This Performance Work Statement (PWS) details a contract for Structural Collapse Venue Site (SCVS) Clean Up Services for the Massachusetts Army National Guard's Region 1 Homeland Response Force (HRF) Collective Training Event in TY2025. The contract requires a contractor to provide personnel, equipment, and materials to clean up a simulated structural collapse site at Camp Edwards, Joint Base Cape Cod, from September 2-5, 2025.
Key requirements include breaking down concrete and rebar reinforced concrete within a 50ft x 25ft x 12ft designated area, removing all debris using contractor-provided dumpsters, and ensuring complete site cleanup following safety and environmental standards. The contractor must provide heavy equipment, labor, and construction materials, comply with base access and security protocols, and submit a close-out report within 7 days of performance completion. The work will support National Guard Bureau training exercises for CBRNE Enhanced Response Force Package (CERFP) and Homeland Response Force (HRF) capabilities, specifically focusing on search and extraction operations in simulated disaster scenarios.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTION AND ANSWER.docx | DOCX document | |
| W912SV25QA017_Provisions and Clauses.docx | DOCX document | |
| Wage and Determinations 2015-4045 rev32.pdf | ||
| Combined Synopsis Solicitation_SCVS Clean Up_W912SV25QA017.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Region 1 Homeland Response Force (HRF) – Collective Training Event TY2025 – Structural Collapse Venue Site (SCVS) Clean Up Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform SCVS Clean Up Services, as defined in this PWS.
1.1.1 Objectives: The contractor shall provide SCVS Clean Up for Search and Extraction Operations for the event. Personnel assigned to this task shall possess the skills, qualifications, and equipment necessary to perform assigned tasks associated with this order.
This PWS additionally establishes performance requirements for contractor tasks necessary to reset SCVS. These SCVS were built to be realistic, challenging, and maintainable, and to provide skill lanes required to conduct NG CRE training as identified in the Training and Evaluation Outlines/CATS. The training venues provide strategic and tactical challenges of such complexity that repetitiveness does not breed familiarity with the training prop and training lanes. The SCVS is of sufficient size and complexity to keep the Search and Extraction (S&E) teams training in realistic conditions and environments, so individuals gain valuable experience and expertise working on a simulated "real world" structural collapse.
1.2 Background: In conjunction with the National Guard Bureau (NGB), the entity is tasked to develop and support regional training and exercise activities aimed at enhancing domestic contingency readiness. The entity ensures these functions are integrated and complementary where appropriate. To provide conditions wherein the participants are challenged with probable real-world situations, NGB uses Structural Collapse Simulators (SCS) to simulate the collapsed state of buildings due to a natural disaster or a domestic terrorism event. The use of these simulator venues supports regional training and exercises to enhancing domestic contingency preparedness exercises and evaluations of CBRNE Enhanced Response Force Package (CERFP), Homeland Response Force (HRF) and other CBRNE response capabilities. A SCVS is a location where one or more SCS are used to simulate the collapsed state of buildings.
1.3 Period of Performance (PoP): The Period of Performance shall be Tuesday 02SEP25 until completion, work must be completed no later than Friday 05SEP25.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1630 on Tuesday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Structural Collapse Venue Site at Camp Edwards at Joint Base Cape Cod located at Joint Base Cape Cod, Connery Ave. Buzzards Bay, MA 02542. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: Telework is not authorized as the performance required, as laid out in this PWS, cannot be met if telework is authorized. Performance requirements call for the clean up of the desired location.
The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:
1.4.3.1 New Year’s Day: January 1st
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Independence Day: July 4th
1.4.3.6 Labor Day
1.4.3.7 Columbus Day
1.4.3.8 Veteran’s Day: November 11th
1.4.3.9 Thanksgiving Day
1.4.3.10 Christmas Day: December 25th
1.4.3 Quality Control (QC): Non Applicable
1.4.4 Quality Assurance (QA): Non Applicable
1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Failure to comply with these requirements may result in withholding of final payment.
1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).
1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website: https://jko.jten.mil/courses/atl1/launch.html.
1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 15 calendar days after completion of training.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
1.4.6.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
1.4.6.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.
1.4.6.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.
1.4.6.2 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating heavy equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will appraise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.10.2 Government Facility Access. Contractor will be provided a matrix to be prefilled with all employees requiring access on base and sent to the COR. If the event roster form is not filled out and submitted before the performance period, the contractor will be screened at the gate, with their ID and registration as required documentation. A REAL ID or approved federal ID alternative is required for base access. The initial day pass (even when pre-cleared) and any day-of clearance must occur Mon-Fri 0600-1500 (recommend no later than 1400 arrival) at the pass shack at the Bourne Gate on Connery Ave– no other gate is authorized until a pass is in hand.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel Non Applicable
1.4.13 Data Rights Non Applicable
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Phase In / Phase Out Periods Non Applicable
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 CERFP: The CERFP teams and Weapons of Mass Destruction (WMD)-CSTs provide a phased capability; WMD-CSTs detect and identify CBRNE agents/substances, assess the effects and advise the local authorities on managing the effects of the attack. The WMD- CSTs also assist with requests for other forces. The CERFP teams locate and extract victims from a contaminated environment, perform mass patient/casualty decontamination, and provide treatment as necessary to stabilize patients for evacuation. The teams are specially trained to respond to a weapons-of-mass-destruction incident. The WMD-CSTs are dedicated units of National Guard personnel on active duty, whereas the CERFPs are comprised of existing National Guard units in traditional reserve status. They can be mobilized in state active duty, Title 32, or Title 10 status. Each CERFP can be ready to deploy to an incident site within six hours of notification of a CBRNE or WMD incident.
