Performance Work Statement Summary: KC-135 Fan Cowlings and Inlet Cowling Repair/Overhaul

This is a Performance Work Statement (PWS) Revision 2 for the repair and overhaul of KC-135 aircraft fan cowlings and inlet cowlings under Air Force contract FD2030-24-01886. The contract involves three end items: left-hand fan cowl (NSN 1560-01-148-4262FL, part number 65C18604-507/607), right-hand fan cowl (NSN 1560-01-148-4263FL, part number 65C18604-646/608), and inlet cowl (NSN 1560-01-149-6602FL, part number 65C18554-772/604). The contractor is responsible for complete disassembly, cleaning, inspection, maintenance, reassembly, testing, and finishing to return items to serviceable condition in accordance with applicable technical orders and repair procedures. All work must meet aerodynamic smoothness requirements, and repairs must be permanent with positive margins of safety relative to original design loads. The contractor must furnish all materials, support equipment, and tools except for government-provided end items.

The PWS specifies firm fixed-price requirements for basic repair and overhaul tasks, with additional work submitted as over-and-above. Performance thresholds require 100 percent delivery of defect-free serviceable items meeting schedule requirements, 100 percent inspection of government property, and response to information requests within specified timeframes (emergency: 2 business days; urgent: 5 business days; routine: 10 business days). The contractor must establish quality systems, counterfeit prevention plans, parts control programs, and supply chain risk management procedures compliant with SAE and DoD standards. The contract includes requirements for Item Unique Identification (IUID) marking, government property management, deficiency reporting, surge capacity planning, and comprehensive documentation through Contract Data Requirements Lists. Quality acceptance will be performed by DCMA at the repair site, with delivery to be made by commercial bill of lading following notification to the supply planner.

View the file

Other files

File Type Posted
RFP FA8119-24-R-0014-0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

PERFORMANCE WORK STATEMENT

(PWS)

For

REPAIR/OVERHAUL OF KC-135 FAN COWLINGS AND INLET

COWLING

NSN:

1560-01-148-4262FL

1560-01-148-4263FL

1560-01-149-6602FL

FD2030-24-01886

PREPARATION DATE:

2 March 2026

REVISION: Revision 2

PREPARING ORGANIZATION: AFSC/448 SCMW/848 SCMG/424 SCMS TINKER AFB OK 73145

REVISION SHEET

Below are listed the changes made from the original PWS

Date Page Paragraph Description 5/21/25 10 1.3.14.2.b. Updated replacement panel part numbers 3/2/26 9 1.3.13.2. Removed • 65C18563-613 (1560-01-153-7927) from list of parts

Table of Contents

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.1. Purpose

1.2. General Information

1.3. Work Requirements

1.4. Reporting Requirements

1.5. Quality Program and Inspection System Requirements

1.6. Condemnation Candidates/End items beyond economical repair

1.7. Special Tools (ST) and Support Equipment (SE)

1.8. Parts Control Program

1.9. Counterfeit Prevention Plan

1.10. Engineering Support

1.11. Cannibalization of Parts (Module Swap)

1.12. Ozone Depleting Substances (ODS)

1.13. Delivery Schedule

1.14. Customer Service Requirements

1.15. Safety and Health

1.16. Manpower Reporting Language for Contract Performance Work Statements

1.17. Surge……………………………………………………………………………………………………………………………….. 21

1.18. Supply Chain Risk Management (SCRM)………………………………………………………………………..22

2. SERVICE SUMMARY

2.1. Service Summary

3. GOVERNMENT PROPERTY

3.1. Government Property

3.2. Disposition of Government Property

3.3. Discrepancies Incident to Shipment:

3.4. Other

ATTACHMENT A – END ITEMS

ATTACHMENT B – DEFINITIONS

ATTACHMENT C – APPLICABLE DOCUMENTS

1. DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.1. Purpose

1.1.1. The purpose of the Performance Work Statement (PWS) is to define the repair and overhaul requirements for the KC-135 inlet and fan cowling specified in Attachment A of the PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, testing and finishing actions required to return the items to a serviceable condition. The contractor is responsible for having the repair capabilities to include appropriate technical data, repair documents, and license agreements, required to accomplish this repair. The Contractor is responsible for the scheduled delivery of a quality product.

1.2. General Information

1.2.1. Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.3. Work Requirements

1.3.1. The Contractor shall perform repair of the items specified in Attachment A of this PWS. The work encompasses the disassembly, cleaning, inspection, maintenance, reassembly, testing and finishing actions required to return the items to a serviceable condition. The work shall be accomplished IAW the Contractor’s latest repair instructions and specific work requirements in paragraph 1.3.12 through 1.3.14. In the event that a situation develops where the instructions conflict with the pertinent manual, this PWS shall take precedence. Return unit to a serviceable condition.

