PWS Vent Hoods and Fire Suppresion Systems DRAFT 12May21.pdf

PDF 509 KB Posted

Attached to
Kitchen Vent Hoods Cleaning and Inspection and Fire Suppression System Inspection
Solicitation number
W9124E21Q0008
Issued by

About this file

This is a sources sought notice from the U.S. Army Materiel Command Mission and Installation Contracting Command regarding kitchen vent hood cleaning and inspection services, and fire suppression system inspection services at Fort Polk, Louisiana. The notice seeks information from small businesses on their capabilities and interest to potentially set aside the requirement. Responses are due by [DATE] and should include the firm's name, point of contact, small business status and NAICS code, interest as a prime or subcontractor, relevant experience on similar requirements, pricing and delivery information, and recommendations to structure, improve, or modify the draft performance work statement, performance requirements summary, or approach. The anticipated NAICS code is 561790 with a size standard of $8 million. The incumbent contract is also provided for reference.

View the file

Other files

File Type Posted
Response Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Inspection and Cleaning of Vent Hood Exhaust and Inspection of Fire

Suppression Systems

12 May 2021

PART 1

GENERAL INFORMATION

1.0 General: This is a non-personal services contract to provide Inspection and Cleaning of Vent Hood Exhaust and Inspection of Fire Suppression Systems. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Inspection and Cleaning of Vent Hood Exhaust and Inspection of Fire Suppression Systems as defined in this Performance Work Statement except for those items specified as Government furnished property and services.

The contractor shall perform to the standards in this contract.

1.2 Background: Grease vapors produced by cooking equipment accumulate on the interior surfaces of kitchen vent hood exhaust systems. Regular scheduled cleaning of kitchen vent hood exhaust systems is required to reduce the possibility of fire in the systems. Regular scheduled inspection of the fire suppression system is required to limit the damage caused by a fire. This contract shall provide services for kitchen vent hood exhaust and fire suppression systems that are required by National Fire Protection Association (NFPA) Standard 17A and NFPA Standard 96.

1.3 Objectives:

1.3.1 Regularly scheduled inspection and cleaning of the kitchen vent hood exhaust systems to ensure components are in good working order In Accordance With (IAW) NFPA Standard 17A, NFPA Standard 96, and Louisiana RS 40-1664.

1.3.2 Regularly scheduled inspection of the fire suppression systems to ensure components are in good working order IAW NFPA Standard 17A, NFPA Standard 96, and Louisiana RS 40-1664.

1.4 Scope: The work covered by these specifications consists of furnishing all labor, equipment, and materials to perform all operations in connection with the Inspection and Cleaning of Kitchen Vent Hood Exhaust and Inspection of Fire Suppression Systems at Fort Polk, Louisiana. The work required for vent hood exhaust systems includes the removal of all grease and/or foreign matter that has accumulated on the interior of the kitchen/serving line range grease duct systems, and the inspection of these duct systems by Louisiana State Certified inspectors. The removal of this matter is required periodically to prevent a fire hazard. The work required for fire suppression systems inspection includes, but is not limited to checking all remote manual pull stations, mechanical or electrical devices, detectors and actuators for proper operation. Contractor is responsible for verifying the existing conditions.

Contractor shall supply all material, labor and equipment as required.

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years.

The Period of Performance reads as follows:

Base Year

Option Year I Option Year II

1.6 General Information

1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1, Contractor Inspection Requirements).

1.6.1.1 The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractor’s QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government.

The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis;

procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation. The QCP is to be delivered with the Contractor’s proposal, and a copy of a comprehensive written QCP shall be submitted to the KO COR within 5 working days when changes are made thereafter. The Contractor’s QCP shall be incorporated into, and become part of, this contract after the plan has been accepted by the KO. After acceptance of the quality control plan the contractor shall obtain the Contracting Officer’s acceptance in writing of any proposed change to their QC system.

