PWS_Quarterly Gate Maint v3_Redacted.pdf
PDF 909 KB Posted
- Attached to
- Vehicle Gate Maintenance
- Solicitation number
- PANMCC-26-P-0000-048259
About this file
This is a Performance Work Statement (PWS) for Quarterly Gate Maintenance services at Joint Base Lewis McChord, Washington. The contract covers maintenance and emergency repair of five vehicle traffic control gates used by 1st Special Forces Group (Airborne) to ensure 24/7 operational security. The contract period spans a 12-month base year (August 1, 2026 – July 31, 2027) plus four one-year option periods through July 31, 2031.
The contractor must perform two primary services under separate Contract Line Item Numbers (CLINs): CLIN0001 requires systematic quarterly preventative maintenance on all mechanical, electrical, and safety components in accordance with original equipment manufacturer (OEM) specifications and Underwriters Laboratories (UL) 325 safety standards, with no more than four inspections per 12-month period. CLIN0002 requires unscheduled repair services within 72 hours of notification for malfunctions, physical damage, or system failures compromising physical security. The contractor must submit a Quarterly Maintenance Checklist within five business days of each inspection and a formal Repair Report within three business days of completing emergency repairs. Unscheduled repairs under $2,500 are paid via Government Purchase Card; repairs exceeding $2,500 are invoiced through Wide Area Workflow with Defense Finance Accounting System (DFAS) payment. The contractor must maintain an Electronics Technician Maintenance (ETM) Level II for routine quarterly maintenance and Level III for emergency callouts, provide all tools, equipment, and materials, and establish a Quality Control Plan within 30 days of contract award for government approval. Key personnel must complete required training including Anti-Terrorism Level I, Operations Security (OPSEC) Level I, and iWATCH training within 30 days of employment. All contractor employees require background checks and installation access passes subject to Installation Access Control System (IACS) compliance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUG 22
PERFORMANCE WORK STATEMENT (PWS)
Quarterly Gate Maintenance
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide Quarterly Gate Maintenance.
1.2 Background: has five (5) vehicle gates that require quarterly maintenance to ensure 24/7 operation of the gates. To ensure the gates remain operational and functioning between maintenance intervals repair within 72 hours of notification of non-operational status is required. See Attachment 3 for gate locations.
1.3 Scope: The Contractor shall provide non-personal service(s). The scope encompasses a cyclic quarterly maintenance schedule designed to identify, mitigate, and repair wear-and-tear before catastrophic failure occurs. The Contractor shall execute these services in strict accordance with original equipment manufacturer (OEM) specifications, Underwriters Laboratories (UL) 325 safety standards, and applicable Department of Defense (DoD) physical security regulations on the vehicle gates.
1.4 Period fo Performance: Contract will encompass a base plus four (4) option years.
Base Year: 1 Aug 26 thru 31 July 27
OY1: 1 Aug 27 thru 31 July 28 OY2: 1 Aug 28 thru 31 July 29 OY3: 1 Aug 29 thru 31 July 30 OY4: 1 Aug 30 thru 31 July 31
1.5 Objectives:
The primary objective of this contract is to ensure the continuous, safe, and reliable operation of the installation's physical security barriers. See Part 5 Specific Tasks for CLIN structure, and tasks required.
1.6 General Information:
1.6.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within (30) days after date of contract award (15-20 days).
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within (5) days. If the Government has provided comments, the Contractor shall then have (10) to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than (I0) prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items
(Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided
Equipment / Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.6.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within 30 days upon completion of each option period or Task Order.
1.6.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within one (1) hour of identifying those issues. Verbal reports shall be followed up by written reports within three (3) business days, detailing the time of notification, time of arrival, root cause of failure, parts replaced, and total labor hours expended.
1.6.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.6.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)
deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.6.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.6.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.6.4.1 Government Facility Office Hours: The Government facility office hours are between the hours of 7:30 AM – 4:30 PM Monday through Friday, except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.6.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of are between the hours of 7:30 AM – 4:30 PM Monday through Friday. The Government facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings
1.6.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0700-1800, the days of Monday through Saturday. The facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings.
The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.6.5 Training Holidays: RESERVED
1.6.6 Place of Performance: The work to be performed under this contract will be performed at the various vehicle gate locations around the 1SFG compound on JBLM, WA.