1.3.2. The Contractor shall replace any component parts that do not meet specified inspection requirements, or if there is any doubt as to its serviceability or longevity. Parts required to meet the requirements of 1.3.12 through 1.3.14 shall be part of the firm fixed price. Parts outside of these routine requirements may be submitted as over and above. This includes any part requiring replacement due to catastrophic failure, fatigue failure, or deterioration. The Contractor is advised to include the cost of replacing a percentage of each recoverable part in their repair cost proposal.

1.3.2.1. If the Contractor is not a Government Engineer approved source of repair for a recoverable part, this part shall be replaced with a new part per paragraph 1.8 or repaired by a Government Engineer approved source. The Contractor may propose their repair procedure along with substantiating documents for evaluation and possible approval for repair of the recoverable part. The Contractor shall submit the request for evaluation to the cognizant engineering office through the PCO for approval. The Government will not be responsible for any costs associated with development of any repair procedures unless it has been negotiated and approved by the PCO.

1.3.2.2. Identification of missing and/or externally damaged components must be revealed within five (5) business days after the asset is removed from the shipping container and reported to the PCO through the ACO in the form of a Discrepancy Report. Failure of the Contractor to identify missing and/or externally damaged components within five (5) business days may result in failure of the missing/damaged components to be covered under over and above.

1.3.3. Over and above work means work discovered during the course of performing overhaul, maintenance, and repair efforts that is—

(i) Within the general scope of the contract.

(ii) Not covered by the line item(s) for the basic work under the contract; and

(iii) Necessary in order to satisfactorily complete the contract.

Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request in accordance with the agreed-to procedure.

The Contractor and Administrative Contracting Officer shall mutually agree to procedures for Government administration and Contractor performance of over and above work requests. If the parties cannot agree upon the procedures, the Administrative Contracting Officer has the unilateral right to direct the over and above work procedures to be followed. These procedures shall, as a minimum, cover—

The format, content, and submission of work requests by the Contractor. Work requests shall contain data on the type of discrepancy disclosed, the specific location of the discrepancy, and the estimated labor hours and material required to correct the discrepancy. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the Contracting Officer to perform the proposed work; Government review, verification, and authorization of the work and Proposal pricing, submission, negotiation, and definitization.

The Government will review the work request and provide a response to the contractor within 15 calendar days if the over and above work request is approved by the Government. Approved work requests will result in contract modifications to definitize all over and above work.

Failure to agree on the price of over and above work shall be a dispute within the meaning of the Disputes clause of this contract.

1.3.4. For data provided through Contract Data Requirements List (CDRLs), see paragraph 1.4.1 for type and schedule requirements.

1.3.5. All parts replacement shall be in accordance with the parts control program

(paragraph 1.8) of this PWS. If additional funding is required, the contractor shall make that request through the ACO and PCO. Being the sole supplier, the contractor shall consider life of weapon system needs and shall work with the government in anticipation of future requirements.

1.3.6. The contractor shall provide all routine and preventative maintenance, repair, and necessary calibration of all STE as a part of the funded effort included in this PWS. The contractor must provide quote and receive approval from PCO before moving forward with unscheduled/uncommon/non-routine maintenance, repairs, and calibration.

-Data Item Description (DID): DI-QCIC80798C

-DID: DI-MGMT-81634C

1.3.7. Material that has a lead time that is greater than 6 months. Material that will be in place to reduce lead time for units ordered. Material Lay in shall be considered as contractor- acquired property under this contract.

- DID: DI-MGMT-81634C

1.3.8. End Item Identification and Marking:

1.3.8.1. Permanently and legibly mark each repaired end item with the

Contractor's identification. This identification shall include the Contractor's CAGE and the date of repair. The identification shall be permanently affixed to the end item by stamp, stencil, or similar means.

1.3.8.2. Item Unique Identification (IUID) will be added to the end item in accordance with the following:

a. Specification requirements for IUID marking will be contained in the Technical Order (TO) 00-25-260, approved engineering drawing, or a Government provided Engineering Order (EO) (AF Forms 3925, 3926 and 3927) as applicable.

b. IUID markings are required for the end-item only. IUID for subcomponents is only required if specifically identified in the TO 00-25-260, approved engineering drawing, or a Government provided EO.

c. For items that do not have IUID marking specifications as stated in paragraph b., the Contractor shall develop the marking specifications in accordance with the current revision of MIL-STD-

130. Location and marking method shall be determined by the contractor.

d. IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Verify 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the Contractor shall replace the IUID mark.

e. The Contractor shall submit the required and applicable contingent data for Legacy items to the IUID Registry per the data submission procedures at https://dodprocurementtoolbox.com/site-pages/overview-data-submission

f. The Contractor shall submit IUID data for new manufactured items that require IUID based on the DFARS clause 252.211-7003, Item Identification and Valuation, as prescribed in DFARS Subpart 211.274.