1.6.1.2 Non-Conformance Report (NCR): When the Contractor does not meet contract requirements, a nonconformance report may be issued. The NCR is a tool to document and address all contractual nonconformance (deficiencies) when contract remedies are not used. NCR is a letter to a Contractor that identifies nonconformance with a contract requirement and requests Contractor corrective action with the purpose to both correct the immediate nonconformance and also prevent recurrence. The Contractor shall reply in writing prior to the suspense date. The response shall include an explanation for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract.

1.6.3 Federal Government Holidays: The Contractor is not required to perform services on holidays, including a Presidential declared “Excused Absence” such as for Christmas Eve. When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies.

New Year’s Day 1st day of January Birthday of Martin Luther King Jr. 3rd Monday of January Washington’s Birthday 3rd Monday of February Memorial Day Last Monday of May Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December

1.6.4 Hours of Operation: The contractor is responsible for conducting business IAW schedules coordinated with the COR, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel shall not exceed a 40 hour work week; the contractor can expect that a very large portion of all scheduled work under this requirement will only be able to be performed outside of normal business hours (8:00 AM CST to 4:30 PM CST). A typical range for this work can only be performed from 5:00 PM CST to 6:00 AM CST. Facilities are subject to closure on short notice, that may require a revision to the previously scheduled service time(s). Scheduled service time(s) may also be impacted by the closure of facility(ies) and the Government may require performance during normal business hours (instead of outside of normal business hours).

1.6.5 Place of Performance: The work to be performed under this contract will be performed in kitchens and dining facilities, serving line areas, attics, and on the roofs of buildings located on Fort Polk as indicated on Technical Exhibit 3 – Equipment and Facility Listing.

1.6.6 Type of Contract: The Government will award a firm-fixed price contract.

1.6.7 Security Requirements: Contractor personnel (to include subcontractors) performing work under this contract must have a favorable National Agency Check with Inquiries (NACI). The Contractor shall ensure all employees performing work under this contract complete a NACI through the Personnel Security Investigation Portal (PSIP) by working with the COR and initiating a request through Security and Intelligence Division (S&ID) no later than 15 days from the date of hire and completing the investigation (submission to OPM) within 30 days, and must maintain the level of security required for the life of the contract.

1.6.7.1. Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

Installation Physical Security

1.6.7.2. Contractors must provide an access roster to Directorate of Emergency Services (DES), Physical Security Office of all employees monthly or when any personnel change occurs for access to Fort Polk. An access roster will also be furnished to the Security and Intelligence Division (S&ID), DPTMS quarterly or upon request. Access rosters must be forwarded by the COR to the visitors control center using a specific format electronically from a government computer. All personnel employed under this contract will adhere to all Fort Polk access control policies which include, weapons registration, transportation of weapons on the installation, access control policies, use of installation passes and ID cards and the operation of motor vehicles.

1.6.7.3. A check of records through the National Crime Information Center (NCIC) Interstate Identification Index (III) is the Army minimum baseline background check for entrance onto Army installations for non-CAC holders to include entrance of visitors. Contractors will identity proof all employees using E-verify and ensure that no illegal immigrants are employed under the umbrella of this contract.

1.6.7.4. The contractor shall provide employees with company identification (ID) cards prior to their commencement of work. The ID format is subject to approval by the government. IDs shall be laminated and include the company's name, ID number, issue and expiration dates, employee name, job title and color photograph.

Employees shall wear ID cards on front exterior clothing, above the waist, when performing under the Performance of Work Statement (PWS) unless otherwise specified herein or approved by the government.

1.6.7.5. and 1.6.7.6 Reserved.

1.6.7.7. Environmental Specifications.

Contractors performing activities on Fort Polk shall comply with the following applicable environmental requirements:

1.6.7.7.1. Compliance with Environmental Laws and Regulations: Comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), and JRTC and Fort Polk Regulations. Immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, provisions of Army Regulation 200-1, JRTC and Fort Polk Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR) and the Directorate of Public Works, Environmental and Natural Resources Management Division (DPW-ENRMD).

