This is a Performance Work Statement (PWS) for a telecommunications infrastructure project at Joint Reserve Base New Orleans (JRB NOLA) involving the extension of Base Communication Office (BCO) services from Building 30 to Buildings 390 and 90. The contractor must provide complete planning, implementation, and testing of Local Exchange access and carrier commercial network services to support plain old telephone lines, adhering to International Telecommunications Union (ITU) and American National Standards Institute (ANSI) standards. The contractor shall designate one primary and one alternate point-of-contact for technical support and maintain qualified, certified telecommunications technicians throughout the contract period.
The inside plant requirements include purchasing and installing a 24-port switch compatible with the BCO switching system in Building 30, along with associated rack-mounted power distribution units, fiber patch panels, and copper patch panels in Buildings 390 and 90. The outside cable plant requirements mandate installation of one continuous 24-strand single mode fiber from Building 90 to 390 through an existing manhole system with no splice breaks, with 30-foot service loops in manholes and 15-foot service loops at building entries. All equipment must be commercially available off-the-shelf items, and the contractor must provide 100% fiber and copper testing with results due at project completion via redlines supplied to the BCO Manager. Security requirements mandate DBIDS enrollment, NACI-level background investigations for all personnel, physical security compliance per OPNAVINST 5530.14, and adherence to Homeland Security Presidential Directive 12. The contractor must furnish all personnel, vehicles, labor, tools, materials, test equipment, and specified equipment including Cisco switches, Tripp Lite UPS systems, fiber enclosures, and associated cabling. Evaluation factors emphasize compatible equipment, network switching experience, OSP fiber optical expertise, technician qualifications, ITU/ANSI compliance, and administrative support capabilities including diagnostics and redlines.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PERFORMANCE WORK STATEMENT
BUILDINGS 390 & 90 TECOMMUNUCATIONS PROJECT
JOINT RESERVE BASE NEW ORLEANS LOUISIANA
SCOPE
This Performance Work Statement (PWS) establishes the requirements for a telecommunications project for buildings 390 and 90 to extend the Base Communication Office (BCO) telecommunication services from building 30 of Naval Complex consisting of Joint Reserve Base New Orleans (JRB NOLA).
As used herein, the term Contractor is defined as the Prime Contractor and any resultant Subcontractor(s). The Prime Contractor shall ensure that any subcontractor(s) comply with the terms and conditions of this document.
There will be 1 day allotted at a future date and time in order for the proposed vendors to do a site walk out to gather requirements prior to submitting proposals. Site visitors must have base access granted prior to the date of the visit.
1. JRB NOLA Telephone Exchange Access Service Requirements
1.1. This PWS provides the requirements for Local Exchange access, carrier commercial network Service path/interface to the Public Switched Telephone Network (PSTN) to support plain old telephone lines.
Base Communications Office Gulf Port 400 Russell Ave Building 30 Joint Reserve Base New Orleans Belle Chase, La. 70037
1.2. The Contractor shall be able to provide complete, reliable and operational services which include plans, implementation, and testing.
1.3. Plans and Goals: The Contractor shall ensure the plans and goals maintain current services, ensure telecommunications facilities are in place, and are reliable and operational. The contractor shall adhere to telecommunication policies, procedures and regulations.
1.4. Implementation: The Contractor shall ensure the execution of telecommunication plans and services, methods, designs, systems and systems specifications, standards, policies and regulations are workable and accomplished and compatible with existing equipment.
1.5. Testing: The Contractor shall ensure proper testing of the network and combination of voice, video and data communications are operational and meet product specifications, network specifications, telecommunications.
1.6. Support Services
a. The contract shall identify at one primary and one alternate single point-of-contact (POC) for technical support.
b. The Contractor shall adhere to International Telecommunications Union (ITU) and American National Standards Institute (ANSI) standards for connectivity services.