1.3.9. Quality Acceptance and Processing:

1.3.9.1. The Contractor shall support quality acceptance inspections of each end item IAW DCMA’s latest approved procedure. Quality acceptance will be performed by DCMA at the repair site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package.

1.3.9.2. Each end item identified as serviceable shall be delivered to the

Government defect free.

1.3.9.3. Following quality acceptance by the DCMA, the Contractor shall notify the Supply Planner via email or fax of the completion of repaired end-items. The Supply Planner will provide ship-to addresses/instructions to the Contractor via email or fax for each item produced. Within one business day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the Supply Planner. The Receiving Report shall include the carrier and tracking number.

1.3.10. Shipping Documentation:

1.3.10.1. The Contractor shall insure that the appropriate tag is attached to each serviceable end-item generated.

a. Tested OK (Serviceable) tag is DD Form 1574/1574-1 (or contractor equivalent) (Yellow).

b. Unserviceable (repairable) tag is DD Form 1577-2/1577-3 (or contractor equivalent) (Green).

c. Unserviceable (condemned) tag is DD Form 1577/1577-1 (or contractor equivalent) (Red).

d. Suspended tags/ labels are DD 1575/1575-1 (Brown)

1.3.10.2. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by routine shipping. The Contractor has the discretion to use carriers such as UPS, FedEx, or equivalent.

1.3.11. Mission Essential Contractor Services:

1.3.11.1. The contractor shall prepare for the continuation of essential DoD services during crisis IAW DFARS 252.237-7023. The contractor shall establish and provide a written plan to ensure continued support during a crisis IAW DFARS 252.237-7023.

1.3.12. Specific Work Requirements:

1.3.12.1. All tasks accomplished IAW paragraphs 1.3.12 through 1.3.14, unless otherwise noted, shall be included in the basic price of the end item overhaul. For those parts and tasks that are not replaced/required 100% but have had a history of usage, the Contractor shall have a plan to have the material and resources available to meet schedule requirements.

1.3.12.2. Teardown and Analysis

a. The Contractor shall clean and disassemble end item IAW technical order and drawing requirements.

b. The Contractor shall strip exterior topcoat and primer (areas covered in gray polyurethane). Any parts being replaced do not require stripping.

1. Mask exterior surfaces per T.O. 1-1-8, Chapter 3 to prevent intrusion of chemical into passageways to interior structure via unsealed gaps. Ensure masking is sufficient to prevent contact with internal honeycomb sandwich structure, associated adhesives, and acoustic paneling.

2. Mask or otherwise enclose all openly exposed surfaces such as the interior surfaces of the cowlings.

3. (Inlet Cowling Only) Mask inlet cowl leading edge skins to prevent damage to the Dexter 4002 coating. If coating is damaged strip and reapply per T.O. 1-1-8, Chapter 2 and T.O. 1C-135-3-1, Chapter 2.

4. Chemically remove all exterior paint, primer and coating per T.O. 1-

1-8, Chapter 2 and T.O. 1C-135-3-1, Chapter 2.

5. Feather edge any paint remaining after stripping as a result of masking per T.O. 1-1-8, Chapter 3.

6. Starting no later than 48 hours and finishing within 72 hours after removal of paint and primer, inspect steel fasteners for rust and inspect adjacent areas for corrosion. Any steel fastener which is free from moderate or severe corrosion, and which does not have corrosion visible on adjacent surfaces shall be spot painted using MIL-PRF-23377 epoxy primer. When applying coatings via spray application, minimize overspray and apply the thinnest coating that will cover the fasteners to prevent corrosion.

c. The Contractor shall perform all visual and other non-destructive inspections IAW TO 16W37-29-3 Chapter 5. All bonded components shall be inspected for delamination unless being replaced.

d. The Contractor shall perform detailed visual inspection IAW 1C-135-

36 of the following features and items for damage, cracks, nicks, gouges, and other potential crack initiation points to:

