PWS_Solid_waste_removal_PUHO_NHP.docx

DOCX document 32 KB Posted

Attached to
PUHO SOLID WASTE REMOVAL
Solicitation number
140P8226Q0017
Issued by

About this file

This is a Performance Work Statement (PWS) for weekly solid waste removal services at Pu'uhonua o Honaunau National Historical Park (PUHO) in Honaunau, Hawaii, issued by the National Park Service, Pacific West Region. The contractor is required to supply, swap, and empty a 6-cubic yard dumpster once per week for 52 annual service cycles on a consistent, pre-scheduled basis occurring on the same day each week. Services must be performed during regular park business hours (Monday-Friday, 6:00 a.m. to 4:00 p.m. HST), excluding weekends and federal holidays. The contractor shall deliver the empty container to the park's maintenance/picnic area approximately 0.75 miles south of the entrance, ensure proper waste disposal at appropriate facilities in compliance with applicable regulations, and maintain all necessary permits, licenses, and insurance required for service performance. The dumpster will be located inside the park boundary behind two park gates, which the contractor must lock immediately after use to maintain park security.

The contractor must provide all equipment, vehicles, tools, and labor necessary for service performance and maintain backup capability to ensure continuity of service despite equipment failures. Performance thresholds include no more than three validated defects per year for container delivery and waste disposal, and no more than three validated defects per month for container collection, with surveillance conducted through 100% NPS inspection and vendor reporting. The contractor shall deliver containers free of excessive rust, holes, damage, mud, dirt, or organic material capable of transporting invasive flora or fauna. All contractor vehicles and equipment must be thoroughly pressure-washed and visibly free of dirt, mud, plant debris, and invasive pests prior to park entry, with re-inspection required after any departure from the park. Contractor personnel must present a neat appearance with easily recognizable company identification, maintain professional conduct with the public, and comply with OSHA safety requirements. The contractor must develop and maintain a Quality Control Plan and checklists addressing monitoring procedures, task validation, and inspection documentation, with progress meetings held periodically to discuss performance, deficiencies, and improvement opportunities.

View the file

Other files

File Type Posted
Sol_140P8226Q0017.pdf PDF
Appendix_B_Facility_Map.docx DOCX document
Wage_Determination.pdf PDF
Appendix_A_Compendium.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

SOLID WASTE REMOVAL SERVICES

Puʻuhonua o Hōnaunau National Historical Park (PUHO) Hōnaunau, Hawaiʻi Date: January 22, 2026

Prepared by: Ryan Swindler National Park Service (NPS), Pacific West Region (PWR)

1.0 DESCRIPTION OF SERVICES

This contract is for weekly trash removal services at Pu’uhonua o Honaunau NHP (PUHO). The Park is a popular tourist destination on the west side of Hawai’i Island in the village of Honaunau. There are two main day-use areas utilized by park visitors. Trash is collected from these areas every morning by park staff and transported to a contractor-owned 6- cubic yard dumpster. This contract provides services to supply and empty a 6 cubic yard dumpster on a weekly basis.

The Contractor shall accomplish the required services by furnishing, swapping and emptying the 6-cubic yard dumpster once per week for the duration of the contract. The Contractor shall provide all management, tools, equipment, and labor necessary to ensure the proper disposal of waste accumulated in the 6-cubic yard dumpster. Contractor-furnished containers shall be transported by the Contractor to PUHO via designated roads (map attached). The dumpster will be located inside the park boundary behind two park gates.

1.1 BACKGROUND

Annual park visitation exceeds 350,000 visitors. The park relies on solid waste removal services to keep the park clean and litter-free. The weekly 6- \cubic yard dumpster service has adequately met the needs of the park in the recent past, provided service is consistent with the weekly schedule.

1.2SCOPE
1.2.1CONTAINER DELIVERY

The Contractor shall deliver one (1) empty 6-cubic yard dumpster to PUHO. The container will be located in the maintenance/picnic area of the park approximately 0.75 miles south of the park’s entrance. The container shall be emptied once per week. The specific delivery location is provided on the attached map.

All containers supplied by the Contractor must be free of excessive rust, holes, or damage that compromise structural integrity, and free of mud, dirt, or any organic material capable of transporting invasive flora or fauna. NPS staff will inspect the container to ensure compliance with these requirements.

1.2.2 CONTAINER COLLECTION

The Contractor shall ensure that collected containers are safe for transport and that waste is secured to prevent blowing or spillage. The Contractor shall maintain park security by locking all gates traveled through immediately after use. Gates may be left unlocked only if park staff are on location or if the gate was already open upon arrival.

The annual workload shall be weekly emptying/swapping of a 6-cubic yard container 52 times per year. Container swap/empty will be pre-scheduled and will occur on the same day of each week. Vendor must notify NPS with schedule changes or delays

1.2.3 WASTE DISPOSAL

The Contractor shall dispose of all solid waste from collected containers at appropriate waste processing facilities in accordance with applicable regulations.