2. Standards
2.1. The Contractor shall adhere to the following:
a. The Contractor shall conform to, and be compliant with, established ITU and ANSI standards.
b. When performing work for the Government, the Contractor employs only qualified Telecommunications Technicians with experience in the telecommunications field for the specified work.
c. The Contractor is responsible for maintaining personnel, who are fully qualified, certified, and competent, to perform the specified telecommunications services during the established contract period.
d. The Contractor shall keep areas in a clean, neat, and safe condition always.
e. Contractor equipment approved by the Government for connection to the Base Telecommunications network(s), including all wiring and connectors, shall be tested using approved telecommunications, ITU, and/or ANSI standards.
f. Materials provided under this contract, including additional features, optional equipment, and basic software, shall be commercially available as an off-the-shelf item requiring no further development and shall have been fully tested, approved, or demonstrated in the commercial or Government marketplace to meet the intended usage.
3. The Contractor shall staff, provide, and maintain, at its own expense, during the entire performance of the contract, the appropriate insurance coverage.
4. All personnel, vehicles, labor, tools, materials, supplies, test equipment, diagnostics, manuals, schematic drawings, facilities, and major/minor components required by the Base Communications Office (BCO) for telephone exchange access services and telecommunications support under the terms of this contract shall be furnished by the Contractor.
5. All Contractor personnel are required to conform to base regulations and concerns (i.e.).
· Designated routes
· Parking regulations
· Base vehicle speed limits
· Automotive liability insurance
· Excavation permits
· Cell phone usage while on base
· Base access requirements/regulations
5.1. The Contractor will correctly label all demarcation points/cables with a clearly defined and readable tag to include but not limited to circuit ID and number.
6. Special Access
6.1. Some work areas are controlled access areas that require an escort of all Contractor personnel. Access will be approved and controlled by Station Point of Contact (POC) and JRB NOLA Base Communications Officer. Prior contact will be required before access is granted to contractor personnel. A list of all contractor personnel needed for each job will be submitted to station POC prior to start of work in a controlled access area.
6.2. All contractor personnel will require a picture ID to gain access to the JRB NOLA. Contract personnel will be required to always have a company ID card with picture in plain view when onboard the JRB NOLA.
6.3. All Contractor-owned or private transportation vehicles go to and from the bases.
6.4. JRB NOLA may be subject to search each day to gain access to the JRB NOLA.
6.5. All Contractor personnel will be required to sign in and out of the logbook provided by the Government in the BCO in all switch area locations.
7. Setup and Configuration Requirements Summary The contractor is required to conduct a site survey/walk-out to determine exact material specifications and quantities. The contractor shall be solely responsible for providing all necessary materials to deliver a fully operational, turnkey installation. The Government will not be liable for quantity or measurement discrepancies discovered post-award.
7.1. Inside Plant Requirements
a. Purchase and install 24 Port switch compatible with BCO switching in building 30 switch room existing rack to extend phone services over fiber to building 90 and 390.
b. Purchase and install a rack mounted PDU and a 1U 24 Port LC with pigtails in building 30 switch room exiting rack. Fiber spicing, fiber and copper patch cords, and grounding to existing grounding bar may be required.
c. Purchase and install compatible fiber switch in building 390 existing wall mounted rack to receive the extended phone service via fiber.
d. Purchase and install rack mounted PDU, 12 port copper patch panel, copper and fiber jumpers and any addition equipment needed to complete the installation via existing fiber from building 30. Installation of 3 cat6 jumpers from existing 66 block to new copper patch panel may be needed. Additionally, fiber spicing, fiber and copper patch cords, and grounding to existing grounding bar may be required for building 390.
e. Purchase and install a wall mounted rack, rack mounted PDU, 12 port copper patch panel, copper and fiber jumpers and any addition equipment needed to complete the installation via new fiber from building 390. Installation of 5 cat6 jumpers from existing 66 block to new copper patch panel may be needed. Additionally, fiber spicing, fiber and copper patch cords, and grounding to existing grounding bars may be required for building 90.
f. Equipment, fiber jumper must be LC.
g. Fiber and Copper testing with testing results due at completions via redlines.
h. Redlines supplied to BCO Manger due at project completion.
i. All drawings, clear and usable conduits, equipment types, and measurements are for examples, or best known and should be verified by the contactor themselves for availability and compatibility to the exiting phone switch located in building 30.