Latches Fastener and fastener holes Hinges Skins and skin panel assemblies Frames Seals Rub strips Bushings Bearings Aerodynamic smoothness IAW T.O. 1C-135-3-1, Chapter 1, Section III and 1C-135-3-4, Chapter 1, Section 1.

e. The Contractor shall replace basic wear items and consumables such as seals, rub strips, bushings, bearings and fasteners with any signs of damage or wear.

f. The Contractor shall inspect end items for corrosion and damage to surfaces finishes per TO 1C-135-3-4, Chapter I, Section IV.

g. The Contractor shall inspect existing repairs to end items for serviceability. The Contractor shall retain serviceable repairs unless specifically not authorized for retention elsewhere within this PWS.

h. The Contractor shall document all non-conformances and submit a

Repairable Item Inspection Report (RIIR) (DI-PSSS-80386/T, CDRL A- E014) to the PCO and 424 SCMS/GUEA Engineering via email.

1.3.12.3. The Contractor shall use the Boeing material review board process to determine the repair or replacement of all items that exceed the technical order allowable limits and validate the long-term serviceability of the repairs. All repairs developed shall be permanent, meet aerodynamic smoothness requirements, require no follow-on inspection and restore component capability with a positive margin-of-safety in relation to the original design loads. All repairs accomplished outside of technical order requirements shall be submitted to 424 SCMS/GUEA engineering and approved prior to implementation as part of the RIIR. Repair submissions shall include any sketches, material lists and process instructions required to accomplish proposed repairs.

1.3.12.4. When using T.O. 1C-135-3-4, Figure 3-29, Detail I, multiple repairs on the same panel shall also be no closer than three times the diameter of the largest hole when measured from the center of the largest hole to the edge of the other hole. When use of this repair exceeds these limits, an engineered bonded repair shall be developed to correct the defects.

1.3.12.5. The non-flush repair per T.O. 1C-135-3-4, Figure 3-29, Detail II shall not be used.

1.3.12.6. Repair of damaged insulative coating per T.O. 1C-135-3-1, Figure 2-9 using Dapco 2100 or Dapco 2200 is not permitted.

1.3.12.7. The Contractor shall restore all surface finishes and reassemble IAW technical order and drawing requirements. Interior and exterior finishes shall be per T.O. 1C-135-3-1, Figure 2-7 (F108-CF-100 Nacelle and Strut Finishes). Parts not specifically addressed by the technical order shall be finished per the manufacturing drawing requirements.

1.3.12.8. All replacement parts manufactured for repair shall be made in accordance with the original drawing requirements. No material substitutions are authorized without approval of 424 SCMS/GUEA engineering.

1.3.12.9. The Contractor shall have the right to interchange new and reworked components in order to meet contract delivery performance as long as reliability is not impacted as determined by 424 SCMS/GUEA.

1.3.13. Inlet Cowling (65C18554-604/-772) Repair and Overhaul.

65C18554-604 inlet cowling is identified on the drawing and in the 1C-135-4-2 as an alternate assembly used on the KC-135R/T model aircraft. Data does not show a specific aircraft effectivity for this part number. Repair history has identified no -604 assemblies, however, there is a potential for a limited number to be overhauled under this effort. Replacement of parts on the -604 that are not common to the -772 assembly (in particular the 65C18562-601 acoustic panel installation) shall be handled as over and above.

Inlet cowling will be divided into two categories: repair and overhaul. Repair is intended as a temporary effort until overhaul is part supportable or if the cowling has been previously overhauled under this effort. The basic requirements will be the same for both effort but when implemented the overhaul will require replacement of all bonded panels.

1.3.13.1. The following overhaul tasks are considered basic to the requirements of this effort and shall be firm fixed price.

a. Tasks accomplished per section 1.3.12.

b. All repairs accomplished in accordance with T.O. 1C-135-3-1 and 1C-

135-3-4.

c. All engineered repairs developed to repair honeycomb core, skins and doublers of the inlet cowl bonded panel assemblies.

d. Replacement of improper blind rivets used in the attachment of the leading-edge skins.

e. Repair of leading-edge skins per T.O. 1C-135-3-4 (e.g. bump out of dents or doubler repairs).

f. Visually inspect part number 65C18554-737 (Tee Angle) for cracks.

Replace if cracked.

g. Repairs to acoustic panels will be limited to 50% of the allowable lost area by the T.O. to permit future repair. No more than 50% of the available negligible damage limits will be allowed in repair of the end item. When damage exceeds these limits, the part must be permanently repaired or replaced.

h. The Contractor shall replace exterior skin panels with large amounts of hail damage. Large is defined as repair exceeding 10% of the panel size or having more than 20 dents exceeding .030” in depth.