1.6.7.7.2. Compliance with all Federal Acquisition Regulation Provisions: Comply with all applicable Federal Acquisition Regulation (FAR) clauses outlined in FAR Subpart 52.223-1 Biobased Product Certification; FAR Subpart 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts; FAR Subpart 52.223-3 Hazardous Material Identification and Material Safety Data; FAR Subpart 52.223-4 Recovered Material Certification; 52.223-5 Pollution Prevention and Right-to-Know Information; 52.223-7 Notice of Radioactive Materials; 52.223-9 Estimate of Percentage of Recovered Material Content for EPA- Designated Items;

52.223-10 Waste Reduction Program; 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons; 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners; 52.223-15 Energy Efficiency in Energy-Consuming Products; 52.223-17 Affirmative Procurement of EPA- designated Items in Service and Construction Contracts; 52.223-19 Compliance with Environmental Management Systems; 52.223-20 Aerosols; and 52.223- 21 Foams.

1.6.7.7.3. Compliance with Green Procurement Requirements: Follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient;

materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

1.6.7.7.4. Compliance with Licenses and Certifications Requirements: Obtain all licenses and certifications required by federal, state, and local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by federal, state, and local environmental laws and regulations to the appropriate federal, state, and local authority and/or agency as necessary to adhere to the specification of this contract.

1.6.7.7.5. Notification of Federal and State Regulators: Notify immediately DPW-ENRMD and COR of the arrival on site of any federal, state, and/or DoD environmental regulator or Enforcement agent and/or the receipt of any correspondence from a federal or state environmental agency.

1.6.7.7.6. Inspections of Work Sites: Submit to potential federal, state, Army and installation work site environmental regulatory inspections and/or investigations into non-compliances, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements.

If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality. Typical environmental work site inspections are conducted in less than 15 minutes with an approximate frequency of one inspection every two months.

1.6.7.7.7. Reporting Non-Compliance: Report immediately any nonconformance and/or noncompliance with applicable federal, state or local environmental laws, Army and installation environmental regulations to the COR and DPW-ENRMD.

1.6.7.7.8. Verification of National Environmental Policy Act Documents: Obtain from the COR and/or DPW- ENRMD, a copy of the installation’s completed National Environmental Policy Act analysis and associated decision document (Environmental Impact Statement and Record of Decision); Environmental Assessment and Finding of No Significant Impact; or Record of Environmental Consideration on the proposed contract actions prior to commencement of such actions.

1.6.7.7.9. Environmental Management System: The Contractor shall take the necessary actions to identify, monitor, and control those operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment in accordance with Fort Polk’s ISO 14001 Environmental Management System procedures.

1.6.7.7.10. Assigning Environmental Compliance Officers: The Contractor shall designate the appropriate number of personnel to perform Environmental Compliance Officer (ECO) functions in accordance with the requirements of Army Regulation 200-1 and JRTC and Fort Polk Regulation 200-1 for all contract work periods exceeding 180 consecutive days. Contractors will designate a primary and alternate ECO at least 14 days before start of contract performance for each shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. An ECO is an individual from the Contractor’s staff appointed to ensure that environmental requirements are met. Work areas will have at least one ECO on duty at all times. Within 14 days of start of contract performance, each designated ECO and alternate must successfully complete the 40-hour ECO course provided on post by DPW- ENRMD. In addition, each ECO must successfully complete an 8-hour annual refresher. Annual re-certification (e.g., refresher training) must be completed within each anniversary of the 40-hour ECO course. Failure to meet this requirement will necessitate re-taking the 40-hour course. The positions of ECO are not full time positions.

Individuals so designated may perform other duties provided they are available to perform ECO duties when required. Contractors using and/or storing very small quantities of hazardous materials may request a waiver of this requirement through the COR to DPW-ENRMD.

1.6.7.7.11. Competency Training for Contractor Personnel: The Contractor shall not allow personnel to perform any activities and/or tasks on Fort Polk without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

1.6.7.7.12. Use of Ozone Depleting Compounds: Submit in writing the quantity, type, and location of Ozone Depleting Compounds used on the installation quarterly and within 48 hours prior to the expiration of the contract to the DPW-ENRMD. The Contractor shall submit within 10 working days of completing any work on equipment containing more than 50 pounds of refrigerant charge: the building location, name, model, serial number, and capacity of the unit; the amount of refrigerant removed and replaced; description of work performed and results of the subsequent verification testing to the DPW-ENRMD and COR. The Contractor shall complete and submit an Emissions Inventory Questionnaire IAW JRTC and Fort Polk Regulation 200-1, Appendix G, to the DPW-ENRMD for actions that modify or add an air emission source on the installation prior to adding or altering any emission source.