1.7 Security Requirements: The following information is provided on security related matters.
1.7.1 Security Program: Not Applicable.
1.7.2 Personnel Security Clearance Requirements: Not Applicable
1.7.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.7.3.1 Installation Pass Log: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. The employee performing services under this contract shall provide all information required for background checks to meet installation access requirements to the installation Provost Marshal Office, Director of Emergency Services, or Security Office. In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five
(5) days after any changes to the log.
1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within one (1) day.
1.7.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within one (1) day.
1.7.3.4 Common Access Cards (CAC) and CAC Log: Not Applicable.
1.7.4 Background Checks: The Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement.
Documentation of these checks will be made available to the KO or COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a background security check reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
• Full birth name
• Married name (if applicable)
• ID card number
• Date of birth
• Place of birth (city, country)
1.7.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S. background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within five (5) of receipt by the Contractor, identifying such with the appropriate contract number. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within two (2) days of receipt by the Contractor, identifying such with the appropriate contract number. When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.7.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
1.7.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.8 Key Control: Not Applicable
1.9 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.9.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.10 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.11 Key Personnel:
a. Electronics Technician Maintenance (ETM) II is the minimum level of technician required for the quarterly servicing of the gates.
b. Electronics Technician Maintenance (ETM) III is the minimum level of technician required for emergency callouts or repairs.
1.12 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc.
1.13 Contractor Travel: Not Applicable
1.14 Other Direct Costs (ODCs): RESERVED
1.15 Data Rights: RESERVED
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: Reserved
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase-In /Phase-Out Period: Reserved
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention
Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting
Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen
(15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than one (1) day that such notifications were made.
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program: Not Applicable
1.23 Required Training: The following provides information on training requirements.
1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 calendar days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 10 calender days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve
(12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.
Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within ten (10) days after completion of the training.
1.23.2 OPSEC Training: All Contractor employees and sub-Contractor employees performing services under this contract will complete Level I OPSEC training within 30 calendar days of employment under this contract. OPSEC Level I training is available at https://jkodirect.jten.mil, course number “EUC-ECJ6-110-N-LB”. Training must have been completed within the last 12 months and maintained yearly thereafter. If training cannot be conducted on the website, the Contractor will coordinate with the local OPSEC Officer at their assigned location for classroom training by a Level 2 trained OPSEC Officer and a copy of either the training certificate or the training attendance roster signed by the OPSEC Officer will be maintained by the Contractor. Verification of the training will be provided to the COR or KO upon request.
1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 days after the contract is awarded and within 10 days after new employees commence contract performance, with the results reported to the COR within 30 days after the contract is awarded and within 10 days after new employees commence contract performance. Training slides can be found on the Army OneSource we site:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
1.23.4 Information Assurance (IA) Training Reserved
1.23.4.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp .
1.23.5 Personally Identifiable Information (PII): Not Applicable.
1.24 Government Property and Services: Not Applicable.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.
Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”
Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Day – means, unless otherwise specified, a calendar day.
Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable – means anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract
Government Property - means all property owned or leased by the Government.Government property includes both Government-furnishedand Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.
High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.
Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document, and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.
Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.
Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
Unscheduled Repair –defined as repaire required due to any malfunction, physical damage (e.g., vehicle strike), or system failure that compromises the physical security perimeter, prevents access, or poses a hazard preventing typical operation.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless otherwise specified.
2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification
IT Information Technology KO Contracting Officer OCI Organizational Conflict of Interest 1SFG 1st Special Forces Group (Airborne) OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison UOM Unit of Measure
PART 3
GOVERNMENT PROPERTY (GP) AND SERVICE
3. Government Property and Services
3.1 Services: Reserved
3.2 Facilities: Reserved
3.3 Utilities: Reserved
3.4 Equipment: Reserved
3.5 Special Tooling and Test Equipment: Reserved
3.6 Materials: Reserved
3.7 Training: Not Applicable
3.8 Common Access Cards (CAC): Not Applicable
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Property and Services
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.
4.2 Secret Facility Clearance: Reserved
4.3 Materials: The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
4.4 Vehicles and Equipment: The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
4.5 Background Checks: The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.
PART 5
SPECIFIC TASKS
5.1 Basic Services: The contractor shall provide Quarterly Gate Maintenance, all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform quarterly maintenance as defined in this PWS for the Vehicle Point Of Entry Gates used by the located on Joint Base Lewis McChord, WA. The contractor shall perform to the standards in this contract.
