This is a Performance Work Statement (PWS) for Session Initiation Protocol (SIP) Conversion services at Marine Corps Air Station (MCAS) Cherry Point, North Carolina. The U.S. Marine Corps seeks a contractor to replace the current copper-based Primary Rate Interface (PRI) calling service with a modern fiber-optic SIP-based telecommunications solution. The contractor must deliver local, long-distance, and international calling services supporting 25,000 telephone numbers across three number blocks: the complete (252) 466-XXXX and (252) 720-XXXX ranges, plus (252) 464-5000 to (252) 464-9999. The solution must support a minimum of 368 concurrent calls with 99.99% uptime and integrate with legacy phone switching equipment in Building 4397 via 16 PRI connections. Key deliverables include a functional SIP trunk via fiber-optic connection, installed and configured Session Border Controllers (SBCs), 16 active PRI lines, and a detailed project implementation plan.

The contract is structured as a Firm-Fixed Price requirements contract with a twelve-month base year and four optional one-year renewal periods. The contractor shall restore services with a mean-time-to-restore (MTTR) of four hours or less from notification of outage. The Government will provide access to Building 4397 and space for equipment installation. Performance will be evaluated using a Quality Assurance Surveillance Plan (QASP) with metrics-driven standards, including 100% inspection and random sampling methods. The Contracting Officer will appoint a Contracting Officer's Representative (COR) to serve as Quality Assurance Evaluator and monitor contractor performance against Acceptable Quality Levels (AQLs). Non-compliance may result in increased surveillance, price reduction, or non-exercise of option years. Security protocols must be adhered to, with SBCs configured to ensure secure demarcation between public and private networks.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance of Work Statement (PWS)

Project: Session Initiation Protocol (SIP) Conversion for Marine Corps Air Station (MCAS), Cherry Point, North Carolina (NC)

1.0 Introduction/Background

This Performance of Work Statement (PWS) outlines the requirements for a new telecommunications service for the Telecommunications and Information Systems Directorate (TISD) at MCAS, Cherry Point. The current off-base calling service is provided via 10 copper-based Primary Rate Interface (PRI) connections. The objective is to replace this legacy system with a modern, fiber-optic based service utilizing Session Initiation Protocol (SIP) to improve reliability, capacity, and maintainability.

2.0 Scope of Work

The contractor shall provide a solution to deliver local, long-distance, and international calling services to MCAS Cherry Point. This includes providing all necessary personnel, equipment, materials, and supervision to transition from the existing PRI-based connections to a SIP-based service. The scope includes the provision of the SIP service, necessary network hardware to deliver SIP and interface with the existing on-base telecommunications infrastructure utilizing a Time Division Multiplexing (TDM) break in the form of 16 PRI connections.

3.0 Objectives

· Successfully replace the current off-base calling service vendor and infrastructure.

· Upgrade the service delivery from copper-based PRI to a fiber-optic connection.

· Implement a SIP-based solution capable of supporting 368 concurrent calls.

· Ensure seamless integration from the contractor provided equipment with the legacy phone switching equipment located in Building 4397 via 16 PRI connections.

· Provide reliable (99.99% uptime) calling services for all 25,000 telephone numbers managed by the MCAS Cherry Point Central Office.

4.0 Tasks and Requirements

The contractor shall perform the following tasks:

4.1 SIP Service Delivery: Provide a SIP-based telecommunications service delivered via a fiber-optic connection to Building 4397, MCAS Cherry Point, NC.

4.2 Network Hardware: Supply, install, and configure the necessary Session Border Controllers (SBCs) and other associated hardware to create a clear and secure separation between the provider's SIP network and the MCAS Cherry Point PRI based network.

4.3 Legacy System Integration: Convert the SIP signaling to 16 PRI lines within Building 4397 for direct connection to the Government's legacy phone switching equipment.

4.4 Call Capacity: The provided solution must support a minimum of 368 concurrent calls.

4.5 Numbering Plan Support: The service must support all local, long-distance, and international calling for the following 25,000 numbers owned by MCAS Cherry Point:

The entirety of the (252) 466-XXXX block.

