PWS_Liquid Waste.docx

DOCX document 15 MB Posted

Attached to
LPA Liquid Waste Disposal
Solicitation number
W912EF26QA042
Issued by

About this file

This is a Performance Work Statement for liquid waste disposal services at Lucky Peak Dam & Lake, located in Ada and Boise Counties, Idaho, operated by the U.S. Army Corps of Engineers. The contract covers a Base Year (May 1, 2026 through March 31, 2027) plus two optional one-year periods (April 1, 2027 through March 31, 2029). The contractor must provide complete liquid waste removal and disposal from vault-equipped restroom facilities, including CXT Cascadian single and double-vault restrooms with 1,000 to 2,000-gallon capacities, as well as four additional vault candidates on a call-out basis. Services consist of completely emptying sewage holding vaults of sewage, litter, and debris; cleaning and disinfecting all interior surfaces where spillage occurs; and disposing of all removed materials in compliance with applicable County, State, and Federal regulations. The contractor must maintain a 24-hour contact number for call-out requests, which are targeted for completion within four business days and generally occur between April and September. Special provisions apply to remote Deer Flat service, accessible only via a narrow, primitive fire break road, where the use of smaller service vehicles is recommended. Services are not performed on weekends or Federal Holidays.

The contractor must submit an Activity Hazard Analysis, Hazardous Spill Plan, and Safety Exposure Report with each invoice documenting work hours and any work-related injuries or illnesses. All contractor personnel must complete suspicious activity reporting training and E-Verify employment eligibility screening within 30 days of contract award, meet NCIC-III and Terrorist Screening Database vetting requirements for unescorted federal facility access, and comply with Force Protection Condition and Health Protection Condition measures. Required insurance includes General Liability, Automobile Liability, and Worker's Compensation coverage. Performance standards mandate that 95 percent of vault services conform to specifications, with 100 percent random visual inspections conducted by the Government. The contractor is responsible for all equipment maintenance, employee training, safety compliance per EM 385-1-1 and OSHA standards, restoration of any damaged Government facilities, and locating approved waste disposal sites at their own expense. Invoices submitted in arrears must be verified by the Contracting Officer's Representative before payment authorization, and submission of both the invoice and Safety Exposure Report within 10 days is a performance requirement with a 95 percent acceptable quality level threshold.

View the file

Other files

File Type Posted
Solicitation - W912EF26QA042.pdf PDF
Service Contract Act WD 2015-5503.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT FOR

LIQUID WASTE DISPOSAL AT

LUCKY PEAK DAM AND LAKE

1. GENERAL INFORMATION: This BASE YEAR + TWO OPTION YEARS Service Contract provides liquid waste removal of vehicle accessible vault-equipped facilities at various locations at the U.S. Army Corps of Engineers Lucky Peak Dam & Lake boundary, within Ada and Boise Counties, ID. The Contractor will be responsible for all costs and licensures related to performing this contract and its successful completion. Appendix A provides reference maps of all vault sites subject to service under this contract.

Vault restrooms at Lucky Peak Lake are comprised of CXT Cascadian model single and double-vault restroom variations. These concrete structures have either one or two 1,000-gallon capacity vaults accessible through either the interior toilet riser or exterior service hatch(es). A single vault restroom is one structure with one toilet and one 1,000-gallon vault. A double vault restroom is one structure with two toilets and two independent 1,000-gallon vaults. Left-hand and right-hand configurations of the single vault restroom exist at Lucky Peak but this difference in configuration is of no consequence to liquid waste services. See Figures 1 through 4 for Elevation and Plan views of the structures.

In addition to the CXT Cascadian vault restroom models discussed above, there are four other vault candidates for services under this contract.

a) There are two 1,200-gallon vaults used by Volunteer Park Hosts at Barclay Bay and Macks Creek Park. They are black water holding vaults and will never - with rare exception – contain litter and debris materials requiring manual removal. These vaults will be included on a Call-Out basis.

b) There is one 1,200-gallon black water holding vault located at Spring Shores Marina and may be used by the Project as a transfer location for liquid waste removed from lakeside restrooms. This vault will never – with rare exception – contain litter and debris materials requiring manual removal. This vault will be serviced on a Call-Out basis only.

c) There is one septic system vault located at the Lake Office. This vault will never – with rare exception – contain litter and debris materials requiring manual removal. This vault will be serviced on a Call-Out basis only.

2. WORK TO BE PERFORMED: The Contractor will provide all labor, credentials, certifications, insurance, equipment, materials, supplies, transportation and supervision necessary to perform all liquid waste disposal service at Lucky Peak Dam & Lake. Service consists of completely emptying sewage holding vaults of sewage, litter and debris. Services will not be performed on weekends or Federal Holidays. All interior surfaces on which spillage occurs during the pumping procedure will be cleaned and disinfected. Litter and debris manually removed incidental to services will be disposed of by the contractor in accordance with appropriate and applicable County, State, and Federal hazardous materials regulations.

