This is a Performance Work Statement for overhead hoist maintenance and repair services at Joint Base Andrews (JBA) and Davidsonville, Maryland, issued by the 316 Civil Engineer Squadron/Civil Engineer Operations Element on September 10, 2026.

The contractor must provide all labor, transportation, equipment, lifts, materials, tools, supplies, and supervision for inspections, testing, maintenance, and repairs of overhead hoists. Services must comply with OSHA, ASME, Department of the Air Force Manual 91-203, and ANSI regulations, plus manufacturer specifications. All technicians performing work must be qualified persons with formal training and deep working knowledge of applicable standards. The contractor will conduct annual preventive maintenance inspections coordinated with the Contracting Officer Representative (COR) at least 72 hours in advance, with inspection results documented and provided to the COR within five business days. Every four years, the contractor must execute functional, operational, and load/weight testing using 100-125 percent of designated rated capacity. For repairs exceeding $3,000, formal Contracting Officer authorization is required. Service call repairs (both routine and emergency) are available between preventive maintenance intervals; non-emergency service calls require response within two business days, while emergency calls require on-site response within four hours and repair commencement within 24 hours. Service hours are billed on a labor-hour basis with pre-negotiated rates, excluding travel time. Reimbursable parts are covered at actual acquisition cost less discounts; items under $3,000 require one invoice, while items $3,000 and above require three competitive quotes. The contractor must submit a Quality Control Plan within 15 calendar days of contract award and maintain service records with COR-annotated tickets for payment authorization. Hours of operation are 7:00 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays. Appendix A lists 41 overhead hoists across multiple buildings with varying capacities (500 lbs to 20 tons) and heights (12.5 ft to 62 ft), including manual chain, electric wire rope, and monorail-mounted equipment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement | v1.0

PERFORMANCE WORK STATEMENT

FOR

OVERHEAD HOIST MAINTENANCE AND REPAIR

316 CES/ CEOES

10 September 2026

1. Description of Services

1.1 Scope

The Contractor shall furnish all labor, transportation, equipment, lifts, materials, tools, supplies, and supervision necessary to perform inspections, test, maintenance and repairs on the overhead hoist and associated equipment located on Joint Base Andrews (JBA) and Davidsonville MD. The Contractor’s maintenance and inspection program shall be based on original equipment manufacturer’s recommendations. Hoist inspections shall be an in-depth assessment, available for all brands, types, and sizes of overhead hoists, to help ensure regulatory compliance and assist with safety and reliability.

1.2 Overhead Hoist

The maintenance, repair, and inspection of these systems shall adhere and comply with applicable

Occupational Safety and Health Administration, (OSHA), American Society of Mechanical Engineers

(ASME), Department of the Air Force Manual 91-203 (DAFMAN), and American National Standards

Institute (ANSI) regulations, in addition to manufacturer’s equipment specifications and recommendations (i.e., Operation and Maintenance Manuals). All work shall be performed by technicians who are qualified persons who possess formal training with deep working knowledge of the applicable standards to work on Overhead Hoist systems.

1.2.1 Preventative Maintenance (PM) and Repair Work

The purpose of this work is to prevent and correct equipment deficiencies, minimize breakdowns and service interruptions, extend systems’ life and maximize efficient operation. Mechanical and electrical safety checks shall be completed to ensure the safety of all systems. On an annual basis, a certified inspector shall inspect, test, adjust, and perform repairs in order to maintain equipment in a normal operating condition, as the manufacturer intended. Deficiencies found shall be corrected during scheduled maintenance, ensuring optimum, uninterrupted system operations. Hoist locations are identified in

Appendix A. Inspections shall be coordinated with Contracting Officer Representative (COR) and facility managers at least 72 hours in advance of the inspection. The inspector shall document results of the annual inspections and make available to the COR within five (5) days, for the purpose of developing follow-on maintenance schedules as determined necessary. Estimated quantities for determining workload are listed in Appendix A. Based on estimated workload data listed in the Performance Work Statement

(PWS), the Contractor shall submit a price quotation identifying the nature of work, reimbursable parts and crew hours. This information must be received by the CO/COR prior to work being performed. In no case shall the Contractor start work without providing a written cost estimate to the COR for verification the technical necessity of the repair. Formal authorization and approval for equipment repairs exceeding

$3,000 must come from the Contracting Officer. The documentation must be sufficiently detailed to identify, at a minimum, the hoist type, location, preventive maintenance work performed, repairs needed and estimated cost.

