PWS TE 4_ Site Conditions and Electrical Utility.pdf
PDF 2 MB Posted
- Attached to
- CDTF Modular Office Building
- Solicitation number
- W912LA24Q0008
About this file
This document is a Performance Work Statement (PWS) that provides details on the power connection installation and site conditions for a federal contract opportunity related to providing a modular office building for the California National Guard's Counterdrug Task Force (CDTF).
The PWS includes aerial and ground-level photographs showing the existing power source, transformer, disconnect, and proposed trailer location at Joint Forces Training Base Los Alamitos. The related federal contract opportunity, Solicitation Number W912LA24Q0008, is for the lease of a 48-foot x 60-foot modular office building and applicable maintenance services. The modular office must include three double-occupant offices, two single-occupant offices, two single-occupant restrooms, a private conference room, and a kitchenette area. The contractor must also provide 18 cubicle workstations, a 10-person conference room table, 28 office chairs, and weekly wastewater holding tank servicing. The NAICS code is 321991 (Buildings, mobile, commercial use, manufacturing) with a small business size standard of 1,250 employees. Interested businesses should submit a capabilities statement by 12:00 p.m. Pacific Standard Time on May 4, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS - CDTF Modular Building 20240424.pdf | ||
| PWS TE 3_Project Location v2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Connection Installation
Fig. 1 – Aerial view showing area of work.
NORTH
AREA OF WORK
roger.a.bond Text Box Existing Power Source roger.a.bond Text Box Existing Fence Line roger.a.bond Line roger.a.bond Line roger.a.bond Line roger.a.bond Line roger.a.bond Line roger.a.bond Line roger.a.bond Line
Fig. 2 – Aerial view location of transformer, disconnect, and proposed trailer location.
BAT
SIMULATOR
NORTH
LOCATION OF
WORK TRAILERS
EXISTING BAT TRANSFORMER
EXISTING TRANSFORMER
DISCONNECT
• Fig. 4 – Photo showing existing site conditions.
BAT
SIMULATOR
EXISTING BAT TRANSFORMER
EXISTING TRANSFORMER
DISCONNECT
Fig. 5 – Photo showing existing power connections.
File details come from the government source that posted it. Updated .