The following drawings show information on CXT’s that need pumped and cleaned.

Figure 1 Single Vault Restroom Elevation View

Figure 2 Single Vault Plan View

Figure 3 Double Vault Elevation View

Figure 4 Double Vault Plan View

3. DEER FLAT SERVICE: This single service consists of emptying two CXT Cascadian single-vault toilets at Deer Flat, described in the table below. These locations are remote, approximately 1.5 miles from Highway 21 via a narrow primitive fire break and service road. The roadway is unimproved, steep, and loose in many areas, with limited turnaround opportunities. Use of smaller service vehicles with truck-mounted or trailer-mounted pump/haul apparatus is highly recommended. Deer Flat Service, if requested, is generally targeted for August or September. Vaults need not be recharged with water following service, as this will be accomplished by Project staff during subsequent quality assurance inspections. Litter and debris removed incidental to services will be disposed of by the contractor in accordance with appropriate and applicable County, State, and Federal hazardous materials regulations. Access to the site is sensitive to precipitation and soil moisture; service days scheduled in advance may be postponed or cancelled due to hazardous road conditions, potential for road damage, and Contractor safety considerations. Line Item X002 is an Estimated Quantity Line Item. Quantities are estimated amounts and are not guaranteed amounts. The contractor will only be paid for actual work performed. These vaults will be serviced on a Call-Out basis only.

Site to be Serviced
Vaults
Capacity When Full
1
Deer Flat 1 CXT Cascadian
Single
1,000
2
Deer Flat 2 CXT Cascadian
Single
1,000

4. CALL-OUT SERVICES: Call-Out services will be quoted as JOB with the unit of measure as EACH VAULT. Many vaults experience above average use and require service in excess of once annually. Service is generally requested for CXT Cascadian sites when vaults exceed roughly 2/3 capacity. Service is generally requested for Volunteer Park Host and Vessel Pump-Out sites when vaults exceed roughly 80% capacity. Services for these facilities will be delivered on an as-needed basis within four business days of request by the Contracting Officer Representative. Call-out requests are most expected between April and September but may be requested at any time throughout the contract period. Vaults need not be recharged with water following service, as this will be accomplished by Project staff during subsequent quality assurance inspections. Litter and debris removed incidental to services will be disposed of by the contractor in accordance with appropriate and applicable County, State, and Federal hazardous materials regulations. X003 Line Items are Estimated Quantity Line Items. Quantities are estimated amounts and are not guaranteed amounts. The contractor will only be paid for actual work performed. At no time will the contractor exceed the total estimated quantities. Candidate restrooms and vaults for Call-Out service are provided in the following table:

Site to be Serviced
Vaults
Capacity When Full
1
Barclay Bay Park Host Vault
Single
1,200
2
Barclay Bay Ramp CXT Cascadian
Single
1,000
3
Barclay Bay Swim Area CXT Cascadian
Single
1,000
4
Barclay Bay Parking CXT Cascadian
Double
2,000
5
Five Mile Flat CXT Cascadian
Single
1,000
6
Foote Park CXT Cascadian
Single
1,000
7
Foote House CXT Cascadian
Single
1,000
8
Lydle Gulch Trailhead CXT Cascadian
Single
1,000
9
Lydle Gulch Cattle Guard CXT Cascadian
Single
1,000
10
Macks Creek Lower CXT Cascadian
Double
2,000
11
Macks Creek Upper CXT Cascadian
Single
1,000
12
Macks Creek Park Host Vault
Single
1,200
13
Middle Lower CXT Cascadian
Single
1,000
14
Middle Upper CXT Cascadian
Single
1,000
15
Mores Creek CXT Cascadian
Single
1,000
16
Robie Creek Beach CXT Cascadian
Double
2,000
17
Robie Creek Group CXT Cascadian
Single
1,000
18
Robie Creek Ramp CXT Cascadian
Single
1,000
19
Turner Parking CXT Cascadian
Single
1,200
20
Turner Ramp CXT Cascadian
Single
1,000
21
Viewpoint CXT Cascadian
Single
1,000
22
Barclay Bay Park Host Vault
Double
2,000

5. LAKE OFFICE SEPTIC VAULT SERVICE: The Contractor shall provide service to the Lake Office septic vault on a call out basis. The Government will unearth and expose the cover of the vault prior to service. The Contractor shall be responsible for removing liquid and accumulated sediments from the vault. The Government will seal the vault following service.