7.2. Outside Cable Plant Requirements
a. Install One continuous 24 strand single mode fiber from building 90 to 390 through an existing manhole system with no splice breaks.
b. 30-foot services loops in manholes and 15 ft service loops in the entry of each building (see drawings for locations).
c. Manhole services loops will be neatly wrapped and hung in manholes and not laying of the floor. Entry service loops will be neatly attached to the wall of the building above the entry point.
d. Entry and exiting conduits in MH and HHs must be tagged and labeled with size, type of the cable and buildings to and from.
7.3. Overall Other Requirements
a. Redlines supplied to BCO Manger due at project completion.
b. 100% Fiber and Copper testing with testing results due at completions via redlines prior to final acceptance walkout perform by BCO
c. 10% of fiber will be tested by the contractor during the acceptance inspection with COR and BCO Manager.
7.4. Contractor Furnished equipment and material
24 Strand SM shielded cable
LC/LC SM fiber jumpers 2M
1/2 label tape
Mull tape
Tripp lite smart Rack Enclosure 6 unit rack
Tripp lite Smart UPS 120V
10 Ft power cord
CAT 6 Ethernet Cable Jumpers
AWG copper ground 25FT
Cisco 5x350X-48 Switch
Cisco C9200L-48P-4G layer 3 switch
Fiber enclosure rack mount 1U 24 Port LC with pigtails
Patch Panel 12 Port CAT6A
CAT 6 copper cable
Equipment must be equal to or greater and must be compatible with the BCO government switch.
7.5. See Annex C for pictures and drawings for reference.
8. Security Requirements
8.1. Physical Security
The Contractor shall comply with physical security standards for a Level One restricted area per OPNAVINST 5530.14 for the protection of the BCO and supporting structures and facilities.
The Contractor shall also comply with Homeland Security Presidential Directive 12 which states:
The implementation of Homeland Security Presidential Directive 12(HSPD-12) has extended the basic investigative requirement to un-cleared contractors. These people must, under HSPD-12, receive at least a NACI level investigation. Therefore, agency discretion regarding the investigation of this population has been greatly reduced.
8.2. Physical Access: The Contractor shall coordinate with the Contracting Officer’s Representative (COR) for access badges and lock and key control for assigned spaces. The NCTAMS LANT DET NOLA Security Officer maintains access and lock and key control for all BCO NOLA buildings.
8.3. The Contractor shall sign for assigned keys as appropriate, with coordination provided by the COR. All contractor personnel shall comply with BCO NOLA End Office Switch Standard Operating Procedure (SOP) OSCAR 14: ACCESS FOR BCO GULF PORT RESTRICTED AREA.
8.4. Identification and Vehicle Passes
The Contractor shall comply with the JRB NOLA and BCO NOLA/NCTAMS LANT / DoD regulations for obtaining personnel identification and vehicle passes. Certifications of need for access to the base and assigned buildings may be coordinated with the COR. The DBIDS program is the program for accessing government installations. The program will manage commercial vendors, contractors, sub-contractors, suppliers, and service providers (vendors/contractors) with access on base. The contractor is responsible for adhering to the DBIDS requirements.
8.5. Contractor Personnel and Security Requirements
The Contractor shall provide personnel who are qualified to perform the work described in this PWS. Contractor personnel shall be United States citizens, and shall be able to communicate effectively in English, both orally and in writing.
8.6. Physical Security
a. Some work areas are controlled access areas that require an escort of all Contractor personnel. Access will be approved and controlled by station Point of Contact (POC) and JRB NOLA Security Officer. Prior contact will be required before access will be granted to Contractor personnel. A list of all Contractor personnel needed for each job will be submitted to NCTAMS LANT BCO COR, for validation and submission to station POC for approval, prior to start of work in a controlled access area.
b. All Contractor personnel shall be required to always have a company ID card with picture in plain view when onboard the Government facility.
c. All Contractor personnel shall be required to conform to all base regulations, to include designated routes, parking regulations, base vehicle speed limits, automotive liability insurance, excavation permits, use of cellular, mobile, radio phones, photographing base facilities, infrastructure, restricted areas, and prohibited items.