1.6.7.7.13. Generation of Solid Waste: Remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility. Contractors shall make every effort to divert 50 percent of all construction and demolition debris waste and 40 percent of all other solid waste to comply with the Army Integrated Solid Waste Management Policy. Prior to removing any waste from Fort Polk for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program Manager and DPW-ENRMD to arrange for recyclable materials to be removed and diverted from the waste stream and provided to the installation to receive credit toward meeting diversion requirements. Submit in writing the quantities of waste removed and recycled to the DPW-ENRMD Solid Waste Manager on a monthly basis and at the expiration of the contract. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled, and the quantities of materials disposed/recycled by weight. The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials. The Contractor shall make maximum effort to reduce and prevent waste and comply with Executive Order 13423.

1.6.7.7.14. Generation of Hazardous Waste: Properly profile all waste generated as part of this contract to determine if any waste is hazardous waste as defined by 40 CFR. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a less-than-90-day site, in accordance with federal, state, Army, and installation regulations. The Contractor shall properly package the hazardous waste and complete the hazardous waste manifest, then take the manifest to DPW-ENRMD for approval and signature prior to removing any hazardous waste from the installation. Contractor shall contact DPW-ENRMD to obtain the installation’s hazardous waste EPA ID number for the hazardous waste manifest. The Contractor shall notify DPW-ENRMD 24 hours prior to removing any hazardous waste from the installation. The contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation, to an approved off-post permitted hazardous waste disposal facility. The DPW-ENRMD shall assist contractors with profiling their waste upon request. The final signed hazardous waste manifest must be returned to DPW-ENRMD, CMB within 30 days of hazardous waste removal from the installation. The final HW Manifest must contain the proper HW method disposal codes as specified in 40 CFR 262.41, 264.75 and 265.75.

1.6.7.7.15. Use of Hazardous Materials: Submit a hazardous material inventory list for all contract work periods exceeding 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials on hand utilizing Fort Polk Form 156 and submitted within 14+ days of work site establishment. The hazardous material will be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets (SDSs) for all hazardous materials used and stored on site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to Fort Polk that are listed on the EPA toxic chemical list (see JRTC and Fort Polk Regulation 200-1) without prior written approval from DPW-ENRMD.

1.6.7.7.16. Prevention of Storm Water Pollution: The Contractor shall prepare and implement a site-specific Storm Water Pollution Prevention Plan (SWPPP) in accordance with the Louisiana Pollution Discharge Elimination System (LPDES) general storm water permits for small (1-4.9 acres) and large (5 acres and larger) construction activities (totals are cumulative across all portions of the project). The Contractor shall prepare the SWPPP prior to any soil disturbance and make the SWPPP available upon request. The Contractor shall designate an individual to receive a 30 minute “Annual Strom Water Construction Training” class prior to any soil disturbance. DPW-ENRMD will provide the training at no cost to the Contractor at the construction site. The Contractor shall contact DPW- ENRMD to schedule the training. The Contractor shall have a trained individual on the work site at all times during activities at the construction site. The Contractor shall monitor activities to prevent pollution of surface and ground waters as identified in the site specific SWPPP. The Contractor shall maintain and make available upon request all SWPPP inspection records. For construction activities 5 acres and larger, Contractors shall prepare and submit a Notice of Intent (NOI) to Louisiana Department of Environmental Quality (LDEQ) and present the NOI and NOT to installation personnel upon request. The Contractor shall not apply any toxic or hazardous chemicals and pesticides to soil or vegetation without prior DPW-ENRMD approval. The Contractor shall comply with state and installation storm water requirements and protect all water bodies and/or tributaries potentially affected by Contractor activities.

For construction activities immediately adjacent to impaired surface water bodies, the Contractor shall quantify sediment or pollutant loading when requested by Federal, State, or installation personnel. The list of installation impaired surface waters bodies is available at the DPW-ENRMD.