1.2.1.1 Every four (4) years during scheduled inspections, or performed as required following a major load-bearing structural repair, the contractor shall execute functional, operational, and load/weight testing to ensure the reliable operation of the assets listed in Appendix A. Any executed load test shall be performed using a weight of not less than 100 percent and not greater than 125 percent of the designated rated capacity.

1.2.1.2 The Contractor shall perform maintenance to systems as prescribed in the applicable manufacturer’s Operation and Maintenance manual(s). Each hoist will have a manual the contractor is to adhere to.

1.2.1.3 Any damages resulting from the Contractor’s operations shall be expeditiously repaired or replaced by the Contractor at no additional cost to the Government.

1.2.1.4 The Contractor shall submit complete service records to the COR office within five (5) business days of the final inspection and certification.

1.2.1.5 Inspection Reports. The Contractor shall provide a report within five (5) business days of the annual inspection. The report will identify each hoist, the location, maintenance work performed, repairs needed, date of inspection, name of inspector, and overall condition of equipment.

1.2.1.6 Inspection Certification and Sticker. The Contractor shall place a sticker on each overhead hoist upon completion and passing of the certification inspection. The sticker shall state the company name, inspector’s name, and date of inspection. The Contractor shall also provide the COR with a Certification

Inspection Certificate within five (5) business days of completion.

1.2.2 Service Call Repairs

Service repairs are those deemed necessary by the Government between preventative maintenance intervals. The Contractor may be contacted by the COR to for unscheduled maintenance. Service calls may be in the form of routine or emergency calls as determined by the COR and the Contracting Officer’s office. The Government shall not be charged for those portions of service call repairs covered by a warranty. All deficiencies shall be corrected during the service call repair within a maximum of two (2) business days after the contractor’s on-site arrival and confirmation of the availability of all necessary parts and equipment. Once the Contractor has inspected the hoists in need of repairs, the Contractor must provide the COR and Contracting Officer with a list of parts needed for repairs. The Contractor is responsible for any approved required parts for repairs, or any delays resulting from shipping or manufacturing. Once the repairs are scheduled, the Contractor shall have all equipment and material required to start work upon arrival at the service location. All repair work shall be in accordance with normal commercial practices using parts specified by the manufacturer or items of equal or better quality.

The downtime of the system shall be kept to an absolute minimum. The Contractor must notify the COR and Contracting Officer of all projected downtime and estimated time for repair.

1.2.2.1 SERVICE HOURS. In a firm fixed price contract a service hour consists of all personnel, management, tools, and equipment assigned to accomplish a repair or service call for each hour on the job site. It does not include travel time, or breaks taken while on the job site. All unscheduled service calls are evaluated on a Labor-Hour basis with pre-negotiated labor rates, while the PM program remains FFP.

1.2.2.2 Upon arriving at JBA, the Contractor shall notify the COR prior to the start of work. The COR will annotate the start time on the Contractor’s service ticket. The Contractor shall only bill for the time on site. The drive time to and from site is not an authorized billing expense and will not be included in billing.

1.2.2.3 Non-emergency Service Calls: The Contractor shall respond on-site to non-emergency service calls within 48 business hours or within two (2) business days.

1.2.2.4 Emergency Service Calls: The Contractor shall respond on-site to emergency repair calls within 4 hours following notification with repairs to begin within 24 hours of notification of emergency. For emergencies after duty hours, the Contractor will contact the COR upon arrival and departure of work site.

1.2.2.5 The Contractor shall maintain service call records and ensure all records are accurate, current, and provide sufficient data for accounting purposes. Service tickets must have a unique identification number and shall include the date work was issued, the work location, the equipment serviced, a description of service performed and a description of reimbursable parts. Only service tickets which have been annotated by the COR with the start time, completion time and the appointed COR signature will be accepted for payment. A carbon copy of the service ticket shall be provided to the COR at the completion of each service.