2.1.2 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.3 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.4 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.5 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.6 Homeland Response Force (HRF): Composed of approximately 560 personnel, encapsulates lifesaving capabilities including Search and Extraction, Decontamination, Emergency Medical, Security, and Command and Control (C2). Each HRF will be staffed with Army National Guard Soldiers and Airmen. HRFs provide a scalable capability to bridge a gap between initial National Guard (NG) response and Title 10 capabilities.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Rubble Pile: Informal term for Structural Collapse Venue Site.
2.1.12 Structural Collaspe. A structure, tunnel or collapsed building, used to simulate a normal structure in a collapsed state either due to a natural disaster or a domestic terrorism event.
2.1.14 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
| AR | Army Regulation |
| AT/OPSEC | Antiterrorism/Operational Security |
| BI | Background Investigation |
| CERFP | CBRNE Enhanced Response Force Packages |
| CBRN | Chemical Biological Radiological Nuclear |
| CM | Contract Manager |
| COR | Contracting Officer Representative |
| CST | Civil Support Team |
| DA | Department of the Army |
| DD254 | Department of Defense Contract Security Classification Specification |
| DFARS | Defense Federal Acquisition Regulation Supplement |
| DoD | Department of Defense |
| DHS | Department of Homeland Security |
| FAR | Federal Acquisition Regulation |
| FEMA | Federal Emergency Management Agency |
| FPCON | Force Protection Condition |
| GFP/M/E/S | Government Furnished Property/Material/Equipment/Services |
| HQDA | Headquarters, Department of the Army |
| HSPD | Homeland Security Presidential Directive |
| KO | Contracting Officer |
| NGB | National Guard Bureau |
| NLT | Not Later Than |
| OCI | Organizational Conflict of Interest |
| PII | Personally Identifiable Information |
| PIPO | Phase In/Phase Out |
| POC | Point of Contact |
| PRS | Performance Requirements Summary |
| PWS | Performance Work Statement |
| QA | Quality Assurance |
| QASP | Quality Assurance Surveillance Plan |
| QC | Quality Control |
| QCP | Quality Control Program |
| SCR | Service Contract Reporting |
| SME | Subject Matter Experts |
| S&R | Search & Rescue |
| SSN | Social Security Number |
| TE | Technical Exhibit |
| USD(I) | Under Secretary of Defense for Intelligence |
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.
3.2 Materials: Non Applicable
3.3 Equipment: Non Applicable
3.4 Services: Non Applicable
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): The contractor shall furnish everything required to perform these services.
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: Non Applicable
4.3 Contractor Security Clearance: Non Applicable
5.0 Requirements: The contractor shall:
5.1 Materials: The Contractor shall provide all materials to support SCVS clean up. Locate, acquire, and transport all construction and building materials to the site. The contractor shall remove all materials provided and cleaned up during performance period.
5.1.1 Equipment: Contractor shall provide all equipment required to complete rubble pile clean up. The contractor shall remove all equipment required and used to complete performance requirements.
5.1.2 Safety Considerations: The Contractor is responsible for the safety of their contract employees which should include but not limited to adequate hydration, nutrition, sunscreen, tents and porta johns for use during the period of performance.
5.1.2.1 Performance shall meet industry, state, and local safety standards.
5.1.2.2 Comply with all environmental determinations. Address and resolve all environmental considerations and issues. Adhere to OSHA safety regulations.
5.1.2.3 Provide mandatory safety equipment (hard hats, eyeglasses, etc.) for all workers entering the collapse structure (rubble pile) location.
5.2.1 SCVS:
5.2.1.1 The contractor will ensure the SCVS is cleaned up prior to the start of the exercise. This may require the contractor to perform a site visit to identify and plan for the necessary materials required for a complete SCVS clean up. The contractor shall provide heavy equipment, labor and construction material required to clean up the SCVS.
5.3 Service Contract Reporting:
5.3.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau via a secure data collection site.
5.3.2 The contractor shall completely fill in all required data fields using the following web address: https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.
The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1-September 30).