1.3.13.2. Overhaul. Accomplish all the requirements of 1.3.13.1 excluding bonded panel repairs. The parts listed in below shall be replaced 100% unless in lieu of bonded panel repair unless replaced under a previous repair effort.

65C18554-754 (1560-01-171-3040) 65C18554-755 (1560-01-171-3041) 65C18554-756 (1560-01-171-3042) 65C18560-601 (1560-01-171-0907) 65C18560-602 (1560-01-171-0908) 65C18560-604 (1560-01-171-2668) 65C18562-649 (1560-01-171-0909) (For use on 65C18554-772) 65C18562-650 (1560-01-150-9011) (For use on 65C18554-772) 65C18562-651 (1560-01-150-9012) (For use on 65C18554-772)

1.3.13.3. Document replacement of bonded panels with the part number and date of replacement in the following format: “P/N ###-#####-### REPLACED MM/YY” using a modification identification plate per MIL- DTL-15024/4A, Type G or equivalent. Install plate adjacent to the IUID tag. Edge seal and overcoat label with Humiseal 1A20 per MIL-I-46058, type UR or MIL-PRF-85285 clear polyurethane per BAC5305.

1.3.13.4. Over and Above. The following repairs will be submitted as over and above:

1. Replacement of leading-edge skins, part numbers:

65C18554-710 (1560-01-183-5138) 65C18554-711 (1560-01-183-5139) 65C18554-712 (1560-01-183-5140) 65C18554-612 (1560-01-182-5907)

2. Leading edge support structure and anti-ice ring damaged as the result of impact to the leading-edge.

3. Replacement of the parts listed in paragraph 1.3.13.3 under repair CLIN of the contract should be submitted as O&A if cowling is inducted under a repair effort. Installation is permitted and preferred in lieu of to repair if the part is available.

1.3.14. Fan Cowl (65C18604-507/-607/-608/-646) Repair and Overhaul.

1.3.14.1. The following repair tasks are considered basic to the requirements of this effort and shall be firm fixed price.

b. All repairs accomplished in accordance with T.O. 1C-135-3-1 and 1C-

135-3-4.

c. All engineered repairs developed to repair honeycomb core, skins and doublers of the 65C18605-* bonded panel assemblies.

1.3.14.2. Fan cowl overhaul shall constitute the following:

b. 100% replacement of the bonded assembly with new 65C18605-51 or-52 bonded assembly.

1.3.14.3. The Contractor shall plan for and have available to meet contract schedule the following spare parts. Replacement of these items shall be submitted as Over and Above.

65C20601-501 (1560-01-210-5115) 65C20601-502 (1560-01-210-5116) 65C20601-503 (1560-01-165-6036) 65C20601-504 (1560-01-210-5117) 65C20613-1 (1560-01-167-0850) 65C18619-604 (1560-01-164-4831) 65C18619-605 (1560-01-165-6035) 65C18619-606 (1560-01-164-4832) 65C18619-607 (1560-01-164-4833)

1.4. Reporting Requirements

1.4.1. Data requirements are specified below and in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule of the Basic contract.

1.4.2. In addition, the Contractor shall maintain a document package, in the

Contractor’s format, containing the following documentation for each item produced for the contract period:

a. Quality Acceptance Documentation

Description CDRL Paragraph Reference

DID Delivery Schedule

Meetings and Conferences “Agenda”

A001 1.4.4. DI-ADMN-81249C

As Required

Meetings and Conferences “Minutes”

A002 1.4.4. DI-ADMN-81250C As Required

Meetings and Conferences “Presentation Material”

A003 1.4.4. DI-ADMN-81373

As Required

Status Reports A004 1.3., 1.10.4., 1.10.5.

DI-MGMT-80368A As Required

Government Property Inventory Report

A005 N/A DI-MGMT-80441D Annual

Contractor’s Corrective Action Plan

A006 1.4.3. DI-MGMT 80501 As Required

Report of Shipping (Item) and Packaging Discrepancy SF-364 (ROD)

A007 N/A DI-MGMT-80503 As Required

Production Surge Plan Capability Analysis Plan

(CAP)

A008 1.17. DI-MGMT-80969 As Required

CAVAF/GFM Report

A009 N/A DI-MGMT-81634C

Daily

CAV/CFM End Item Reporting

A010 N/A DI-MGMT-81838 As Required

Contract Government Furnished Material (GFM) Requisition & Inventory Report

A011 N/A DI-MGMT-82128A Annually

Counterfeit Prevention Plan

A012

1.11.1. DI-MISC-81832 90 Days ARO

Bill of Materials (BOM) A013 1.10.4. DI-PSSS-81656B Annually

Contract Depot Maintenance Production Report

A014 N/A DI-PSSS-81995A Monthly

Calibration Certification Report

A015 1.7.4 DI-QCIC-80798C Upon ACO Request

b. Test Data Sheet

c. Quality Acceptance Review Documentation

d. Parts replaced listed by each serial numbered end item repaired

e. Engineering Change Proposals

f. Government Furnished Material Report

1.4.3. The Contractor shall develop and provide a corrective action plan with regard to breached or anticipated to be breached contractual requirements. (DI-MGMT- 80501).