The Contractor shall achieve this through the following Contract Line Item Numbering (CLIN) structure:
CLIN0001: Perform systematic, quarterly preventative maintenance—encompassing all mechanical, electrical, and safety components. All preventive maintence will be done on a quarterly basis with no more than 4 preventative maintenance checks conducted within a 12-month period. See paragraphs 5.2.1 through 5.2.6 for specifics tasks.
CLIN0002: Provide unscheduled repair services to minimize operational downtime and maintain perimeter security integrity. All unscheduled repairs will be inspected and a quote for repairs provided to 1SFG(A) with 2 business days following the initial assessment. See paragraphs 5.3.1 through 5.3.4 for specifics tasks.
All unscheduled service call for repairs under $2,500 will be paid using the Government Purchase Card. All unscheduled service calls for repairs in excess of $2,500 will be invoiced via Wide Area Workflow and an electronic payment from the Defense Finance Accounting System (DFAS) will be made.
5.2 Tasks: Contractor shall provide non-personal services required to perform quarterly maintenance and repair the non-operational gates as require by the PWS.
5.2.1 Quarterly Preventative Maintenance and Safety Inspections.
The Contractor shall perform comprehensive quarterly maintenance and safety inspections on all vehicle traffic control gates listed in the Government Furnished Property (GFP) inventory.
All work shall be conducted in accordance with original equipment manufacturer (OEM) manuals and Underwriters Laboratories (UL) 325 safety standards.
5.2.2 Mechanical System Inspections.
The Contractor shall inspect, adjust, and service all mechanical components to ensure smooth and reliable gate operation.
5.2.2.1 The Contractor shall lubricate all hinges, guide rollers, bearings, and drive chains/belts using OEM-approved lubricants.
5.2.2.2 The Contractor shall inspect and adjust the tension of all drive chains and belts to prevent slippage or snapping.
5.2.2.3 The Contractor shall verify the structural integrity of the gate, checking for sagging, cracks, and ensuring all mounting hardware, nuts, and bolts are torqued to specifications.
AQL: Pass or Fail
5.2.3 Electrical and Control System Inspections.
The Contractor shall inspect and test all electrical components to prevent system degradation and ensure continuous operation.
5.2.3.1 The Contractor shall clean the interior of all control board enclosures, removing debris, moisture, and pest infestations.
5.2.3.2 The Contractor shall inspect all wiring harnesses, terminal blocks, and conduits for fraying, corrosion, or loose connections.
5.2.3.3 The Contractor shall test the battery backup systems under load to verify the gate will operate during a primary power failure.
5.2.4 Safety Device and Compliance Inspections.
The Contractor shall test all entrapment protection devices to ensure full compliance with UL 325 and Department of Defense (DoD) physical security standards.
5.2.4.1 The Contractor shall clean, align, and test all photoelectric sensors (photo eyes) to ensure the gate reverses immediately upon beam interruption.
5.2.4.2 The Contractor shall test all contact safety edges to verify they trigger a system halt and reverse upon physical resistance.
5.2.4.3 The Contractor shall calibrate and test all in-ground inductance loop detectors to ensure accurate vehicle detection and prevent premature gate closure.
AQL: Pass or Fail
5.2.5 Emergency Access and Manual Operation.
The Contractor shall verify that emergency personnel and guards can operate the gates during catastrophic system failures.
5.2.5.1 The Contractor shall test the manual emergency release mechanisms to ensure they disengage the drive motor smoothly without the use of specialized tools.
5.2.5.2 The Contractor shall test all first responder access systems (e.g., Knox boxes, Siren- Activated Sensors) to verify immediate authorization and gate opening.
AQL: Pass or Fail
5.2.6 Documentation and Deficiency Reporting.
The Contractor shall provide written documentation of all quarterly inspections to the Contracting Officer's Representative (COR).
5.2.6.1 The Contractor shall submit a completed Quarterly Maintenance Checklist for each gate within five (5) business days of inspection completion.
5.2.6.2 The Contractor shall immediately notify the COR of any critical deficiencies discovered during the inspection that require repair beyond the scope of routine maintenance.
AQL: Pass or Fail
5.3 Unscheduled Repair Services.
The Contractor shall provide repair services for all vehicle traffic control gates covered under this contract within 72-hours of notification. Unscheduled repair is defined as any malfunction, physical damage (e.g., vehicle strike), or system failure that compromises the physical security perimeter, prevents emergency access, or poses a hazard.