1.2.3 Reimbursable Parts

The Contractor shall be responsible to obtain all parts necessary for the performance of this contract and shall be reimbursed at cost. Parts are reimbursed at actual cost of acquisition less discounts, rebates, allowances, and commissions, and will exclude General & Administrative (G&A) expenses, management fees, or profit margins. The contractor request for reimbursement must be supported by a copy of the supply invoice for less $3,000.00 from the acquisition source. Items greater than $3,000.00 or more shall require (3) different quotes to be approved/disapproved by the COR. For reimbursement, the Contractor must submit invoices and supporting documentation. Vendor receipts must be the original if hand delivered, or via electronic scan.

1.3 Contractor Requirements

Quality Control. The contractor shall develop and maintain a quality program to ensure maintenance and repair services are performed in accordance with the performance work statement and applicable standards and codes. The Contractor shall develop and implement procedures to identify and prevent defective services from recurring. As a minimum, the Contractor shall develop quality control procedures that address the areas identified in paragraph 2, Service Delivery Summary. The Government evaluator must have a specific quality control inspector to notify in case of customer complaints. The Contractor shall submit a Quality Control Plan (QCP) to the CO and COR within 15 calendar days after of contract award, outlining procedures to identify, prevent and ensure non-recurrence of defective services.

2. Service Delivery Summary.

Performance Objectives PWS

Reference

Performance Thresholds

Perform Annual Inspections, Preventive

Maintenance.

1.2.1.1 No more than one (1) defect per service year

or annually

Service Call Repairs. Repairs made in a timely Manner. COR informed of

Expected repair time. Response and repair made within the specified time.

1.2.2, 1.2.2.3, 1.2.2.4

No more than one

(1) defect or validated customer complaint per service month.

Submit Annual Inspections, Maintenance and

Repair Reports. Accurate reports are delivered before departing JBANAF to COR office

1.2.1.4, 1.2.1.5, 1.3.2

No more than one

(1) defect per service month.

3. Government Furnished Property and Services

3.1 Security Police and Fire Protection

The Government will provide general on base security police and fire protection service. In return for these services, the Contractor shall adhere to the security and fire directives, instructions and policies of

JBA. Security Forces phone extensions for calls are 911 and 301-981-2001 for routine calls.

3.2 Emergency Medical Services

Contractor is responsible for their workers safety, however, Ambulance and emergency medical attention can be provided to the contractor personnel while on this installation.

4. General Information

4.1 Hours of Operation

Hours of operation are from 7:00 a.m. – 4:00 p.m., Monday through Friday, except recognized federal holidays.

4.2 Security Requirements

All personnel employed by the Contractor, in the performance of this contract, or any representative of

Contractor entering the Government installation, shall abide by all security regulation on the installation.

REAL-ID Compliant Identification is required to obtain access to the base.

4.3 Base Passes

To obtain base passes, employees must pass a basic background investigation; the Contractor shall provide, on company letterhead, the names of each employee with the information listed below. This information shall be provided to the COR representative for coordination with Joint Base Andrews

Visitor Control Center (VCC) for approval and completion of a Long-Term Contractor Access Pass. The

Contractor shall be responsible for the return of passes issued to employees who separate from the contract before the expiration date of each contract period. Lost or stolen passes shall be reported immediately to the COR. Contract employees shall not enter restricted areas and are subject to search according to Security Forces (SFS) regulations.

• Full Name, Social security number

• Date of birth

• Vehicle tag number and insurance information, DL# and state of issue

• Eye color, Hair color, Height, Weight

• Cell phone number

4.4 Weapons

Weapons of any sort are not authorized on JBANAF, this includes guns, knives, swords, numb chucks, brass knuckles, or any other weapon that has a sole purpose to injure or maim. Combination tools such as

Leatherman and small pocket knives with folding blades less than four inches are authorized if used in the performance of duty. Those found in violation of this directive are subject to apprehension, criminal charges and debarment from the installation.