d. All Contractor-owned or private transportation vehicles entering Government installations shall be subject to search at any time.
e. All Contractor personnel shall be required to sign in and out of the Visitor Logbook provided by the Government in the BCO and all switch area locations.
f. The Contractor shall comply with physical security standards for a Level One and Two restricted areas per OPNAVINST 5530.14 and NCTAMSLANTINST 5530.14 (series) for the protection of the BCO and supporting structures and facilities.
g. The Contractor shall coordinate with the COR for access badges for assigned spaces.
h. The Contractor shall comply with the host and NCTAMS LANT regulations for obtaining personnel identification and vehicle passes. Certifications of need for access to the base and assigned buildings will be coordinated with the NCTAMS LANT COR.
i. All Contractor employees shall be provided a security briefing covering site access control procedures, prohibited items in restricted/controlled spaces, and action to be taken in the event of emergency situations (fire, bomb threat, and active shooter) and antiterrorism.
j. During the on-going performance of the contract, if any Contractor personnel are identified by the COR as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population the Contractor shall take appropriate steps to remove and replace such personnel. The Contractor shall not be reimbursed for costs associated with such removal, including the costs for replacement of personnel.
k. The Contractor shall comply with physical security standards for a Level One restricted area per OPNAVINST 5530.14 and NCTAMSLANT Access Memo dated 7 December 2017 for the protection of the BCO and supporting structures and facilities. The Contractor shall also comply with Homeland Security Presidential Directive 12 which states:
The implementation of Homeland Security Presidential Directive 12 (HSPD-12) has extended the basic investigative requirement to un-cleared Contractors. These people must, under HSPD12, receive at least a National Agency Check with Inquiries (NACI) level investigation. Therefore, agency discretion regarding the investigation of this population has been greatly reduced.
8.7 Defense Biometric Identification System (DBIDS)
The Contractor shall be required to enroll in the Defense Biometric Identification System (DBIDS) for Base Access. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides continuous vetting anytime the DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
· Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center (VCC) representative.
· The VCC will retrieve your information on the computer, ensuring all information is current and correct.
· Once your information is validated, a temporary DBIDS credential is provided.
· Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 180 days).
· For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
· The representative will enter base access authorization and then you may proceed to work.
· If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
· Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
· Present valid identification, such as a passport or Real ID Act-compliant state driver’s license. • Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
· Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, fingerprints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential. • You may now proceed to work.
FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL BASE VISITOR CONTROL CENTER OR https://www.cnic.navy.mil/om/dbids.html.
8.8 Access to Federal Facilities
Homeland Security Presidential Directive (HSPD)-12; Policy for a Common Identification Standard for Federal Employees and Contractors, mandates Government-wide standard for secure and reliable forms of identification issued by the Federal Government to its employees and/or Contractors (including Contractor employees) for gaining physical access to Federally controlled facilities and logical access to Federally controlled information systems. HSPD-12 directs the Department of Commerce to develop a Federal Information Processing Standards (FIPS) publication to define such a common identity credential. Under this clause, and its implementing directives, Contractor and Contractor employees working at a federally controlled base, facility, or activity performing under this contract shall meet HSPD-12 and FIPS credentialing standards for issuance of the Defense Biometric Identification System (DBIDS) Personal Identity Verification (PIV) card. When access to a base, facility, or activity is required, Contractor employees shall in-process with the Navy Command Security Manager prior to start of contract and shall out-process prior to their departure at the completion of the individual’s performance under the contract. In-processing/Out-processing will be coordinated through the COR/ACOR. To obtain a DBIDS credential and obtain base access; Contractor shall acquire DoD sponsorship via the COR/ACOR, have a thorough identity check, be properly vetted, and have a legitimate reason for base access. Identity checks require a passport or a Real ID Act compliant state driver's license. Vetting occurs when the individual's background check/investigation and identification are compared against authoritative criminal justice data bases and favorably adjudicated, and the individual has a letter or official document (Sponsorship Letter or SECNAV Form 5512-1) from the sponsoring organization (NCTAMS LANT) which articulates the reason for access. When the above criteria are satisfactorily met, DBIDs credentials are issued.