1.3 Permits, License & Insurance

The Contractor shall be responsible for obtaining and maintaining all necessary permits, licenses, and insurance required to perform these services, including final disposal.

1.4 CONTRACTOR PROVIDED EQUIPMENT AND SUPPLIES

The Contractor shall provide and maintain all equipment and vehicles necessary to perform the requirements of this contract. The Contractor shall not perform any cleaning, repair, or maintenance of equipment on site. Maintenance and repair of Contractor containers, vehicles, or privately owned vehicles shall not be conducted on site.

Contractor equipment and vehicles shall be maintained in a neat and professional condition and used solely for performance under this contract during normal hours of operation.

All equipment used in the performance of this contract shall be in good working condition. Equipment found to be unsafe or not functioning as designed shall not be used. The Contracting Officer (CO) or COR may inspect the Contractor’s equipment at any time while on Government property and may direct removal of unsafe or noncompliant equipment.

The Contractor shall provide sufficient equipment and vehicles to fulfill the requirements of this contract and shall maintain backup capability to ensure continuity of service. Equipment failure shall not relieve the Contractor of performance obligations.

2.0 CONTRACT PERFORMANCE

2.1 SERVICE SUMMARY (SS):

The contract service requirements are summarized in the performance objectives below. The performance threshold describes the minimally acceptable levels of service required. The SS provides information on contract requirements, expected performance levels, and Government surveillance methods.

Procedures set forth in FAR 52.212-4, Contract Terms and Conditions—Commercial Items (Inspection/Acceptance), will be used to address deficiencies.

Performance Objective
PWS Paragraph
Performance Threshold (Per Year)
Method of Surveillance

CONTAINER DELIVERY

1.2.1
3 validated defects per year.

100% Inspection NPS personnel

CONTAINER COLLECTION
1.2.2

No more than 3 validated defect per month.

100% Inspection NPS personnel

WASTE DISPOSAL
1.2.3
No more than 3 validated defect per year.
Vendor reporting
2.2CONTRACTOR WORK SCHEDULE
2.2.1Schedule Submission & Approval

Services shall be provided weekly at a regularly scheduled time. Weekly pickups shall occur on the same day each week. The Contractor shall notify NPS of any schedule changes or delays in advance whenever possible.

2.3 PROGRESS MEETINGS

The CO, COR, other government personnel, as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract, required contract modification(s), unsatisfactory inspections and trends related to each performance objective, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summary of unsatisfactory inspections and customer complaints and shall provide insight into any identified trends, root cause analysis, and performance improvement plan.

2.3.1 Progress Meeting Minutes

The CO will develop meeting minutes and distribute those minutes to the Government team and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.

2.4 CONTRACTOR’S QUALITY CONTROL

The Contractor shall develop and maintain a quality program to ensure the services described by this PWS are performed in accordance with commonly accepted commercial practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum the Contractor shall develop quality control procedures addressing the areas identified in paragraph 2.0, Service Summary.

2.4.1 Contractor’s Quality Control Plan (QCP)

The Contractor shall develop and maintain a Quality Control Plan that, at a minimum, communicates: (1) What will be monitored; (2) How monitoring will take place; (3) When monitoring will take place; (4) Who will conduct monitoring; and, (5) How monitoring efforts and results will be documented.

2.4.2 Contractor’s Quality Control Checklist(s)

The Contractor shall develop and maintain one or more Quality Control Checklists that align with the Contractor’s QCP and capture, at a minimum, the following: (1) Tasks; (2) Validation of acceptability of tasks; (3) Inspector name; (4) Inspection method; (5) Inspection date; and, (6) Inspection time.

2.5 QUALITY ASSURANCE

The Government will inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS. The CO will appoint a primary and alternate representative for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the Contractor after contact award. The COR may inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS.

2.6 GOVERNMENT REMEDIES

The Contracting Officer (CO) will follow FAR 52.212-4 Contract Terms and Conditions-Commercial Items, for the contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

3.0 CONTRACTOR PERSONNEL

3.1 CONTRACT MANAGER

The Contractor shall establish a contract manager or alternate(s) that can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to discuss contract related matters. The Contractor shall provide the CO the telephone number(s) where performance validation results and complaints can be reported. This information will be kept updated by the Contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.

3.2 CONTRACTOR PERSONNEL APPEARANCE

Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection. All Contractor personnel shall always be fully clothed while performing the services of this contract. "Fully Clothed" is deemed to mean that a shirt (or T-shirt), trousers, closed-toe shoes and personal protective equipment, if required, shall always be worn. Tact, diplomacy, and courtesy shall always be used during contact with the community.