The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
| Date of Publication |
| Mandatory or Advisory |
| Website |
Federal Acquisition Regulation
| Mandatory |
| https://www.acquisition.gov/?q=browsefar |
Defense Federal Acquisition Regulation Supplement
| Mandatory |
| http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars |
Joint Travel Regulation (JTR)
| Mandatory |
| https://www.defensetravel.dod.mil/site/travelreg.cfm |
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 01/23/2014 (Change 1: 07/28/2020)
| Advisory |
| http://www.esd.whs.mil/Directives/issuances/dodm |
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9)
| August 2013 |
| Mandatory |
| http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf |
| DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP) |
| 04/03/2017 |
| Advisory |
| https://www.esd.whs.mil/Directives/issuances/dodm/ |
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC) 09/09/14 (Change 1: 05/04/2018)
| Advisory |
| https://www.esd.whs.mil/Directives/issuances/dodi/ |
Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors
| 08/27/2004 |
| Mandatory |
| https://www.dhs.gov/homeland-security-presidential-directive-12 |
DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 01/29/2019
| Advisory |
| https://www.esd.whs.mil/Directives/issuances/dodi/ |
DoD 5400.11-R Department of Defense Privacy Program
| 05/14/2007 |
| Advisory |
| https://www.esd.whs.mil/Directives/issuances/dodm/ |
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020
| Advisory |
| https://www.esd.whs.mil/Directives/issuances/dodd/ |
DoD 8570.01-M Information Assurance Workforce Improvement Program
| 12/19/2005 (Change 4: 11/10/2015) |
| Advisory |
| https://www.esd.whs.mil/Directives/issuances/dodm/ |
DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM) 02/28/2006 (Change 2: 05/18/2016)
| Mandatory |
| https://www.esd.whs.mil/Directives/issuances/dodm/ |
Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
| 03/07/2014 |
| Mandatory |
| https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx |
AR 25-2
Information Assurance 04/04/2019
| Advisory |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
AR 530-1
Operations Security
| 09/26/2014 |
| Mandatory |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
AR 525-13
Antiterrorism
| 12/09/2019 |
| Mandatory |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
AR 381-12
Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b)
| 06/01/2016 |
| Mandatory |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
| Form |
| Date |
| Website |
DD 1172-2
Application for Identification Card/DEERS Enrollment
| Mar 2017 |
| http://www.dtic.mil/whs/directives/forms/index.htm |
I-9 Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security Agreement Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving Report
| Aug 2000 |
| https://www.esd.whs.mil/Directives/forms/dd0001_0499/ |
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
Task 1: Provide SCVS Reset Support: The Contract Manager will ensure the SCVS is cleaned up prior to the end of the performance period. This may require the contractor to perform a site visit to identify and plan for the necessary materials required for a complete SCVS clean up.
The contractor shall provide heavy equipment, labor and construction material required to clean up the SCVS.
· Provide one-site manager
· Attend planning meetings as required
· Comply with safety and environmental standards.
| Material, Operators, and Equipment required are brought into performance site, debris loaded and all materials, personnel, and equipment removed from premises |
| 100% |
inspection
| Task 1.1: Contractor shall breakdown concrete and rebar reinforced concrete, as need, in the annotated space, see Technical Exhibit 3. |
| · Prepare debris material for contractor removal |
· Comply with safety and environmental standards
| Debris within annotated space is prepared for removal |
| 100% |
inspection
| Task 1.2: Contractor shall clean up and remove all debris in the annotated space into contractor provided dumpsters. |
| · Prepare debris material for contractor removal |
· Comply with safety and environmental standards
| Debris within annotated space is placed into dumpsters or other means of removal. No debris is left in annotated space |
| 100% |
inspection
| Task 1.3: Contractor shall remove all equipment and materials that were contractor provided. |
| · Remove all material, equipment, and resources from government facility location |
· Comply with safety and environmental standards
100% compliance 100% inspection
Task 2: Close-out report and AAR comments:
The Contractor shall submit Close-Out Report at the end of the period of performance.
- NLT 7 days after Period of Performance
- PDF, electronically
- One (1) copy
- Submitted to POC 100% compliance 100% inspection
TECHNICAL EXHIBIT 2
Deliverables Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
| Contractor Entry Access List |
| 7 days prior to access to Army installation |
| One (1) copy |
| Entry Access List Template, |
Electronically
POC
| 1.4.5.3 AT Level 1 Awareness Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.4 iWATCH Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.11 OPSEC
Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.12 OPSEC Level II Certification for OPSEC Coordinator |
| Provide NLT 15 days after employees completed certification |
| 1 |
| Electronic Submission |
| COR |
| 1.4.10 Identification Media |
| Return within 14 days of employee’s departure from contract performance. |
| Original(s) |
| Hard Copy |
| KO |
TECHNICAL EXHIBIT 3
Image, Description and Dimensions of SCVS Clean Up Location
Performance requirements listed in this PWS are limited to the material within the red marked section of this image. Equipment required for performance may be located outside of this designated space. The designated space indicates only the material that the contractor shall remove.
Material pile that the contractor shall clean up is predominantly comprised of loose concrete, rebar, and concrete reinforced with rebar.
Dimensions of material pile that the contractor shall clean up is as follows: 50ft (L)x 25ft (W) x 12ft (H).
Ver. January 2021 image1.png
File details come from the government source that posted it. Updated .