1.4.4. Meetings and Conferences the Contractor shall support meetings (e.g., teleconferences, Program Management Reviews (PMR), Technical Interchange Meetings (TIM), etc.) with the Government. The Contractor shall provide meeting facilities. (DI-ADMN-81249C, DI-ADMN-81373 and DI-ADMN-81250C).

1.5. Quality Program and Inspection System Requirements

1.5.10. The Contractor shall establish, document and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with the contract requirements.

1.5.11. When a Deficiency Report (PQDR) is received for an end item repaired under the terms of this contract, the Contractor shall comply with the ACO directions.

Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.

1.5.12. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly, to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO before production of the next end item.

1.5.13. The Contractor shall allow quality assurance reviews to be conducted at the site of repair at the request of the Defense Contract Management Agency (DCMA) throughout the contract period.

1.5.14. The Contractor shall allow a quality acceptance review by the DCMA representative at the site of repair for each end item generated under the terms of this contract.

1.5.15. The Contractor shall submit requests for deviation / waiver to the PCO through the ACO. Work shall not be initiated on assemblies / components affected by deviation / waiver pending approval / disapproval. Requests shall include the contract number, NSN and P/N of end item and lowest part / assembly affected, effect on cost / price and delivery schedule, description of deviation / waiver, justification for deviation / waiver, and proposed corrective action taken.

1.6. Condemnation Candidates/End items beyond economical repair

1.6.10. Beyond Economical Repair (BER) items are end items in which the repair cost will exceed 75% of the contracted repair cost for the particular end item in question.

Upon determination of BER, the Contractor shall prepare and furnish to the Government a work request in accordance with the Contractors approved procedure. The Contractor shall report BER candidates to the PCO within 30 calendar days of discovery.

1.6.11. The Contractor shall not condemn reparable or recoverable items without prior approval of the PCO or ACO. The Contractor shall ensure non-repairable items are demilitarized and disposed according to the Contractor-developed, Government-approved property procedures.

1.6.12. As specified in the Contractor-developed, Government-approved property procedures, the disposition of condemned items will be determined on a case-by-case basis by the ACO.

1.6.13. On units approved to be condemned by the Government, the Contractor is authorized to retain serviceable parts salvaged from the condemned unit. The salvaged parts shall be retained by the Contractor for further use in repair of all NSNs listed on this PWS. These parts will not be replenished when used up. The non-useable, scrapped parts shall be condemned IAW the Contractor-developed, Government-approved property procedures.

1.7. Special Tools (ST) and Support Equipment (SE)

1.7.1. The SE required to accomplish the scope of work to be completed on end-items under this contract is contained in the technical orders and/or contractors latest repair instructions. If the equipment specified in the repair procedures is not designated as Government furnished in this contract, the Contractor shall furnish identical or substitute SE from commercial sources.

1.7.2. If the Contractor intends to substitute SE, the Contractor shall demonstrate that substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:

a. Displaying drawings, schematics, or specifications which illustrate that the

Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.

b. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.

c. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency.

1.7.3. The Contractor shall show certification documents of all calibrated SE to the ACO prior to work performed as outlined in the PWS.

1.7.4. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall provide certification documents (DI-QCIC-80798C) to the ACO for each SE item as follows:

a. SE part number and serial number

b. Date calibrated

c. Calibration due date

d. Calibration source

e. Calibration procedure used

f. Calibration data

g. Facsimile of the current stamped calibration sticker affixed to SE item

h. Verification of full performance compliance IAW this PWS for SE items not requiring calibration.

i. Traceability to the National Institute of Standards and Technology

1.8. Parts Control Program

1.8.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS. Parts or material used shall be equal to or exceed the original requirements technical data. The current item configuration, as described in the applicable Approved OEM parts list, shall serve as the baseline and Program Parts Selection List (PPSL) for required parts.