3.3 EMPLOYEE RESTRICTIONS

The Government is authorized to restrict employment under the contract of any Contractor employee or prospective Contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

4.0 GENERAL INFORMATION

4.1 DAYS AND HOURS OF OPERATION:

The Contractor shall perform the required services during regular park business hours, Monday-Friday, from 6:00 a.m. to 4:00 p.m HST.

No work shall be performed on Saturdays or Sundays.

4.2 HOLIDAYS & CLOSURES

No work shall be performed on Holidays. Contractor shall make every effort to schedule work on days other than those noted below.

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
Washington’s BirthdayVeterans Day
Memorial DayThanksgiving Day
Juneteenth National Independence DayChristmas Day

Independence Day

5.0 INSTALLATION ACCESS

5.1 WORK RESTRICTIONS & RESOURCE PROTECTION

The NPS is the steward of unique resources found within the national parks. The NPS is committed to protecting natural, cultural, historical, archaeological, and other resources found within the parks and the adjacent lands.

All work shall be done on designated driveways and roads. Container Shall be picked up and retrieved from specific location designated by park staff. Containers shall not be dropped in any location other than designated location. All driving and maneuvering shall be done on designated roads and driveways. There are historically significant sites adjacent to roads and driveways, deviation from the designated driving surfaces will result in damage to valuable sites. Contractor will avoid backing or driving onto vegetation

5.1.1 Preservation of Natural Features

The Contractor shall comply with the following work restrictions:

1. Prevent damage to natural surroundings.

5.1.2 Invasive Species Prevention

a. General: The introduction of non-native species including invasive weeds and plants; invasive pests such coqui frogs and frog eggs, little fire ants (LFA), and insects including termites; other vertebrae species such as rats, mice, and reptiles; and diseases such as Rapid ‛Ōhi‛a Death (ROD) spread through contaminated soil can threaten the park’s rare and endangered plants and animals or can create new populations of non-native species not traditionally found in the park. Ensure all vehicles, equipment and machinery are clean and free of invasive weeds and plants, invasive pests, and ROD spread through soil.

b. Vehicles, Equipment, & Machinery: To prevent the spread of invasive species, the Contractor shall comply with the following:

1. Vehicles, waste containers, and machinery must be thoroughly pressure washed and visibly free of dirt, mud, plant debris, and invasive pests. Areas of particular concern include rollers on containers, inside and outside of the containers particularly the inside corners and areas that are in contact with the ground. On vehicles the bumpers, grills, hood compartments, under the battery, wheel wells, undercarriage, cabs and truck beds.

2. The interior and exterior of vehicles, equipment and machinery must be free of rubbish. The interiors of vehicles and the cabs of machinery must be vacuumed clean.

3. All vehicles, equipment, and machinery will be subject to inspection by NPS personnel.

4. All vehicles, equipment, and machinery that do not pass inspection will be turned away. The vehicle will not be allowed into the park for at least 48 hours.

5. All vehicles, equipment, and machinery leaving the park for any reason must be cleaned prior to re-entry into the park and will require re-inspection.

6. All vehicles, equipment, or machinery being stored at a private residence are to be kept in a pest free area, preferably in a garage, on pavement, and not under trees. Such vehicles, equipment, or machinery will be subject to additional inspection.

5.2 INSTALLATION SECURITY AND ACCESS REQUIREMENTS

Contact the CO/Park staff for guidance on installation security and access requirements.

5.3 SAFETY REQUIREMENTS AND REPORTS

The Contractor shall perform work in a safe manner as required by the Occupational Safety and Health Administration’s (OSHA) requirements. The Contractor shall immediately provide a verbal report to the CO and COR for each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact.

5.4 DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT OR VEGETATION

Damages to government buildings, equipment, or vegetation are addressed in FAR 52.237-2, Protection of Government Buildings, Equipment and Vegetation. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of these properties, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.

6.0 APPENDICES

The Government will make all the below listed documents, forms, references and report formats directly addressed within this Performance-Based Work Statement available. Supplements or amendments to the below listed materials from any organizational level may be issued during the life of the contract. When notified by the CO, the Contractor shall immediately implement those changes in publications, which result in a decrease, or no change in the contract price. Prior to implementing any such revision, supplement, or amendment that will result in an increase in contract price, the Contractor shall submit to the CO a price proposal and obtain prior approval. Price proposals shall be submitted within 15 calendar days from the date the Contractor receives notice of the revision, supplement, or amendment giving rise to the increase in cost of performance. Changes in the contract price due to supplements and amendments shall be considered under the FAR 52.212-4, Contract Terms and Conditions – Commercial Items clause. Failure of the Contractor to submit a price proposal within 15 calendar days from the date of receipt of any change, shall entitle the Government to performance in accordance with such change, at no increase in contract price.

APPENDIX A – PUHO Compendium APPENDIX B – Facility Map

File details come from the government source that posted it. Updated .