1.6.7.7.17. Control of Erosion: Provide erosion and sediment control measures in accordance with federal, state, Army, and installation laws and regulations when required. The erosion and sediment controls selected and maintained by the Contractor shall ensure that water quality standards are not violated because of ongoing activities.

The Contractor shall construct or install temporary and permanent erosion and sediment control measures as required. The Contractor shall use Best Management Practices (BMPs) for storm water pollution prevention measures in accordance with the LPDES General Permit. No ground disturbance activities shall be initiated until all appropriate Best Management Practices are installed as required per manufacturer’s specifications. All permanent and temporary control measures will be removed after final stabilization and project acceptance by the COR.

1.6.7.7.18. Use of Pesticides: Submit the type and quantity of regulated pesticides, herbicides, or fungicides to be applied, the application purpose, and location to the DPW-ENRMD and COR for approval 10 working days prior to the initial application. The Contractor shall submit the actual quantities applied to the DPW-ENRMD and COR within 2 working days (48 hours) after each approved application. The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable federal, state, Army, and installation regulations, to include Fort Polk’s Pest Management Plan. Pesticide applicators shall be certified, licensed and maintained in accordance with the State of Louisiana and/or Department of Defense regulations. The Contractor shall provide evidence of personnel licenses and certification to the Contracting Officer and the DPW- ENRMD prior to the initial application of pesticides, herbicides, or fungicides. Only those pesticides registered with the USEPA and approved by the Command Consultant at the Army Environmental Command and the DPW- ENRMD shall be utilized and then only in strict accordance with product labeling. The installation reserves the right to prohibit and limit the amount and type of pesticides used.

1.6.7.7.19. Reserved

1.6.7.7.20. Reserved

1.6.7.7.21. Prevention of Spills: Develop, maintain, and post at the worksite a written site specific Spill Response Plan if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, Petroleum- Oils-Lubricants (POL), or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department) for assistance (911 or 531-2026). Contractors storing 1,320 gallons or more of any oil-based product in an above ground storage tank at a construction site shall develop a Spill Prevention Control Countermeasure (SPCC) Plan and present such plan to the DPW-ENRMD prior to placement. Immediately respond to actual emergencies and accidents, prevent or mitigate associated adverse environmental impacts, and contact the installation Fire and Emergencies Services at 911.

1.6.7.7.22. Demolition of Facilities with Asbestos and Lead Based Paint: Submit AAC-2 and Lead Paint Notification (LPN) environmental notification forms to the DPW-ENRMD for review prior to submission to the LDEQ when performing demolition and/or renovation activities, and/or abating asbestos or lead-based paint. The Contractor must allow enough time for a review by the DPW- ENRMD and notification to the LDEQ 10 working days prior to the project start date. The Contractor shall assume that materials on Fort Polk contain asbestos and/or Lead Based Paint (LBP) unless otherwise documented. The Contractor shall notify the State of Louisiana of asbestos and lead-based paint abatement. In the notification, the Contractor shall describe procedures to be used to prevent the release of asbestos and lead contaminants into the work area and the environment. Air monitoring is required for all abatement projects as specified in the Fort Polk Asbestos and Lead-Based Paint Management Plans. A DPW- ENRMD government representative must sign all waste manifests. The Contractor shall be responsible for ensuring his/her employees and Subcontractors are adequately trained and qualified for the classification of work they are performing (29 CFR 1926.62 and 1926.1101). The Contractor’s on-site manager shall be trained and qualified as a “Competent Person” (29 CFR 1926.1101) capable of identifying asbestos or lead-based paint hazards in workplaces, capable of selecting the appropriate control strategy, and having the authority to take prompt corrective measures.

1.6.7.7.22.1. Reserved

1.6.7.7.23. Reserved

1.6.7.7.24. Protection of Sensitive Areas: Comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are marked with orange carsonite signs with reflective stickers indicating what activities (e.g., driving, digging, foot traffic) are prohibited. These stakes are placed on the boundary of the sensitive area. The stakes will show one or a combination of symbols. The Contractor shall also adhere to the following installation sensitive areas requirements:

1.6.7.7.24.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.