6. PERIOD OF PERFORMANCE: This contract consists of a Base Year and TWO Option Years. The Government may elect to exercise each Option Year.

a) Base Year (CLIN 000#) will be from 1 May 2026 through 31 March 2027.

b) Option Year 1 (CLIN 100#) will be from 1 April 2027 through 31 March 2028.

c) Option Year 2 (CLIN 200#) will be from 1 April 2028 through 31 March 2029.

7. CONTRACTOR QUALITY CONTROL PROGRAM: The Quality Control Program (QCR) is the means by which the Contractor assures himself and the Contracting Officer Representative that adequate inspections of work performance are being conducted so that all work meets contract specifications. The Contractor’s Quality Control Program should be established and maintained for all services included in the contract and should include the surveillance required to meet all contract specifications regarding schedule compliance, proper equipment, materials, and work performance. The Contractor should be responsible for controlling work quality through an effective quality control program involving management, training, and sufficient inspections of all work items to ensure compliance with all contract requirements.

Quality Control Representative Designation: The Contractor should submit to the Contracting Officer Representative, in writing, the name(s) of the QCR(s) at the Post-Award Orientation Conference. All subsequent changes in such designation should be submitted to the Contracting Officer Representative, in writing, prior to the effective date of the change. It should be the Contractor’s responsibility to train each QCR so that they are thoroughly familiar with the contract specifications, safety procedures, and their administrative duties.

8. GOVERNMENT QUALITY ASSURANCE: The CORPS has the right to inspect and test all services called for by the contract, to the extent practicable always and places during the terms of the contract. Inspections should consist of quality control reports/log sheet review and random observations to provide the basis for final acceptance of contract work. The Contractor should perform such additional inspections of materials, procedures, equipment, and completed work as considered necessary by the Contracting Officer Representative to ensure contract compliance. Deficiencies: If recurring deficiencies in an item or items indicate that the Quality Control Program is not adequate, corrective actions should be taken as directed by the Contracting Officer Representative. When the defects in services cannot be corrected by reperformance, the CORPS may require the Contractor to reduce the contract price. If the Contractor fails to take necessary action to ensure future performance in conformity with contract requirements, the CORPS Contracting Officer may terminate the contract for default.

9. ANTI TERROIST/OPERATION SECURITY (AT/OPSEC)

11.1 Suspicious Activity Reporting Training. The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.

11.2 Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

10. PERFORMANCE SUMMARY REVIEW:

Performance Requirements Summary Acceptable Quality Level (AQL) for each of these objectives is 95%

PERFORMANCE OBJECTIVES
PWS

Para.

PERFORMANCE THRESHOLD
METHOD OF SURVEILLANCE
Service consists of completely emptying sewage holding vaults of sewage, litter and debris.
Section 2
95% of vault services shall conform to requirements.
100% Random Visual Inspection.
All interior surfaces on which spillage occurs during the pumping procedure will be cleaned and disinfected.
Section 2
95% of vault services shall conform to requirements.
100% Random Visual Inspection.
All litter removed incidental to services will be disposed of by the Contractor at approved locations and in accordance with all applicable State, County and Federal regulations.
Section 2
95% of vault services shall conform to requirements
100% Random Visual Inspection

12.1. SURVEILLANCE: Surveillance will be accomplished using the following Performance Criteria Analysis. If performance in not satisfactory to the percentage listed in the AQL, the COR will notify the contractor’s site manager, with a telephone call, as soon as practicable and ask the contractor to correct the problem.

If a safety issue arises from the Contractor’s unacceptable performance, the Contractor will be given notification and 4 hours to correct the unacceptable performance. The COR may approve additional time if needed. If it is not a safety issue the contractor will have three days to correct any deficiencies. The COR will notate on the Performance Criteria Analysis the date, time, and location of the deficiency and send a copy to the Contractor to sign and return to the COR within 3 businesses days.

11. PRE-WORK MEETING: The Contractor will meet with the Contracting Officer Representative at least five days prior to commencement of work to discuss contract requirements and provide proof of meeting the following requirements: (1) General park orientation; (2) Valid Idaho Driver’s License; (3) General Liability Insurance; (4) Automobile Liability Insurance; (5) Worker’s Compensation Insurance (if you have employees); (6) Submittal of required licenses and/or administrative materials; (7) Safety and first-aid responsibilities; (8) Contract scope of work and compliance; (9) Acceptable performance standards; and (10) Billing procedures.

12. CALL-OUT NUMBER: The Contractor will maintain a telephone number(s) and means of contact 24 hours a day, every day. The contact will be a person, answering service or machine. Once the Corps has notified this contact, the Contractor will be considered officially notified when called for problems or other work-related items.

13. KEYS: The Contractor will be responsible for all keys issued. Keys are for the exclusive use of the Contractor and authorized employees while performing the specified services and will be returned to the Lake Office within 48 hours of the completion of services. The Contractor will be liable for any costs involved in changing locks due to lost keys. Key loss will be reported immediately.