5.3.1 Diagnostics and Troubleshooting.
Upon arrival, the Contractor shall immediately assess the inoperable gate to determine the root cause of the failure and the required corrective actions.
5.3.1.1 The Contractor shall perform necessary diagnostics on all mechanical, electrical, and structural components to isolate the fault.
5.3.1.2 The Contractor shall provide a verbal or email situation report to the on-site COR or designated representative within one (1) hour of arrival, detailing the fault and the estimated time to restore operation.
AQL: Pass or Fail
5.3.2 Repair Execution and Security Restoration.
The Contractor shall execute all necessary repairs to restore the gate to fully operational status in accordance with original equipment manufacturer (OEM) specifications and Underwriters Laboratories (UL) 325 standards.
5.3.2.1 The Contractor shall bypass, repair, or replace failed components to immediately restore basic open/close functionality and secure the perimeter.
5.3.2.2 If permanent repairs cannot be completed during the initial response (e.g., catastrophic damage requiring heavy equipment or specialized unstocked parts), the Contractor shall manually secure the gate in the closed/locked position or as directed by the COR to maintain perimeter integrity.
AQL: Pass or Fail
5.3.3 Parts, Materials, and Component Replacement.
The Contractor shall utilize appropriate replacement parts to ensure longevity and compatibility with existing infrastructure.
5.3.3.1 The Contractor shall provide and install OEM-approved replacement parts for any components deemed unrepairable.
5.3.3.2 If the required repair exceeds the established threshold for routine emergency materials (as defined in the contract's fixed-price or materials CLIN), the Contractor shall submit a written repair estimate to the Contracting Officer (KO) and COR for approval prior to installing major structural or motor replacements.
5.3.4 Post-Repair Testing and Documentation.
The Contractor shall validate all repairs and provide official documentation to the Government.
5.3.4.1 The Contractor shall conduct a full operational cycle test (open, close, safety reverse) in the presence of the COR or designated representative prior to departing the site.
5.3.4.2 The Contractor shall submit a formal Repair Report to the COR within three (3) business days, detailing the time of notification, time of arrival, root cause of failure, parts replaced, and total labor hours expended.
5.4 Service Contract Reporting: RESERVED
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.
6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)
6.1.2 Department of Defense Security Agreement (DD Form 441)
6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)
6.1.4 Installation Access Control (AE Reg 190-16)
6.1.5 The Army Physical Security Program (AR 190-13)
6.1.6 Contractor Identification (AE Reg 27-715)
6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)
6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)
6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)
6.1.10 Information Assurance (AR 25-2)
6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)
6.1.12 Policies and Procedures for Property Accountability (AR 735-5)
6.1.13 DODI 2000.16 DoD Antiterrorism (AT) Program
PART 7
ATTACHMENT AND TECHNICAL EXHIBIT LISTING
7. Attachment and Technical Exhibit List
7.1 Technical Exhibit A – Performance Requirements Summary
7.2 Technical Exhibit B – Deliverables Schedule
7.3 Attachment 1 – Performance Requirements Summary
7.4 Attachment 2 – Deliverables Schedule
7.5 Attachment 3 – Gate Locations
6. Diagnostics & Troubleshooting
a. Para 5.3.1
Assess inoperable gates upon arrival;
isolate faults and submit a verbal or email situation report to the COR within 1 hour of arrival.
100% Pass (Zero deviations allowed;
Pass/Fail)
100% Inspection
7. Repair Execution & Security
a. Para 5.3.2
Restore gates to fully operational status IAW OEM specs and UL 325 standards;
manually secure gates or establish perimeter integrity immediately if permanent repairs are delayed.
100% Pass (Zero deviations allowed;
Pass/Fail)
100% Inspection
8. Parts & Material Thresholds
a. Para 5.3.3
Install OEM-approved parts; obtain written Contracting Officer (KO)/COR approval prior to installing any major components that exceed established routine material thresholds. GPC Shall be used for any repair services up to $2,500.
100% Pass (Zero deviations allowed;
Pass/Fail)
100% Inspection
9. Post-Repair Testing & Docs
a. Para 5.3.4
Conduct a successful full operational cycle test witnessed by the COR prior to departure; submit a formal Repair Report within 3 business days.
100% Pass (Zero deviations allowed;
Pass/Fail)
100% Inspection
ATTACHMENT 3
Gate Locations
File details come from the government source that posted it. Updated .