This Performance Work Statement (PWS) outlines the U.S. Navy's Military Sealift Command (MSC) requirements for storage of government-owned Aqueous Film Forming Fluid (AFFF) to support installed foam systems aboard its vessels. The contractor must provide temperature-controlled storage (35-120 degrees Fahrenheit) for up to 211,275 gallons of various AFFF products, including National Foam Universal CG-6% AR-AFFF, National Foam Universal Gold 1%/3% AR-AFFF, National Foam AER-O-Foam XL-3 Fluoroprotein, Ansul Ansulite 3x3 Low Viscosity AR-AFFF, Solberg ARCTIC 3x3% ATC AR-AFFF, and MIL-F-24385 AFFF in 3% and 6% concentrations.

The contractor must handle approximately 3,700 drums, 1,500 pails, and 1 tote of AFFF under a firm-fixed-price contract from March 28, 2025 to March 27, 2026. Key requirements include providing secure indoor storage facilities, maintaining daily temperature logs, submitting quarterly inventory reports, preparing materials for shipment with 12-hour notice, and complying with all hazardous materials handling regulations. The contractor must have equipment to load pallets onto delivery trucks and must accept responsibility for any damage to materials while in storage. The current storage location is Carroll Trucking in Norfolk, VA, and new contractors must provide an estimate to transport materials from this facility to their storage location.

View the file

Other files for this federal contract opportunity

Other files attached to AQUEOUS FILM FOAMING FLUID BULK STORAGE, newest first.
File Type Posted
Q_A.pdf PDF
CDRL_001_GFM Inventory Report_3.11.2024_signed.pdf PDF
25Q2225 AFFF STORAGE CCS.pdf PDF
WD 2015-4341 Rev 12-26-23.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

1 Scope

1.1 Glossary of Terms used in the Statement of Work

1.2 References used in the Statement of Work

1.3 General Requirements

2 Compliance with Hazardous Materials and Waste Handling Regulations

3 Packing and Marking

4 Government Furnished Material (GFM) Storage

4.1 GFM for Storage

4.2 Storage Facility Requirements

4.3 Receipt of GFM

4.4 Handling for Shipment to and from the Storage Area

4.5 Reports

4.6 Transfer of GFM at Contract Phase In/Out

5 Disposal

6 Period of Performance

7 Contracting Officer Representative

1. SCOPE

The U.S. Navy’s Military Sealift Command (MSC) requires the storage of government owned

Aqueous Film Forming Fluid (AFFF) to support installed foam systems aboard its vessels in accordance with all statutory and regulatory requirements.

1.1 Glossary of Terms Used in the Performance Work Statement:

The following definitions apply to the terms used in this Performance Work Statement:

AFFF: Aqueous Film Forming Foam

AR-AFFF: Alcohol Resistant Aqueous Film Forming Foam

Mil-Spec: Military Specification

CONUS: Continental United States

GFM: Government-Furnished Material

COR: Contracting Officer’s Representative

1.2 References used in the Performance Work Statement

Please note that all references are generally available on the World Wide Web.

ASTM-D-3951-98 (2004) "Standard Practice for Commercial Packaging." (as amended)

FED- STD 313 (As amended)

MIL-F-24385 (as amended)

1.3 General Requirements:

MSC requires the lawful CONUS storage of government owned Aqueous Film Forming Fluid

(AFFF), as more fully defined below, to support installed foam systems aboard its vessels.

MSC also requires the packing or preparation for shipment of the AFFF it owns.

2. Compliance with Hazardous Materials and Waste Handling Regulations:

The Contractor shall comply with the Resource Conservation and Recovery Act (RCRA), 42

U.S.C. §§ 6901- 6991i, the Comprehensive Environmental Response, Compensation and

Recovery Act (CERCLA) of 1980, 42 U.S.C. §§ 9601-9675, the Clean Water Act (CWA), 33

U.S.C. §§1251-1387, the Clean Air Act (CAA), 42 U.S.C. §§ 7401-7671, the Federal

Insecticide, Fungicide, and Rodenticide Act, 7 U.S.C. §§ 136-136y, and all other Federal, State, and local laws, codes, ordinances and regulations that govern the handling, transportation, storage, recycling, or disposal of hazardous materials and/or hazardous waste.

