PWS - REMOVE Hush House AST.docx
DOCX document 24 KB Posted
- Attached to
- Aboveground Storage Tank Removal, Scott AFB
- Solicitation number
- W50S7S26Q0004
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for the removal of an aboveground storage tank (AST) at Scott Air Force Base, Illinois, with an effective date of January 14, 2026. The contractor is required to furnish all labor, materials, vehicles, equipment, tools, supervision, and administration necessary to design and execute the complete removal project. The primary scope includes removing and disposing of one 5,000-gallon AST, the associated concrete pad, and the fuel system connected to the tank. The contractor must cap off all connection points at pad level and coordinate disposal efforts with the 126th Air Refueling Wing and 375th Air Mobility Wing. All necessary federal, state, and local permits must be obtained by the contractor prior to work commencement.
The contractor should be aware that restrooms and power are not available in the immediate vicinity of the tank location, requiring advance planning for worker accommodation and equipment power needs. This removal project is being solicited under a Request for Information (RFI) pre-solicitation notice (Solicitation Number W50S7S26Q0004) issued by the Department of the Army National Guard for market research purposes, with responses directed to 126.arw.fal.msc.contracting@us.af.mil. The RFI is not a formal request for proposals, quotes, or bids, and no award will be made directly from responses submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Picture 2.jpg | JPG image | |
| Site Picture 1.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
REMOVE, Hush House AST
SCOTT AIR FORCE BASE, ILLINOIS
14 JANUARY 2026
1. PROJECT SCOPE SUMMARY: The Contractor shall furnish all labor, materials, vehicles, equipment, tools, supervision, and administration required to design and conduct the following work:
a. Remove and dispose of one 5,000 gallon AST
i. Contractor shall obtain all necessary federal, state and local permits required for this project.
ii. Contractor shall remove and dispose of tank.
iii. Contractor shall remove and dispose of the concrete pad.
iv. Contractor shall remove and dispose of the fuel system.
v. Contractor shall cap off all connection points at the pad level.
vi. Contractor shall coordinate disposal of the tank with the 126th Air Refueling Wing and 375th Air Mobility Wing.
vii. Restrooms and power aren’t available near the tank.