PWS Protective Garments and Shop Towels Rental and Laundry Services PWS 10 JAN 2023.docx
DOCX document 58 KB Posted
- Solicitation number
- W912LN-23-Q-0015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLAUSES and PROVISIONS W912LN23Q0015 Coveralls.docx | DOCX document | |
| National Guard Protest Procedures.1661960517591.docx | DOCX document | |
| Solicitation W912LN-23-Q-0015 Coveralls FY23 plus options.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
COVERALL, FLAME RETARDANT GARMENT AND SHOP TOWEL
RENTAL AND LAUNDRY SERVICES
1.0 General: This is a firm fixed price contract for protective clothing and shop towel rental and laundry services.
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform coverall, flame retardant garment, and shop towel rental and laundry services, as defined in this PWS.
1.2 Background: Vermont Army National Guard (VTARNG) has a requirement for supply and laundering of coveralls, fire retardant garments and shop towels at its maintenance facilities.
1.3 Period of Performance (PoP):
| Period |
| Dates |
| Base Period (52 Weeks) |
| 01 APR 2023 – 31 MAR 2024 |
| Option year 1 (52 Weeks) |
| 01 APR 2024 – 31 MAR 2025 |
| Option Year 2 (52 Weeks) |
| 01 APR 2025 – 31 MAR 2026 |
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0630 -1630 on Tuesday through Friday except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at the following locations:
Camp Johnson BLDG. 6, Colchester, 792 Airport Rd. Fair Haven, 6115 VT Rt 100 North Hyde Park, 23 Armory Lane Westminster, 57 Ethan Allen Rd Jericho, 141 Shamrock Rd. So. Burlington.
The contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.1 Telework is not authorized.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): Reserved.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 For contractors requiring Common Access Card (CAC): Reserved
1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a government representative).
1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website: https://jko.jten.mil/courses/atl1/launch.html.
1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Use of Government Information Systems (IS). Reserved
1.4.5.7 Army Training Certification Tracking System (ATCTS). Reserved
1.4.5.8 Information Assurance (IA) Training. Reserved
1.4.5.9 Information Technology (IT) certification. Reserved
1.4.5.10 Protection of Personally Identifiable Information (PII). Reserved
1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR or the KO within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm
1.4.5.12 OPSEC SOP/Plan. Reserved
1.4.5.13 Access to Classified Information. Reserved
1.4.5.14 Threat Awareness and Reporting Program (TARP). Reserved
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control. Reserved.
1.4.6.2 Lock Combinations. Reserved.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all licenses required in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR or KO to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles pass) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel. Reserved
1.4.13 Data Rights. Reserved
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Phase In / Phase Out Periods. Reserved
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of a product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
| AEI | Army Enterprise Infostructure | |
| AR | Army Regulation | |
| AT/OPSEC | Antiterrorism/Operational Security | |
| BI | Background Investigation | |
| CM | Contract Manager | |
| COR | Contracting Officer Representative | |
| DA | Department of the Army | |
| DD254 | Department of Defense Contract Security Classification Specification | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DoD | Department of Defense | |
| DSCA | Defense Counterintelligence and Security Agency | |
| FAR | Federal Acquisition Regulation | |
| GFP/M/E/S | Government Furnished Property/Material/Equipment/Services | |
| HQDA | Headquarters, Department of the Army | |
| HSPD | Homeland Security Presidential Directive | |
| IA | Information Assurance | |
| IS | Information System(s) | |
| KO | Contracting Officer | |
| NGB | National Guard Bureau | |
| OCI | Organizational Conflict of Interest | |
| PII | Personally Identifiable Information | |
| PIPO | Phase In/Phase Out | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program | |
| SCR | Service Contract Reporting | |
| SSN | Social Security Number | |
| TE | Technical Exhibit | |
| USD(I) | Under Secretary of Defense for Intelligence |
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property. Reserved.