As applicable, the Contractor shall also comply with all laws, codes, regulations, and ordinances of foreign states that govern the handling, transportation, storage, recycling, or disposal of hazardous materials and/or hazardous waste.

Offerors shall provide their facility's rcrapublic.epa.gov Site ID.

AFFF disposal must be carried out following the latest DoD or EPA directive. Contractor shall provide proof of disposal via latest DoD or EPA directive to MSC Environmental and

Contracting Officer Representative for record keeping purposes.

In the event that the Contractor is charged with, or cited for, violating any of the authorities set forth in Paragraph 2 while performing under this Contract, the Contractor shall notify the MSC

Contracting Officer within 10 calendar days of the issuance of the charge/citation. This notice shall set forth the facts and circumstances giving rise to the charge/citation. A copy of the citation shall be included with the notice. The Contractor shall be responsible for any and all violations thereof and thereto.

3. Packing and Marking

The Contractor shall prepare all GFM requested for removal from the storage facility under this contract in accordance with ASTM-D-3951-98 (October 4th, 2023) "Standard Practice for

Commercial Packaging." Preservation, packaging, packing, and marking of all deliverable contract line items must ensure the material is received in a serviceable, ready for issue condition when received at the ultimate destination.

The Contractor shall prepare, GFM containers for anticipated shipping as directed by all regulated hazardous material in accordance with the requirements of 49 CFR (Code of Federal

Regulations) or the applicable modal transport regulation. In addition, compliance with FED-

STD 313 (As amended) is mandatory when applicable.

4. GFM Storage

4.1 GFM for Storage:

The government will provide GFM to the contractor for the contractor to store, with GFM being defined as the below AFFF products provided to the contractor by the government:

National Foam Universal CG-6% AR-AFFF

National Foam Universal Gold 1%/3% AR-AFFF

National Foam AER-O-Foam XL-3 Fluoroprotein

Ansul Ansulite 3x3 Low Viscosity AR-AFFF

Solberg ARCTIC™ 3x3% ATC™ AR-AFFF

MIL-F-24385 AFFF, in 3% and 6% concentrations

The maximum quantity for storage is 211,275 gallons. The packaging anticipated distribution for the 211,275 gallons is 3,700 drums, 1,500 pails and 1 tote. The contract structure is Firm

Fixed Price.

4.2 Storage Facility Requirements:

The contractor shall provide storage of all GFM defined in Section 4.1 on Military Sealift Command, Chemical Division Requirements. The GFM shall be provided to the contractor by the government as per the initial GFM Inventory Report that will be provided to the contractor. GFM will be provided in 208-liter (55 gallon) drums, 19-liter (5 gallon) pails, and 1,040-liters (275 gallon) totes.

The contractor’s facility shall be equipped with the equipment necessary to load pallets onto a delivery truck in preparation for shipment.

Storage of the GFM shall be temperature-controlled storage. Temperature controlled storage shall be defined as an indoor storage area in which the temperature is maintained in the range set forth in the GFM Safety Data Sheets, 35-120 degrees Fahrenheit. The GFM will be kept out of direct sunlight. The area shall be segregated from other areas in the same facility.

Storage shall be in compliance with Section 2.

The contractor shall be responsible for the security of the storage area containing this

GFM. Security measures shall prevent unauthorized entry to the storage areas. The COR shall have access to all GFM storage facilities for the duration of the period of this contract, when access to the facility is requested. Access to be granted to the COR or any government personnel specified by the COR within 48 hours of request.

The material shall be stored and handled as to not cause damage to the material, or the material packaging or labeling. Reparations due to the damage to the material, material packaging, or labeling will be at the contractor’s expense at the material’s replacement value.

Labeling damage is defined as labeling damage to the extent where the original manufacturer’s label can no longer be read, and will be determined by the COR. Cleanup of spills of the GFM at the GFM storage facility will be at the cost of the contractor, with handling and cleanup in compliance with Section 2.

Inventory reporting and invoicing for storage is outlined in Section 4.5.

