

Contractor's review and approval markings and action taken by Architect.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Architect.

d. Name and address of Contractor.

e. Name and address of subcontractor.

f. Name and address of supplier.

g. Name of manufacturer.

h. Submittal number or other unique identifier, including revision identifier.

1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 061000.01.A).

i. Number and title of appropriate Specification Section.

j. Drawing number and detail references, as appropriate.

k. Location(s) where product is to be installed, as appropriate.

l. Other necessary identification.

D. Deviations: Deviations from specifications are considered substitutions. Highlight, encircle, or otherwise specifically identify deviations from the Contract Documents on submittals as proposed substitutions. Further identify deviations by providing a written description for each deviation or variation from the contract documents.

E. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

F. Transmittal: Package each submittal individually and appropriately for transmittal and handling.

Transmit each submittal using a transmittal form. Architect will discard submittals received from sources other than Contractor.

G. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked "Approved or approved as noted."

H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

I. Use for Construction: Use only final submittals with mark indicating "Approved or approved as noted" taken by Architect.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Compliance with specified referenced standards.

4. Number of Copies: Submit four copies of Product Data, unless otherwise indicated.

Department of General Services will return two copies. Mark up and retain one returned copy as a Project Record Document.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop

Drawings on reproductions of the Contract Documents or standard printed data, unless submittal of

Architect's CAD Drawings is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Shopwork manufacturing instructions.

f. Templates and patterns.

g. Schedules.

h. Notation of coordination requirements.

i. Notation of dimensions established by field measurement.

j. Relationship to adjoining construction clearly indicated.

k. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop

Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

3. Number of Copies: Submit two opaque (bond) copies of each submittal. Architect will return one copy.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.

b. Product name and name of manufacturer.

c. Sample source.

d. Number and title of appropriate Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line.

Architect will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials;

complete units of repetitively used materials; swatches showing color, texture, and pattern;

color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three sets of Samples. Architect will retain two Sample sets;

remainder will be returned.

E. Product Schedule or List: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location.

1. Number of Copies: Submit three copies of product schedule or list, unless otherwise indicated.

Architect will return one copy.

F. Construction Schedule: Construction schedule showing sequence and duration of activities.

G. Schedule of Values: Itemize separately labor and materials for each technical section within the

Specification as they will be shown on the Application for Payment (use AIA form G703).

H. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design.

1. Number of Copies: Submit three copies of subcontractor list, unless otherwise indicated.

Architect will return one copy.

2.2 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated.

Architect will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements specified in Division 01 Section

"Quality Requirements."

B. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

C. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification

(WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified.

D. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that

Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

E. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

F. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

I. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

J. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

K. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections. Include the following, as applicable:

1. Statement on condition of substrates and their acceptability for installation of product.

2. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

3. Results of operational and other tests and a statement of whether observed performance complies with requirements.

L. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage.

M. Material Safety Data Sheets (MSDSs): Submit information directly to Owner; do not submit to

Architect.

1. Architect will not review submittals that include MSDSs and will return them for resubmittal.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Department of General Services.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. END OF SECTION 013300

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

1.1 SUMMARY

A. This Section includes requirements for the provision and utilization of temporary facilities to protect the Owner’s property, the site, and construction materials, and for daily maintenance and cleanup of the site during the project.

1.2 CONTRACTOR’S USE OF EXISTING FACILITIES

A. Limit use of the premises to the work indicated, so as to allow for the Owner's uninterrupted occupancy and use. Confine operations to the areas indicated under the Contract. Conformance to the regulations set forth by the Owner regarding use of existing facilities is mandatory.

B. Sanitary facilities shall be provided by the Contractor. Use of the building's sanitary facilities is not permitted.

C. Owner will assist in controlling occupancy. Contractor shall provide and place portable barricades, as coordinated with the Owner, under work areas inside the building.

D. Clean interior and exterior areas affected by the construction on a daily basis. Do not allow construction debris, waste materials, tools, excess packaging materials or other construction related materials to accumulate on the roof, in the facility, or on the exterior grounds and pavements.