3.2 Materials. Reserved.
3.3 Equipment. Reserved.
3.4 Services. Reserved.
3.5 Utilities. Reserved.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance. Reserved.
4.3 Contractor Security Clearance: Reserved.
5.0 Requirements: The contractor shall:
5.1 Provide the following items:
5.1.1 Protective clothing: The coveralls and fire-retardant garments provided under this contract shall meet OSHA standards for applicable work areas as specified in 29 CFR Part 1910. Coveralls must fit over safety boots/shoes. The VTARNG will provide initial sizing information to the Contractor in writing prior to the first delivery. The Contractor will be responsible for tailoring coveralls and fire-retardant garments to the extent necessary to ensure appropriate and safe fit. Garments shall be maintained in sound condition with no rips and with all fasteners properly attached. The Contractor shall be responsible for the repair of all damage to the rental garments. Garments requiring replacement due to ordinary wear and tear shall be replaced at the Contractor’s expense. Items requiring replacement due to damage beyond ordinary wear and tear shall be at the government’s expense.
5.1.2 Shop Towels: Shop towels are to be free of foreign objects, grease, and holes (as determined by industry standards). Towels shall be bundled in accordance with the Contractor’s standard practices. Shop towels are required to be lint free. Any shop towel determined by the Contractor or the VTARNG to contain environmentally hazardous material shall be disposed of by the Contractor in accordance with State and Federal laws and regulations.
5.1.3 Deliver and pick up of items:
The Contractor shall maintain a weekly delivery and pick up schedule for each location as specified in Technical Exhibit 2. Contractor shall be responsible for ensuring the required quantity and proper size garments and towels are delivered on normally scheduled pick-up and delivery days. In the event a delivery is scheduled for a day when the VTARNG facility will be closed (due to holiday and/or VTARNG compressed work week schedule – see paragraph 6), the VTARNG Shop Chief will coordinate with the Contractor to deliver sufficient quantity of product prior to that day in order to meet the requirements of the shop personnel until the next scheduled delivery. Should the garment sizes change at any location; the VTARNG will notify the Contractor to adjust quantities and sizes accordingly.
The Contractor shall provide VTARNG with the total number of protective garments and shop towels called for in Technical Exhibit 2, delivered in the specified quantities per location. Any change (increase or decrease) to the total quantity of items to be delivered to VTARNG must be made through a bilateral modification to the contract, performed by the Contracting Officer. The COR does not have authority to change total quantities in the absence of a properly executed modification. However, the COR does have authority to adjust the quantities to be delivered to each location without a contract modification, provided the total quantity provided to VTARNG does not change.
5.1.4 Cleaning of items:
The Contractor shall launder garments to the highest industry standard on a weekly basis.
5.1.5 In order to comply with federally mandated environmental preference programs and Department of Defense (DoD) Sustainable Procurement Program (SPP) policy requirements, the contractor shall, to the maximum extent possible without detracting from the quality delivered to the end user, make use of environmentally preferable products and services in performance of this contract. For example: using Bio Preferred or Safer Choice laundry products (see https://www.epa.gov/saferchoice and https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#); using Energy Star clothes washers and dryers (see https://www.energystar.gov/); using fuel-efficient or alternative fuel vehicles (or other sustainable methods) for pickup and delivery of laundry; limiting use of plastic packaging and/or implementing recycling/reuse programs for hangers, poly bags, etc.; implementing practices to conserve water and energy; and if dry cleaning is performed, employing dry cleaning practices that use non-toxic cleaning agents rather than toxic solvents.