8.9 Contractor Suitability Background Investigation Requirements
DoD security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Government sponsor recognizes Contractor position sensitivity as Non-Sensitive/Moderate Risk requiring a Suitability Tier 2/Tier 2S background investigation. Duties involve Key Resources, publicly or privately controlled, essential to the minimal operations of the Government; Government service delivery, including customer service; requiring integrity or efficiency of the service; and activities demanding a significant degree of public trust (Government programs or operations).
At a minimum, each Contractor employee shall be a US citizen and have a favorably completed Tier 2/2S to obtain a favorable suitability determination to work on contract. Each Contractor employee assigned to work on this contract shall be required to provide and/or complete: • Employee Profile Sheet for eQuip processing (Full Name, SSN, DOB, and POB, Contact Information (work number and email address)
· CVF Form - Citizenship Verification Form (signed/dated by the Company Facility Security Officer/Representative)
· Two identity source documents, at least one which is a valid Federal or State Government issued picture identification,
· SF-85P Questionnaire for Public Trust Positions (or equivalent OPM investigative product)
· FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
· Originally Signed Release Statements
The Contractor shall be responsible for completing and adhering to the Navy Command Security Contractor Security Vetting Process to ensure the correct security vetting happens prior to Contractors reporting to work and providing required "access" in performance of contract duties. Failure to provide the required documentation for at least 30 days after the start of the contract may result in delaying the individual’s start date.
Regardless of their duties, all Contractor employees shall in-process with the Navy Command's Security Manager prior to start of contract and shall out-process prior to their departure at the completion of the individual's performance under the contract. In-processing/Out-processing will be coordinated through the COR/ACOR. The Contractor shall ensure an active continuous evaluation program for the continuous evaluation of personnel suitability eligibility or assignment to contract duties. Contractor shall inform the COR/ACOR via email within 24hours and submit a written electronic report within five (5) business days of incidents of misconduct by its employees that violate the laws of the United States.
8.10 Interim Access
The Navy Command's Security Manager may authorize issuance of interim suitability determination upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received, and a favorable determination is not made, the Contractor employee working on the contract under interim access will be denied approval to continue to work on contract.
8.11 Denial or Termination of Access
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the Contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan in processing their employees and Sub-Contractor employees. The Contractor shall insert this clause in all subcontracts when the Sub-Contractor is permitted to have unclassified access to a federally controlled facility, federally controlled information system/network and/or Government information, meaning information not authorized for public release.
8.12 Access to DoD/DoN IT Systems
Access to DoD/DoN IT Systems is not required under the contract.
8.13 Contractor’s Security Representative
The Contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three (3) workdays after contract award, the Contractor shall provide to the requiring Navy Command Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter.
8.14 Identification, Security Requirements and Vehicle Passes
Daily Base Access: The Contractor shall comply with the JRB NOLA and NCTAMSLANT regulations for obtaining personnel identification and vehicle passes. Certifications of need for access to the base and assigned buildings may be coordinated with the COR.
9 Safety and Environmental Plan
The Contractor shall comply with Federal, State, local and base regulations pertaining to the environment, including but not limited to, water, air, solid waste, and noise pollution.
10 OSHA
Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the Contractor. Further, the Government will assume no liability or responsibility for the Contractor’s compliance or noncompliance with such requirements, except for the responsibility to make corrections according to approved plans of abatement subject to base-wide priorities.
11 Evaluation Factors
(a) Compatible equipment to BCO switch per location.
(b) Network and switching experience presented.
(c) OSP Fiber Optical expertise
(d) Identify level of qualifications for technicians designated for support of services required.
(e) Confirm adherence to International Telecommunications Union (ITU) and American National Standards Institute (ANSI) for applicable services to be provided.
(f) Acknowledgement of required administrative support as identified in the Performance Work Statement applicable to but not limited to Diagnosis Reports, Fiber and Copper testing, and Redlines
12 Points of Contact
| Contracting Officer Representative |
| TBD |
BCO Southeast Region Division Head
TBD
File details come from the government source that posted it. Updated .