1.6.7.7.24.2. Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a Red-Cockaded Woodpecker (RCW) or cavity tree. Individual RCW cavity trees are marked with two, 6-inch-wide white bands at 4 feet above ground level and a 200-foot buffer zone marked with yellow signs extends around each RCW cavity tree.

1.6.7.7.24.3. Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project-specific Corps of Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.

1.6.7.7.25. Corrective Action for Noncompliance: The Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

1.6.7.7.26. Environmental Contact Information: Contact the Fort Polk Directorate of Public Works, Environmental and Natural Resources Management Division (DPW-ENRMD) at 531- 6008/7008 or visit Building 2516 located at the intersection of Mississippi Avenue and 23rd Street for assistance. The environmental staff is available during non-duty hours and non- emergencies through the installation Field Officer of the Day (FOD) at 531-1726. For environmental emergencies, contact the installation Fire Department at 911.

Installation AT/FP

1.6.7.8. Pursuant to DoD Instruction Number 2000.16, "DoD Antiterrorism (AT) Standards," dated October 2, 2006, each Contractor employee, to include Subcontractor employees, requiring access to a Federally-Controlled Installation, facility and/or federally- controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at https://jkodirect.jten.mil. The contractor is responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer or the Contracting Officer's Representative (if appointed) within five (5) working days after contract award or prior to access to a federally-controlled installation or information system.

Installation OPSEC

1.6.7.9. In accordance with AR 530-1, Operations Security (OPSEC), dated 19 April 2007, and DoDM 5205.02-M, DoD Operations Security (OPSEC) Program Manual, dated 03 November 2008, Contractor personnel shall complete Level I OPSEC training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. OPSEC Awareness Training is available at the following website: https://securityawareness.usalearning/gov/opsec/index.htm.

1.6.7.10. The contractor shall ensure all applicable employees have completed OPSEC initial training and annual refresher training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer or the Contracting Officer's Representative (if appointed) within 30 days of arrival on post.

1.6.7.11. Operations Security (OPSEC) Awareness Training attendance and compliance may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

1.6.8

1.6.8.1. through 1.6.8.12. Reserved.

Installation Access

1.6.8.13. All unescorted visitors to Fort Polk must be vetted at the Visitors Center, located adjacent to the main gate on Louisiana Avenue (building 5903). Personnel requiring unescorted access will present a state issued Real ID Act compliant driver’s license (check status of your state at: https://www.dhs.gov/real-id-enforcement-brief ).

Visitors who do not have a Real ID act compliant driver’s license may use alternate forms of ID to proof their identity. Contact the Fort Polk Visitor’s Center at (337) 531-7907 to obtain a listing of authorized alternate forms of identity. Each visitor with acceptable screening results will be issued an access control credential for unescorted access to the installation. Personnel with unfavorable screening results may be denied unescorted access to Fort Polk. Law enforcement data obtained during the vetting process will not be released by personnel at the Visitors Center. A waiver process has been established for personnel who are denied unescorted access. Generally, waivers will be processed within five days of completion.

1.6.8.14. Escorted visitors who are accompanied by Department of Defense-affiliated personnel (active-duty Soldiers, civilian common access card holders, retiree ID card holders, DoD dependent ID card holders, and civilian contractor CAC holders) will not require vetting for access and will only need to produce a valid ID card; these visitors must be in the immediate vehicle of the escorting card holder. DoD affiliated personnel will be responsible for their escorted visitors on the installation. Personnel who are enrolled and vetted through the Rapid Gate program or possess an installation issued ID/Pass do not have escorting privileges.

1.6.8.15. The Fort Polk Visitors Center is open 24 hours a day, seven days per week. For additional information concerning access control please contact the Visitors Center at (337) 531-0380/4978/7186.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The post award conference will also be utilized to ensure contractor understands all HSPD-12 requirements. The KO, COR (and other government personal) will hold a quarterly progress meet with the Contractor to review the Contractor's performance. At these meetings the KO and COR will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract;

perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: The following personnel are considered key personnel by the Government: Contract Manager and Alternate Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be submitted to the contracting officer and COR prior to start date of Period of Performance. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 08:00 am and 5:00 pm, Monday thru Friday, except Federal holidays or when the Government facility is closed for administrative reasons.