The entirety of the (252) 720-XXXX block.

Numbers from (252) 464-5000 to (252) 464-9999.

5.0 Deliverables

The contractor shall provide the following:

Deliverable
Description
Functional SIP Service
A fully operational SIP trunk delivered via fiber-optic connection.
Session Border Controllers
Installed and configured SBCs.
PRI Conversion
16 active PRI lines connected and tested with the legacy phone switch.
Project Plan
A detailed plan outlining the implementation schedule, key milestones, and testing procedures.

6.0 Period of Performance

The period of performance will be a twelve-month base year of service with an option to renew the contract for up to four future years.

7.0 Place of Performance

The primary place of performance for installation and service delivery is Building 4397, MCAS Cherry Point, NC.

8.0 Government-Furnished Property/Information

The Government will provide access to Building 4397, space for contractor provided equipment and legacy phone switching equipment for the purposes of installation, integration, and testing.

9.0 Security Requirements

The contractor shall adhere to all security protocols of MCAS Cherry Point. The installed Session Border Controllers must be configured to ensure a secure demarcation point between the public and private networks, preventing unauthorized access and ensuring the integrity of government communications.

10.0 Acceptance Criteria

For the work to be accepted, the following criteria must be met:

· The fiber-optic connection and SIP service are stable and operational.

· The system can successfully handle a sustained load of 368 concurrent calls without degradation.

· The 16 PRI lines are correctly interfaced with the legacy phone switch, with successful test calls demonstrating functionality.

· All specified telephone number ranges are fully functional for inbound and outbound local, long-distance, and international calls.

· The Government's technical representative has reviewed and approved all installations and configurations.

11.0 Quality Control.

The contractor shall establish and maintain a complete quality control program for the performance requirements of this contract. The Contracting Officer’s Representative will evaluate the contractor’s performance based on the PWS.

12.0 Quality Assurance Surveillance Plan.

12.1 Purpose. This Quality Assurance Surveillance Plan (QASP) has been developed to provide the standard of surveillance for base telephone services for the TISD, Marine Corps Air Station, Cherry Point, N.C. The Contracting Officer (KO) will appoint an individual at the time of award as the COR. COR Contact information is also provided in the award. The COR will also serve as the Quality Assurance Evaluator (QAE) and will use this QASP to ensure the standards of the contract are being met. The COR/QAE will be referred to as the COR throughout this QASP.

12.2 Performance Standards. The QASP provides a systematic method to evaluate the service the Contractor is required to furnish. The COR will assess the Contractor’s performance to ensure the Contractor is performing up to the specified standards. The standards for this Performance Work Statement (PWS) are stated in the Level of Effort Requirements Summary (PRS) included in this QASP. The standards for this procurement are metric-driven.

12.3 Management and Oversight. The QASP is based on the premise that the Contractor, and not the Government, is responsible for the management and any Quality Control action required to meet the terms of the contract. The performance requirements recognize that the Contractor is not a perfect manager and that unforeseen requirements and uncontrollable problems do occur. Good management and use of an adequate Quality Control Plan will allow the Contractor to operate within specific performance requirements. QASPs are designed to be objective, fair, and consistent in evaluating Contractor performance against the provided standards.

12.4 Acceptable Quality Levels (AQLs). AQLs have been established in the PRS and provide performance standards that the Contractor will meet in performing the contract. In the event the Contractor does not meet the established AQLs, the KO has the right to exercise the negative incentives stated in this QASP.

12.5 Methods of Surveillance/Evaluation. The COR will evaluate the contractor’s performance using one or more of the following surveillance methods:

a. 100% Inspection: Inspection where specified characteristics of performance are examined and tested to determine conformance with defined requirements in the Performance Work Statement (PWS).

b. Random Inspection: Sampling method in which each unit of the population has an equal chance of being selected.

c. Customer Surveys and Feedback: A review method where customers and end users are surveyed to provide input on specific service levels.