5.2 Contractor Manpower Reporting Application (CMRA): Not Applicable.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
| Date of Publication |
| Mandatory or Advisory |
| Website |
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars
Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 01/23/2014 (Change 1: 07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf
| DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP) |
| 04/03/2017 |
https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC) 09/09/14 (Change 1: 05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors 08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy Program 05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce Improvement Program 12/19/2005 (Change 4: 11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM) 02/28/2006 (Change 2: 05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors 03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx
AR 25-2
Information Assurance 04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 530-1
Operations Security 09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 525-13
Antiterrorism 12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 381-12
Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4. b) 06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
| Form |
| Date |
| Website |
I-9 Employment Eligibility Verification
| 10/21/2019 |
| https://www.uscis.gov/sites/default/files/files/form/i-9.pdf |
DD 441
Department of Defense Security Agreement
| Feb2020 |
| http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm |
DD 250
Material Inspection and Receiving Report
| Aug 2000 |
| https://www.esd.whs.mil/Directives/forms/dd0001_0499/ |
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
| 5.1.1. Protective clothing meets industry standards |
| Protective clothing (fire retardant garments and coveralls) provided under this contract will meet OSHA standards for the applicable work areas as specified in 29 CFR Part 1910. |
| 0 garments provided in any month that are not fully compliant with the standard. Must be 100% in compliance. |
| Inspection upon delivery and/or by end users of garment and towels / Shop personnel will communicate with COR |
| 5.1.1. Protective clothing meets industry standards |
| Garments shall be maintained in sound condition with no rips and with all fasteners properly attached. |
| No more than 5 garments provided in any month that are not fully compliant with the standard. |
| Inspection upon delivery and/or by end users of garment and towels / Shop personnel will communicate with COR |
| 5.1.2 Shop Towels meet industry standards |
| Shop towels are to be free of foreign objects, grease, and holes (as determined by industry standards). |
| No more than 25 towels provided in any month that are not fully compliant with the standard. |
| Inspection upon delivery and/or by end users of garment and towels / Shop personnel will communicate with COR |
| 5.1.3 Delivery and pick up of clothing and shop towels |
| The Contractor shall be responsible to ensure that the proper sizes of garments are delivered. |
| No more than 2 garments provided in any month that are not fully compliant with the standard. |
| Inspection upon delivery and/or by end users of garment and towels / Shop personnel will communicate with COR |
| 5.1.3 Delivery and pick up of clothing and shop towels |
| The Contractor shall be responsible to ensure that the required quantity of garments and towels are delivered. |
| No more than 2 instances in any month where not fully compliant with the standard. |
| Inspection upon delivery and/or by end users of garment and towels / Shop personnel will communicate with COR |
| 5.1.3 Delivery on predetermined day of week |
| The Contractor shall maintain weekly delivery and pick up at the locations in Technical Exhibit 2 on the predetermined day of week. |
| No more than 1 instance in any month where not fully compliant with the standard. |
| Shop POC / Shop personnel will communicate with COR |
| 5.1.4 Cleaning of clothing and shop towels |
| The Contractor shall launder garments to industry standard on a weekly basis. |
| No more than 5 garments provided in any month that are not fully compliant with the standard. |
| Inspection upon delivery and/or by end users of garment and towels / Shop personnel will communicate with COR |
TECHNICAL EXHIBIT 2
Deliverables Schedule
Protective Clothing Requirements
| Location Description |
| City |
| Address |
| Coveralls |
| Flame Retardant Garments |
| CSMS |
| Colchester |
| Camp Johnson Bldg. 6 |
| 44 |
| 18 |
| FMS-2 |
| Fair Haven |
| 792 Airport Road |
| 9 |
| 0 |
| FMS-3 |
| Hyde Park |
| 6115 VT Rt 100 North |
| 23 |
| 0 |
| FMS-4 |
| Westminster |
| 23 Armory Lane |
| 12 |
| 0 |
| UTES |
| Jericho |
| 57 Ethan Allen Road |
| 22 |
| 0 |
| Total |
| 110 |
| 18 |
Shop Towel Requirements
Location Description
City
Address Monthly Quantity (Each)
| CSMS |
| Colchester |
| Camp Johnson, Bldg. 6 |
| 500 |
| FMS-2 |
| Fair Haven |
| 792 Airport Road |
| 250 |
| FMS-3 |
| North Hyde Park |
| 6115 VT Rt 100 North |
| 500 |
| FMS-4 |
| Westminster |
| 23 Armory Lane |
| 250 |
| UTES |
| Jericho |
| 57 Ethan Allen Road |
| 400 |
| AASF |
| So. Burlington |
| 141 Shamrock Road |
| 150 |
| Total |
| 2,050 |
File details come from the government source that posted it. Updated .