1.6.12 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the COR prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

When prime contractor or subcontractor personnel send e-mail messages as a part of contract performance (or otherwise relating to contract matters), each sender shall include his/her name (both first and last names), E-mail address and the name of the individual's employer.

1.6.13 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees. It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents. Contractor personnel shall be neatly groomed and dressed in business casual attire to present a professional appearance at all times.

1.6.14 Contractor Licensing: The Contractor shall be licensed to comply with Louisiana RS 10-1664.

1.6.15 through 1.6.18 Reserved.

1.6.19 Safety. Prior to commencement of work, the contractor shall provide the COR and the Garrison Safety Office (GSO) a copy of their Site Specific Safety Plan that includes a completed Activity Hazard Analysis (AHA) of significant hazards and plan to control identified hazards. In this Safety Plan the contractor's Safety and Occupational Health Program shall be documented. The contractor shall report accidents and mishaps to the COR.

The GSO and other Safety Personnel on post reserve the right to perform visual inspections of the contractor's and subcontractor's job site. Any non-compliance or violations will be reported to the COR.

1.6.20 Emergency medical Treatment. Emergency medical treatment will be provided by the Bayne-Jones Army Community Hospital (BJACH) in order to prevent undue suffering or loss of life. Emergencies will be treated only during the period of emergency and appropriate action will be taken to discharge or transfer such patients as soon as the emergency period ends. Charges for medical care will be at the prevailing rate and at the Contractor's or Contractor employee’s expense.

1.6.21 Fire Prevention. The Contractor shall comply with fire prevention practices as set forth by the National Fire Protection Association in the National Fire Code and JRTC & FP REG 420-5 entitled “Fire Prevention and Protection Program”.

1.6.22 Removal of Contractor Personnel. The Government reserves the right to require removal of any Contractor personnel from the job site who endanger persons or property, or whose continued employment is inconsistent with the interest of military security. The Government also reserves the right to require the Contractor to remove from the job site, any employee found to be under the influence of alcohol, drugs or any other incapacitating agent or any employee involved in the theft of Government property. The removal from the job site of such personnel shall not relieve the Contractor of the requirement to provide personnel to perform services.

PART 2

DEFINITIONS & ACRONYMS

2.0. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACT ADMINISTRATOR. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.7. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY (GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.8. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.9. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.10. QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.11. QUALITY ASSURANCE SPECIALIST. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.12. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.13. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.14. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.15. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.16. WORK WEEK. Monday through Friday, except for Federal holidays unless specified otherwise.

2.2 ACRONYMS:

ACOR Alternate Contracting Officer’s Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DPW Directorate of Public Works FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer MICC Mission and Installation Contracting Command NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OSHA Occupation Safety & Health Administration PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program

PART 3

GOVERNMENT-FUNISHED PROPERTY, EQUIPMENT, ANDSERVICES

3.0. GOVERNMENT FURNISHED ITEMS ANDSERVICES:

3.1. Utilities. The Government will provide access to those utilities (water and electricity) at job sites for the contractor’s use in performance of tasks outlined in this PWS. The Contractor (to include subcontractors) shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment. If the contractor chooses to establish a job trailer at Service Command Loop, the contractor shall pay all utility costs as metered at the service pole location.

PART 4

CONTRACTOR-FURNISHED ITEMS AND SERVICES

4.0. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.

4.2. Repairs. The Contractor shall repair deficiencies of the Vent Hood Exhaust suppression system found during inspection IAW NFPA 96, to include: All actuation components, including agent storage cylinders, nozzles, releasing mechanisms, remote manual releases, automatic release mechanisms, detection sensors, fuel shut off valves and all the electronics and electrical components and all associated piping, remote manual pull stations, mechanical devices, detectors, actuators, and fire-actuated dampers. Any suppression system found to be non-compliant with NFPA Standard 96 shall be repaired to meet NFPA Standards.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .