PWS - Repair and Calibrate EDS Detector.pdf

PDF 140 KB Posted

Attached to
Repair & Calibrate EDS Detector - Intent to Award Sole Source
Solicitation number
IASS-AFRL-RIZ-2026-0026
Issued by

About this file

This is a Performance Work Statement (PWS) for repair and calibration services of an EDS (Energy Dispersive Spectroscopy) detector located at Eglin Air Force Base, Florida, effective 16 June 2026.

The contractor shall provide all parts, tools, equipment, and labor necessary to remove, repair, and reinstall the EDS detector for the UltimMAX 100 system located in Building 1169 at Eglin AFB, FL. Following reinstallation, the contractor must calibrate the UltimMAX 100 and ensure it operates within performance specifications while maintaining integration with the Hitachi NX9000 SEM. All removal, reinstallation, and calibration work must be conducted at Eglin AFB by qualified personnel, although the actual repair of the EDS detector may be completed at the contractor's facility. The contractor is responsible for ensuring the repaired detector meets Original Equipment Manufacturer performance requirements and that resulting data is reliable and accurate.

The estimated workload consists of three tasks: EDS detector removal (8 hours), EDS reinstallation (6 hours), and UltimMAX 100 calibrations (2 hours), for a total of approximately 16 hours. No government-furnished property or services are identified. The performance objectives require the repaired EDS detector to operate within specifications and the calibrated UltimMAX 100 system to produce reliable and accurate data.

View the file

Other files

File Type Posted
SSJ (Redacted).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

REPAIR AND CALIBRATION FOR

EDS DETECTOR

EGLIN AFB

16 June 2026

PERFORMANCE WORK STATEMENT (PWS)

FOR

REPAIR AND CALIBRATE EDS DETECTOR

1. DESCRIPTION OF SERVICES. The contractor shall provide all parts, tools, equipment, and labor necessary to remove, repair, and reinstall the EDS detector for the UltimMax 100 located in Bldg.

1169 at Eglin AFB, FL. After the repaired EDS has been reinstalled, the contractor will calibrate the UltimMAX 100 and ensure it is operating within performance specifications.

a. The contract will ensure the repair EDS detector meets Original Equipment Manufacturer performance requirements.

b. The contractor will ensure the UltimMAX 100 operates within performance specifications and continues to integrate with the Hitachi NX9000 SEM after the reinstallation and calibrations.

c. The removal, repair, reinstallation, and calibration will be conducted by qualified personnel.

d. The removal, reinstallation, and calibrations will be conducted at Eglin AFB, FL. The repair of the EDS detector may have to be completed at the contractor’s facility.

2. SERVICE DELIVERY SUMMARY.

Performance Objective SOW Para Performance Threshold EDS Detector Repair The repaired EDS detector is and operates within performance specifications.

1.a, 1.b, 1.c, 1.d

The UltimMAX 100 operates within performance specifications.

UltimMAX 100 calibrations The Oxford EDS UltimMAX 100 system is calibrated

1.a, 1.b, 1.c, 1.d

The data produced by the UltimMAX 100 is reliable and accurate.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. N/A

4. APPENDICES.

A. Estimated Workload Data

ESTIMATED WORKLOAD DATA

ITEM

NAME

ESTIMATED

QUANTITY

1 EDS Detector removal 8 (est) hours

2 EDS reinstallation 6 (est) hours

3 UltimMAX 100 calibrations 2 (est.) hours