E. See Division 01 Section “Product Delivery Requirements” for product storage facilities and requirements.

1.3 UTILITIES

A. Electrical service will be provided to the Contractor free of charge by the Owner through exterior electrical outlets if available and operable. Use shall be limited to construction hours. The Owner reserves the right to charge the Contractor for excessive electrical service usage (i.e., wasteful usage). Should charges be considered, the Owner will notify the Contractor in writing of his intent, 48 hours in advance.

B. Water for construction purposes will be provided to the Contractor free of charge by the Owner through exterior water spigots if operable. The Owner reserves the right to charge the Contractor for excessive or wasteful use. Should charges be considered, the Owner will notify the Contractor in writing of his intent, 48 hours in advance. Drinking water shall be provided by the Contractor.

C. All other utilities required will be provided by the Contractor.

D. Plumbing, heating, and electrical work, including reinstallation of equipment and other work to be performed by the Contractor, shall be carried out without interference to the building's normal operation. Where work requires interruption of service, the Contractor shall make advance arrangements with the Owner for dealing with such interruption.

E. Ensure proper and safe operation and maintenance of utility systems within the construction limits, whether these are supplied by the Owner's distribution system or otherwise, until the work is accepted by the Owner. Maintain and operate appurtenances within the construction area that serve the distribution system, subject to periodic inspection by the Owner's operating personnel.

Inspection by any representative or personnel of the Owner shall not relieve the Contractor of his responsibilities in connection with operation and maintenance of these facilities and equipment.

1.4 ACCESS

A. Provide ladders, scaffolding and staging as required to access the project area(s) in accordance with OSHA and MOSHA guidelines. Should damage to the building occur, restore damaged areas to their original condition, clean up debris, and provide other access to the roof for the duration of the project.

B. Do not interfere with normal building operations. Coordinate activities with the Owner and building occupants.

1.5 BARRIERS

A. Install temporary fencing, warning lines, barriers and guards, as required, to segregate the construction areas from adjacent operational facilities, occupants and the public. In the event that access cannot be interrupted in the construction area, provide protection above doorways and walks in the construction area. Provide guard lights on barriers and lighting as necessary to prevent vandalism of work and storage areas. The Owner is not responsible for Contractor's losses due to damage or theft by vandals.

B. Install protective coverings at paving and building walls adjacent to hoist prior to starting work.

Lap protective coverings at least 1 foot, secure against wind, and vent to prevent condensation of moisture on covered surfaces. Maintain the protective coverings in place for the duration of the project. Cover windows adjacent to Contractor operation areas with plywood.

1.6 TEMPORARY PROTECTION

A. Provide suitable Owner approved temporary protection to prevent the entrance of debris and obstructions into the building. Provide warning signs to reroute personnel around areas of dangerous work. Place warning barriers at roof perimeters and at deck openings. Clearly label temporary covers over deck openings. Do not permit openings to remain unprotected overnight.

Schedule operations to allow for completion of new roofing over a predetermined area of roof within a day's work. Use special care to avoid damaging roofing and flashing when working on the roof of the building.

B. Provide temporary tie-ins between existing and new roof systems as specified and detailed. Tie-in construction shall completely prevent interior leaks, migration of moisture from existing to new construction and damage of any type to the facility. Provide necessary quality control at tie-ins on a daily basis to prevent leaks.

C. Avoid traffic on completed roof areas. Coordinate work to prevent this situation. Should temporary access be required, provide temporary substrate protection for trafficked areas.

D. Protect drainage systems from debris accumulation during construction. Ensure roof drains and leader pipes are not restricted when Contractor is not on site.

E. Protect materials scheduled to be reused from damage by placing them in labeled containers or wrappings stored in a weathertight trailer.

F. Provide temporary protection such as plywood and tarps for streets, drives, curbs, sidewalks, landscaping and existing exterior improvements during all phases of the project.

1.7 ROOFTOP PROTECTION

A. Provide plywood walkways, with 1/2-inch thick rubber walkway pad or 1-inch thick high density insulation protection beneath, for protection of new or existing roof areas which must be trafficked, and for roof membrane protection below demolition work which occurs above new or existing roof areas.

1.8 DEBRIS REMOVAL

A. The Owner shall designate crane and refuse container locations. These areas shall be sectioned off with proper warning lines.

B. Removed materials shall not be thrown freely from the roof but shall be lowered to the ground by crane in suitable containers or in an enclosed chute, in order to reduce the spread of dust and other debris.