4.3 Receipt of GFM

The contractor shall inspect the GFM at the time of receipt and verify that the material received is the same as that indicated on the GFM Inventory Report received from the government, and in proper condition for use. The contractor shall note, describe, and photograph any physical/visible damage or defects to the equipment/packaging and submit to the COR in the first GFM Inventory Report (CDRL-001) described in Section 4.5. If defects are found, the contractor shall immediately notify the COR of the condition.

4.4 Packing and Handling for Shipment to and from the Storage Area Removal of GFM from the storage area will be as per written notification to the contractor from the government. The government will provide the contractor with 12-hour notice of removal of the GFM, to include the type, amount (i.e. drum/pail) and quantity to be removed.

The contractor shall acknowledge receipt of notification within 12 hours. The contractor shall prepare the GFM specified by the government for shipment and provide the government with details of the prepared shipment, including but not limited to the shipment’s weight and dimensions. The contractor will provide access to the facility and storage area for personnel, hired at the government’s expense, to remove the GFM that has been prepared for shipment.

The government will arrange for and pay for the shipment of the GFM for movements other than the shipment described in Section 4.6.

The contractor’s facility shall be equipped with the equipment necessary to load pallets onto a delivery truck in preparation for shipment, and equipped to load shipments onto the government arranged delivery truck.

The contractor will ensure all material is properly packed as to avoid damage during shipment, and comply with Sections 2 and 3 of this PWS.

The contractor will accept additional GFM to the storage area as requested by the government, for example if a vessel has excess foam concentrate to be removed from the ship and stored in the contractor’s GFM storage area. The contractor will be subsidized accordingly via the GFM Inventory Report (CDRL-001) outlined in Section 4.5.

4.5 Reports

All reports shall be sent to the COR and/or any government personnel designated by the COR.

The GFM Inventory Report (CDRL-001) shall be submitted to the government quarterly. The report shall include the type, size and quantity of the GFM in the contractor’s storage area.

The contractor shall include in the report that the storage facility is in compliance with

Section 4. The report will note, describe and photograph any and all physical/visible damage or defects to the GFM. The report will note the temperature for each business day that the

GFM is stored in the facility, daily temperature to be taken at a time decided by the contractor at generally the same time each day.

The COR will compare the contractor’s report on a quarterly basis with conditions found by the COR onsite, to ensure the requirements of Section 4 are being met. If the COR determines the requirements of Section 4 are not being met and documents the violation(s) in pictures and writing, the COR and Contracting Officer will meet with the contractor to rectify the issue immediately and determine when to continue payment, when the issue is rectified.

Any damage to the GFM, while in the custody of the contractor, shall be reported immediately to the COR. The contractor shall prepare a damage report with pictures outlining the damage, and conditions that led to the damage. If the government determines that observed damage or condition of the GFM is a result of contractor negligence, the contractor will be responsible for expenses associated with resolution. This includes expenses associated with properly disposing of the material and compensating the government with the original purchase cost.

4.6 Transfer of GFM at Contract Phase In/Out

If any subsequent contract is awarded to a vendor different than the vendor currently storing this GFM, arrangements shall be made by the newly awarded vendor to ship the GFM to their facilities for storage. Any offerors for this contract shall provide an estimate to ship the maximum amount of GFM noted in Section 4.1 from the below facility address to the offeror’s storage facility. The contractor currently storing the GFM shall prepare the GFM for shipment according to their contract.

Carroll Trucking

6969 Tidewater Drive

Norfolk, VA 23509

The contractor currently storing the GFM shall document the condition of GFM and submit this report to the government before shipment to justify the contractor shipping the GFM’s liability of damage reported prior to shipment.

4.7 Disposal

The contractor shall be liable for disposal costs associated with spills. Handling and cleanup of spills of the GFM at the GFM storage facility will be in compliance with Section 2.

5.0 Period of Performance

March 28, 2025 to March 27, 2026

6.0 Contracting Officer Representative:

COR: Rebekah O’Donnell: rebekah.a.odonnell3.civ@us.navy.mil

ACOR: Alexis Rimmelin: alexis.j.rimmelin.civ@us.navy.mil