1.8.2. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable end-item or system parts list. The Contractor shall notify the PCO via fax or e-mail of any configuration discrepancies noted between the parts list, engineering drawings, and the current configuration of the end-item. The Contractor shall obtain written authorization from cognizant engineering activity via the PCO for deviations from the parts list prior to implementation for parts that are not Class II changes. The contractors engineering department shall have the authority to prepare and approve Class II engineering change orders and minor deviations as defined by MIL-HDBK-61B concerning workload. The contractor shall submit all Class I and Class II ECOs to DCMA for concurrence with classifications. Copies of all Class I and Class II ECOs or minor deviations, shall be forwarded to the PCO through the ACO using contractor’s internal form in accordance with the contractor’s internal procedures (DI-SESS-80639D).

1.8.3. Contractor shall keep records of the sourcing of replacement parts for each end item repaired per their approved Parts Management Plan (PMP) and shall furnish these records for inspection upon Government request.

1.8.4. Diminishing Manufacturing Sources/Material Shortage and Obsolescence. The contractor shall report all diminishing manufacturing sources/material shortages and obsolescence issues to the Government. (DI-PSSS-81656B

1.8.5.

1.8.6.

1.8.7. , DI-MISC-80711A, DI-MGMT-80368A).

1.8.8. Government-Industry Data Exchange Program (GIDEP). The contractor shall submit all appropriate data requirements to the GIDEP as it is generated. The contractor shall screen each Alert or Safe received from GIDEP to determine if the device or process for which the Alert is issued, is used in the manufacture of the unit and take appropriate action. If appropriate action requires a stock purge that negatively impacts production, the contractor shall perform a risk analysis and provide recommendations to the cognizant engineering office. Contractor shall adhere to the policies and directives of GIDEP. DI-MGMT-80368A

1.8.9. The contactor may use DLA (FEDMALL) as source for parts.

1.9. Counterfeit Prevention Plan

1.9.1. Counterfeit Prevention Plan (CPP). Contractors that supply materials, electronic parts, or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate, and disposition counterfeit materials and parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with Data Item Description (DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material, and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to all materials and electronics components procured in sustainment of such systems and assemblies. The requirements of DoD-adopted SAE AS5553D (Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation, and Disposition) and SAE AS6174A

(Counterfeit Material; Assuring Acquisition of Authentic and Conforming Material) shall also apply.

1.9.2. At a minimum, the CPP shall address:

a. Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address (as applicable) materials, hardware, electronic parts, and procured assemblies.

b. Definitions. The Contractor shall utilize definitions per AS6174A to ensure consistency. Any Contractor-derived definitions must be included in an appropriate CPP appendix or annex.

c. Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP.

d. Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each.

e. Risk Assessment. The Contractor shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The Contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material, and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc.

The Contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer.

f. Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 14 April 2022. (Ref. AS5553D, paragraph 4.1.4, 4.1.5, Attachment C)

g. Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing.

Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref.

AS5553D, paragraph 4.1.4, Attachment C)

h. Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies, and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies, and parts, and mechanisms to provide traceability of parts are not possible. The Contractor shall identify the specific systems, assemblies, subassemblies, and parts beyond the Contractors' control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit materials, electronic parts, and suspect counterfeit materials and electronic parts, and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the Contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as Government property, and c) the Contractor has provide timely notification to the Government.

i. Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a Contractor or subcontractor for delivery to, or on behalf of the Department, contains counterfeit materials, electronic parts, or suspect materials or counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).

The PCO shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering Management, the AFMC Discrepant Material Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30-day period, or as directed by AFOSI, ensure all suspected or confirmed counterfeit items are entered into the Government- Industry Data Exchange Program (GIDEP) system, which will serve as the DoD central reporting repository.

j. Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.

1.9.3. The Contractor’s Counterfeit Parts Program shall be in accordance SAE AS5553D and AS6174A and/or DFARS 252.246-7007.

1.10. Engineering Support

1.10.1. Engineering Support shall be provided as requested by the PCO. Engineering support shall be funded as unprogrammed workload and is not considered part of an item’s repair price. These engineering assignments may include such tasks as First Article Inspections, obsolescence resolution, reverse engineering studies on hardware or software, etc. which are depot type activities in support of the assigned workloads. The contractor and the Government shall mutually agree upon task descriptions, level of effort (LOE) and the cost of the work to be performed. Expected outputs from this requirement shall be reported in Engineering Change Proposal (ECPs) in accordance with DI-SESS-80639D and Status Reports in accordance with DI-MGMT-80368A.