12.6 Negative Incentives. If any of the performance requirements do not meet the AQL set in the PRS table, the COR shall document the discrepancy(s) and shall notify the Contractor promptly, and the KO, on a monthly basis, for appropriate action. When the performance is below the AQL standard, the Government may implement negative incentives that include: increased surveillance, reduction in contract price, and/or decision not to exercise next option.

12.7 Notification. The COR will notify the KO, in writing, of unacceptable quality levels. The COR will promptly provide written notification of discrepancies on a monthly basis, or immediately if the situation significantly affects the well-being of the project. The Contractor will be given the opportunity to respond, in writing, to each discrepancy.

12.8 Response. The Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within ten (10) working days after receipt of the KO’s notification. The Contractor should cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.

12.9 Ratings. The following criteria will be used for performance evaluations: Exceptional, Satisfactory, Marginal, or Unsatisfactory. Upward or downward arrows may be used to indicate an improving or worsening trend insufficient to change to the assessment status.

a. Exceptional. Indicates performance clearly exceeds contractual requirements. The area of evaluation may contain a few minor problems for which corrective action appears highly effective.

b. Satisfactory. Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.

c. Marginal. Indicates performance meets contractual requirements. The area of evaluation contains one or more serious problems for which corrective actions have not yet been identified, appear only marginally effective, or have not been fully implemented.

d. Unsatisfactory. Indicates the contractor is in danger of not being able to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains one or more serious problems for which the corrective actions appear ineffective.

12.10 Documentation. Documentation used and referenced to perform surveillance will consist of monthly reports, contractor plans and procedures, schedules, customer feedback and contract data requirements.

a. Recording Observations. The COR shall use Surveillance Logs to record information on scheduled observations and deficiencies noted. Each observation is recorded on the log. The documents then become a formal record for reference. The contractor is to be told each time that a deficiency is found during scheduled observations. The COR makes a notation on the Surveillance Log of the date and time the deficiency was discovered, then, the COR asks a contractor site manager to initial the notation, documenting notification of the deficiency only.

b. Potential Unacceptable Performance. The COR must identify the specific service that is unacceptable and the possible causes, and ask a number of questions which, if answered, will probably pinpoint the source of the problem.

c. Documenting Unacceptable Performance. The COR must attempt to resolve the problem with the contractor. The original log and the attempted solution (along with an evaluation of results) are forwarded to the Contracting Officer through the COR. Based on the severity of the discrepancy and the success of the solution, the COR will notify the KO. The contractor shall complete a response to the unacceptable evaluation if requested by the KO or by its own choice.

12.11 Taking Action.

a. The COR may evaluate the contractor’s performance and document any non-compliance, but only the KO may take action against the contractor for an unacceptable rating.

b. When the contractor’s performance is unacceptable and a formal action is indicated; the COR will determine what action is appropriate for the specific circumstances and make a recommendation to the KO.

12.12 Documentation. The COR retains a copy of all inspection schedules and surveillance activity logs during the course of the contract and forwards them for inclusion in the contract file at the end of the surveillance period.

However, when a specific service becomes unsatisfactory during a surveillance period, the inspection documentation supporting the contract discrepancy report is forwarded to the KO.

13.0 Performance Standards (Metrics).

The contractor shall provide operational SIP trunks with an uptime of 99.99% based yearly.

Upon notification by TISD personnel, the contractor shall restore services in a mean-time of 4 hours or less.

The contractor shall provide deliverables in accordance with schedule.

14.0 Performance Requirements Summary. The performance standards are stated in the summary below:

Required Service (PWS Reference)

Performance Measurement

Inspection Method Acceptable Quality Level (AQL)

Availability
(1) Uptime
Actual uptime
99.99% (Four nines) of uptime of SIP trunk(s).
Restoration after outage
(1) Mean Time To Restore services (MTTR)
Review of outage reports
4 Hours from notification of outage to restoration of service.