C. Supply adequate covered receptacles for waste, debris and rubbish. One receptacle will be allowed on site at a time, and must be immediately removed from the site when full. Clean the project area daily and prior to moving the receptacle to another location on the site. Locations shall be as permitted by the Owner. Disposal shall be off-site in a legal dump authorized to accept construction demolition solid wastes.

1.9 WEATHER PROTECTION

A. Weather protection includes temporary protection of components adversely affected by moisture, wind, heat and cold by covering, patching, sealing, enclosing, ventilating, cooling and/or heating.

Provide protection for locations within the project area as necessary, to protect the building and its contents, trafficked adjacent areas, new construction materials and accessories. The cost of heat, fuel and power necessary for proper weather protection shall be the responsibility of the

Contractor.

Installed weather protection shall comply with safety regulations, and provisions for adequate ventilation and fire protection.

1.10 VOLATILE MATERIALS

A. The Contractor is reminded that adhesives, solvents, bitumen’s, etc., are highly volatile and flammable materials. These materials, along with tools and applicators and rags, shall not be stored on or within the building. No overnight storage on the roof will be allowed. Do not transport materials through the building. Take precautions and closely follow the Specification requirements for fire protection on site during construction.

B. Locate and use flame-heated equipment so as not to endanger the structure, other materials on site, or adjacent property.

1.11 FIRE PROTECTION

A. Provide necessary temporary fire protection for the building, its contents and materials during construction. Do not store combustibles inside the building or on the roof. Store adhesives, caulks and cleaning solvents away from the building using a method approved by local fire officials.

Should cutting, burning or welding be necessary, provide a fire watch during operations and for four hours minimum after completion of the operations.

B. Do not use open flames near adhesives, caulks or cleaning solvents as they will readily ignite.

Rags soaked with cleaning solvent shall not be discarded in the dumpsters, but shall be stored in a separate metal receptacle and removed from the site daily.

C. Comply with local fire codes and obtain permits necessary from the local fire department. Provide a copy to the Owner. Provide recently tested, fully charged fire extinguishers around the storage area, rubbish receptacle and two fire extinguishers on the roof within 50 feet of the Work.

1.12 INTERIOR PROTECTION AND RESTORATION

A. Protect and cover fixed items, furniture, equipment, appliances, fixtures, bookcases, etc. within the building below the work areas.

B. At the Owner's direction, remove portable furniture, equipment, appliances, fixtures, materials, stock, etc. within the building below the work area to an adjacent area for protection.

C. Remove, temporarily support, suspend and protect existing items requiring removal during the installation of the new work and properly replace these items to their original condition and to the Owner's satisfaction. These items include but are not limited to suspended ceilings, lighting fixtures, heating and air handling ductwork, electrical conduit, etc.

1.13 CLEAN-UP

A. Clean and restore interior building spaces beneath the work areas to original condition prior to the construction.

B. Debris, dust and dirt shall be swept completely clean at the joists, beams, overhead accessories and similar items. Those items soiled or stained from the work shall be cleaned and refinished.

C. Electrical fixtures damaged by the construction shall be replaced with an equal in shape, color, manufacturer, and capacity at no added expense to the Owner.

D. Interior ceiling finishes which are damaged by the construction shall be repaired or replaced with a system equal in color, texture, and finish at no added expense to the Owner.

E. Floors shall be swept and vacuumed completely clean of dust, dirt and debris. The Owner will wash and rewax floors, but only as part of a normal or routine maintenance procedure. Heavily soiled, stained or damaged floor areas will be cleaned, repaired and/or replaced by the Contractor at no additional cost to the Owner.

F. Open ducts, grills, thermostats, electric boxes or similar fixtures and items which can be soiled or affected by the work or which might conduct dust to other areas shall be masked, protected and cleaned by the Contractor.

G. Windows, blinds, curtains, shelving, edges, lighting, etc. shall be cleaned to their original condition prior to the start of the roof renovation, and to the satisfaction of the Owner.

H. Remove completely temporary protection materials and facilities from the site upon completion of the work and demobilization of the project.

I. Restore streets, drives, curbs, sidewalks, landscaping and existing improvements disturbed by the construction operations to their condition at the start of the work.