4.5 Illegal Controlled Substance

The Contractor shall comply with all federal laws regarding controlled substances. Possession, distribution, or use of federally controlled substances, including marijuana/cannabis, is strictly prohibited on federal property, regardless of state legalizations. Illegal controlled substance and narcotics are not authorized on JBANAF whatsoever, controlled substances may not be transported on the installation via vehicle or on an individual person, i.e., marijuana/Cannabis, cocaine, crack cocaine, LSD, Methamphetamine (Meth), Heroin, Anabolic steroids, Psilocybin mushrooms, are some of forbidden substances (this list is not all inclusive). Prescription medications are authorized for the person the medication is issued; however, the medication must not be expired, and the label must clearly indicate the name of the person the medication is issued too. Otherwise, the prescription medication may be deemed illegal by the law enforcement officials. Those found in violation of this directive are subject to apprehension, criminal charges and debarment from the installation.

4.6 Safety

Contractor shall comply with all applicable Occupational Safety & Health Administration and Air Force

Occupational Safety & Health standards.

4.7 Performance of services during crisis

In the event the Contractor is unable to perform his daily operations due to peacetime emergency and/or wartime contingency disturbances, etc., neither the Government nor the Contractor shall act for non-compliance with contract requirements. Upon notification by the Contracting Officer or COR, the

Contractor shall perform emergency and special event services (Contingencies, Operational Readiness

Exercises or Inspections, Facility operations on an extended basis up to 24 hours per day, etc.), as required. Emergency and special event services will be priced separately from routine services.

Appendix A: Estimated Workload Data

BLDG TYPE SERIAL # CAPACITY APPROX

HEIGHT

1558 Acco Wright – Manual/Chain- 9/16”

N/A 3 TON 15 FT

1558 Acco Wright – Manual Chain- 1/2”

N/A 3 TON 15 FT

1706 Acco Wright – Manual/chain B1S894 500 LBS 14 FT

1791 Jet – Manual/chain 1132 1 TON 13 FT

1900 Yale – electric/wire rope W316472.A 20 TON 24 FT

1910 Detroit Hoist/Monorail S2S1316 5 TON 50 FT

1914 Yale Global King-electric/wire rope

G32993NC 5 TON 30 FT

1915 R & M-electric/wire rope H28466 3.5 TON 30 FT

1932 Yale-Manual/Chain H001 2 TON 15 FT

1932 Yale-Manual/Chain H002 2 TON 15 FT

1932 Euclid-Electric/Wire rope 373S91-H003 5 TON 15 FT

1932 Yale-Manual/Chain H004 2 TON 15 FT

1932 Yale-Manual/Chain H006 3 TON 15 FT

1932 Yale-Manual/Chain H008 2 TON 15 FT

1933 Wright-manual/chain 1012337 (H011) 1 TON 15 FT

1933 Wright-manual/chain 1012338 (H012) 1 TON 15 FT

1933 Wright-manual/chain 1012339 (H013) 1 TON 15 FT

3148 Coffing – manual/chain 2.158.H.RL 2 TON 15 FT

3148 Coffing – manual/chain 2.228.H.QL 2 TON 15 FT

3158 DeShazo-Double Girder Top Run 44492 5 TON 30 FT

BLDG TYPE SERIAL # CAPACITY APPROX

HEIGHT

3188 Coffing chainfall manual (monorail mounted)

#7 2 TON 15 FT

3188 Yale-chainfall manual (monorail mounted)

#8 2 TON 15 FT

3320 CM-electric/chain L-125KK 2 TON 15 FT

3355 CM-electric/chain H005KL 4 TON 16 FT

3623 Yale electric/wire rope 2 TON 20 FT

3629 Electro lift-electric wire rope 42761 3.5 TON 29 FT

3629 Electro lift 42763 3.5 TON 29 FT

3635 Detroit Hoist- electric/wire rope 142650 3.5 TON 62 FT

3635 Acco Wright-electric/wire rope 532-06-3594 2 TON 12.5 FT

3635 Acco Wright-electric/wire rope 532-06-3595 2 TON 12.5 FT

3640 Electro Lift-electric/wire rope 42760 3.5 TON 30 FT

3640 Electro Lift-electric/wire rope 42762 3.5 TON 30 FT

4901 Acco Wright -Electric/Wire 534-20-7552 15 TON 25 FT

5032 Harrington-electric chain 144077 3 TON 43 FT

D’Ville

Bottner Rd.

Manning/Maxwell & Moore- Manual Chain

N/A 5 TON 18 FT