14. EQUIPMENT: Employees will utilize necessary safety equipment which may include but not be limited to safety shoes, safety glasses, face shields, hard hats, hearing protection, work gloves and/or other additional personal safety equipment required for specific work duties. Vehicle use will be restricted to pavement, dirt, or gravel roadways. Off-road operation of Contractor vehicles will be prohibited unless provided specific exception by the Contracting Officer Representative. The equipment used by the Contractor for the specified service will be in satisfactory operating condition and will be maintained in this condition. The Government reserves the right to require the Contractor to discontinue the use of unsatisfactory equipment and to require that such equipment be replaced with acceptable equipment to maintain contract compliance. The decision of the Contracting Officer as to serviceability of the equipment will be final. Equipment will meet current Federal, State and local safety requirements and all applicable requirements of the Corps of Engineers Safety Manual, EM 385-1-1.

15. PROTECTION OF GOVERNMENT FACILITIES: The Contractor will be responsible for restoring any Government facilities or property damaged as a result of Contractor's operations, including natural features. Reasonable care will be used to avoid damage to existing structures, equipment, facilities, and vegetation in the areas serviced. Any damage will be repaired, or the items replaced at no cost to the Government. If the Contractor will not make such repair or replacement, the cost thereof will be deducted from normal contract payments.

16. DISPOSAL: The disposal of waste materials will be done at approved locations and in accordance with all applicable State and County regulations. The Contractor will be responsible for locating a legal dump site for all waste material. No waste of any kind will be discharged on Government property.

17. ABILITY TO PERFORM: The Contractor will have sufficient equipment and labor to perform services prescribed. If for any reason the Contractor will be unable to perform any service as scheduled, the Contracting Officer Representative will be notified in advance.

18. SERVICE & PAYMENTS: Invoices will be submitted in arrears to USACE Lucky Peak Lake, 9723 E Highway 21, Boise ID 83716. Invoices will be verified by the Contracting Officer’s Representative before payment can be authorized.

19. SAFETY EXPOSURE REPORT: The Contractor will submit a Safety Exposure Report to the Park Manager with each invoice documenting work-hours accrued, work-related injuries, illnesses and fatalities sustained by Contractor employees while providing services at Lucky Peak Dam & Lake over the invoice period. Failure to submit a Safety Exposure Report with the invoice will delay payment for services performed.

20. ACTIVITY HAZARD ANALYSIS: The Contractor will submit an Activity Hazard Analysis on all phases of the work to be performed prior to the start of service. A sample format can found in EM 385-1-1 via web link at https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/.

21. INSURANCE: A submittal showing a certificate of liability insurance will be submitted to the Contracting Officer Representative prior to the commencement of work.

22. HEALTH CODES: The Contractor will comply with all pertinent provisions of the Corps of Engineers Manual, EM 385-1-1, Safety and Health Requirement Manual, the Idaho State Health Code, OSHA, and Ada and Boise County Codes.

23. SPILL PLAN: The Contractor will submit a Hazardous Spill Plan prior to the start of service. The plan will describe the actions which the Contractor will take in case of a hazardous spill, including a description of the following: type and volume of material which could potentially spill, spill containment materials and equipment, containment methods, reporting procedures (will include Lucky Peak Dam & Lake), and disposal arrangements. Employees of the Contractor will be familiar with the procedures outlined in the spill plan.

24. HAZARDOUS SPILL NOTIFICATION: The Contractor will immediately notify the Park Office of any hazardous materials spills which occur on Government property. The Contractor will also notify appropriate local and state agencies as required and arrange for the spill clean-up. Any cost incurred during cleanup is the Contractor's responsibility.

25. UNSAFE CONDITIONS: Work will be halted by the Contracting Officer or his representative if an unsafe condition exists or will develop if work continues. The Contractor will have no basis for compensation should such a work stoppage cost the Contractor damages. Work will not resume until the condition is corrected.

26. GENERAL SECURITY REQUIREMENTS AND GUIDANCE: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

27. PHYSICAL SECURITY AND ACCESS CONTROL REQUIREMENTS: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

28. ESCORTING IN CLASSIFIED AND/OR SENSITIVE AREAS: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

TECHNICAL EXHIBIT 1 – Performance Requirements Summary

The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard

AQL

SURVEILLANCE METHOD

Vault Services Services are performed in accordance with specifications (emptied of all sewage, litter, debris)

95%

100% Inspection

Invoices and Safety Exposure Reports
Submittal of both Invoice and Safety Exposure Report occur within 10 days of services
95%
100% Inspection
Responsiveness to Call-outs
Contractor will provide requested call out service by end of fourth business day following request.
95%
100% Inspection

APPENDIX A – Maps image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image1.jpeg image2.jpeg image3.jpeg