1.14 NOTIFICATION

A. Notify the Owner's Representative at least 72 hours in advance of the desire to extend, connect, disconnect, turn on or off HVAC, steam, electric, water or other service from the Owner's supply systems. The actual operation shall be witnessed by authorized representatives of the Owner.

Plumbing, heating and electrical work, including installation of equipment and any other work to be performed by the Contractor, shall be carried out without interference with the Owner's normal operation. Where work requires interruption of a service, make advance arrangements with the

Owner for dealing with such interruption.

1.15 VEHICLES

A. Acceptable areas for the locations of the Contractor's vehicles shall be as designated by the Owner.

No other areas may be utilized without the Owner's permission.

1.16 WALKWAY COVERING

A. Install walkway coverings where designated on the drawings or above entrances which must remain accessible. The framework supporting the walkway covering shall be free-standing and well braced. The roof covering and support framing shall be designed to support a live load of at least

150 psf. The roof coverings shall be of width sufficient to cover the entire walkway or sidewalk.

A minimum height clearance of 6-feet, 8-inches, or as required to allow building doors to open, shall be maintained below coverings. Should coverings obscure the building’s address, a temporary address shall be installed so as to be visible from the street. Lettering shall be approved by the Owner. Protection shall be in accordance with all applicable OSHA standards.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Lumber and Plywood: Unless noted otherwise, comply with requirements in Division 06 Section

“Rough Carpentry.”

B. Paint: Comply with requirements in Division 09 Section “Painting.”

2.2 TEMPORARY FACILITIES

A. General: Maintain all temporary facilities and controls necessary for the performance of the

Work. Comply with all applicable codes and regulations of authorities having jurisdiction; obtain permits as required. Locate and install all facilities and controls where acceptable to the local authorities having jurisdiction, utility, and Owner and remove same and terminate, in a manner suitable to the utility owner, at completion of the Work or when otherwise directed. Pay all costs associated with the provision and maintenance of temporary facilities and controls including power, water, and fuel (if any) consumed until Substantial Completion.

B. Storage and Staging Areas: The Contractor shall be responsible for coordination, protection, and safekeeping of products stored on site under this Contract including soil cut and fill. Refer to

Contract Documents for any defined staging areas.

1. Move stored products that interfere with construction of the Work, or operations of the

Owner or separate contractors.

2. Obtain and pay for use of additional storage or staging areas as needed for the Work.

3. Provide storage areas sized to storage requirements for products of individual Sections, allowing for access and orderly maintenance and inspection of products.

2.3 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

B. Heating Equipment: Unless Owner authorizes use of permanent heating system, provide UL

Listed or FM approved vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control.

1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited.

2. Heating Units: Listed and labeled for type of fuel being consumed, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

PART 3 - EXECUTION (Not Used)

END OF SECTION 015000

SECTION 016500 - PRODUCT DELIVERY REQUIREMENTS

1.1 SUMMARY

A. This Section contains instructions and requirements for the provision and maintenance of adequate delivery, storage, and handling on site of products and materials to be utilized in the Work.

1.2 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units.

2. Store materials in a manner that will not endanger Project structure.

3. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation.

4. Store cementitious products and materials on elevated platforms.

5. Store foam plastic from exposure to sunlight, except to extent necessary for period of installation and concealment.

6. Comply with product manufacturer's written instructions for temperature, humidity, ventilation, and weather-protection requirements for storage.

7. Protect stored products from damage and liquids from freezing.

D. Deliver materials in sufficient quantity to allow continuity of work. Deliver materials to the site in original sealed containers bearing manufacturer's name and brand designation. Where materials are designated by a referenced specification, containers or packages shall bear specification number, type, and class as applicable. Do not deliver materials that are not approved for use. Remove such materials from the site immediately.

E. Store roofing materials on site in areas designated by the Owner. Materials are to be stored in box trailers or in elevated piles completely wrapped in waterproof tarps. Tilt stock piles for effective drainage and utilize tie-downs to protect tarps against wind blow-offs. Store flammable materials such as adhesives in storage containers suitable for flammable substances. Mark materials that are exposed to the elements for removal from site. Do not incorporate defective or rejected materials in the Work.

F. Handle materials with equipment selected and operated so as not to damage the materials or the roofing. Handle roll materials in a manner to prevent damage to the edges or ends.