1.11. Cannibalization of Parts (Module Swap)

1.11.1. The Contractor is authorized to cannibalize subassemblies or parts between inducted unserviceable assets in order to expedite repair when a particular repair is constrained for lack of materials that are not and will not be immediately available. Cannibalization requests shall be subject to the review and subsequent approval or disapproval of the Government Equipment Specialist, 424 SCMS/GUMB. Such cannibalization actions should only be considered upon exhaustion of all other sources of materials. The Contractor shall not initiate any cannibalization action unless such action shall satisfy all material requirements for the item in question. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any subassemblies or parts from any inducted end item.

1.12. Ozone Depleting Substances (ODS)

1.12.1. This PWS is not requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of the contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the specifications or Technical Data of this PWS. The Contractor shall immediately identify the substitute by written notification to the PCO.

1.13. Delivery Schedule

1.13.1. The Contractor shall meet the contractual delivery schedule.

1.14. Customer Service Requirements

1.14.1. Information Requests: The Contractor shall ensure responses to requests for information and data are only provided to customers authorized by the PCO in the performance of official duties. All requests between the Government and the Contractor shall go through the Procuring Contracting Officer (PCO).

a. Information requests shall contain a subject line, nature of the request and an expected/requested response date and time. The request must be identified as “EMERGENCY”, “URGENT” or “ROUTINE” IAW paragraph 1.14.2 of this PWS so that a response is provided within the specified timeframes. A log will be maintained by the PCO or an appointed Government Representative.The log will be used to track all requests and evaluate response times.

b. Contractor requests for engineering and/or technical related problems or issues shall be submitted on an AFMC Form 202, Nonconforming Technical Assistance Request and Reply or through the PCO by E-mail/phone call. All AFMC Form 202s submitted shall be sent directly to 424 SCMS Cognizant Engineer with an information copy to the ACO and PCO.

1.14.2. Response Times for Information Requests: All requests for information initiated by the Government or Contractor shall be in writing and submitted electronically via e-mail or fax. Requests for information shall be answered within the following timeframes:

a. Emergency Respond within two (2) business days.

b. Urgent- Respond within five (5) business days.

c. Routine- Respond within ten (10) business days.

1.15. Safety and Health

1.15.1. While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. By safety and health standards, the Contractor shall notify the PCO, within eight (2) business days of any damage to government property where the dollar value exceeds $500,000.00 and within two (5) business days, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

If requested by the designated PCO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.

1.16. Manpower Reporting Language for Contract Performance Work Statements

1.16.1. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields in the Service Contract Report (SCR) at www.SAM.gov

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30

September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year Contractors may direct questions to the SAM.gov service desk (https://www.fsd.gov/fsd-gov/home.do)."

*Reporting Period: Contractors are required to input data by 31 October of each year.

Uses and Safeguarding of Information: Information from the secure web site is proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor's name and contract number associated with the data.

User Guide: Data for Air Force service requirements must be input at www.sam.gov. A quick start user guide is available at on the SAM.gov website at https://www.fsd.gov/sys_attachment.do?sys_id=95849fed1be769100ca4a97ae54 bcbba.

1.17. Surge

1.17.1. In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The Contractor is required to provide the Government a surge plan. A CDRL (A008) and DID (DI-MGMT-80969) are associated with the surge requirement. After being notified of the surge demand in writing, the Contractor may see additional orders and/or will see the priority status elevated on current orders. The Contractor may do one or more of the following to fill the demand:

a. The Contractor will maintain a certain level of safety stock of components to draw from to perform additional repair.

b. Add additional shifts to increase production within the Contractor and with suppliers.

c. The Contractor will work with the various manufacturing sites and their supply chains to expedite production. The contractor will be notified in advance of and be given the opportunity to negotiate; any expedite charges that might apply at the time of surge. Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.

1.17.2. Surge plans have four basic phases (assessment, execution, sustainment, exit/termination) and the plan associated with the surged items requested need to address those phases. The Government will provide, in writing, the items on contract that are requested to be surged. That request will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.

1.17.3. Contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.

1.17.4. The Contractor shall notify the PCO advance and be given the opportunity to negotiate any expedite charges that might apply at the time of surge.

Contractual requirements for production of this contract are addressed in Part I of basic contract. The schedule and surge requirements shall be on a best-effort basis.

1.18. Supply Chain Risk Management (SCRM)

1.18.1. Contractor must provide a comprehensive Supply Chain Risk Management (SCRM) Plan in accordance with the instructions to offeror prior to award. This plan must be maintained during performance of this contract, will be incorporated into the contract at award, and must illustrate executable processes for identifying supply chain risks as early as possible.