This performance work statement describes falconry services required under a firm fixed price contract to conduct gull abatement at the Trident Refit Facility in Bangor, Washington. The contractor must be a master falconer holding a special purpose abatement permit. Services include patrolling the facility with free flying raptors to chase away glaucous-winged gulls, with effort levels varying seasonally from 32 hours per week non-breeding season to 50 hours per week during breeding season. The base period of performance is from September 27, 2021 to September 26, 2022 with an option period to March 26, 2023. The contractor must meet security requirements including obtaining a National Agency Check with Inquiries investigation and badge for unescorted access. The contractor shall maintain compliance with safety regulations and qualifications requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7. Technical Exhibit 1_Gull Abatement Log.xlsx | XLSX spreadsheet | |
| Attachment 6. SWFPAC Vehicle Pass Request.pdf | ||
| Attachment 5. Investigation Request.pdf | ||
| Attachmet 8. WA SCA 2015-5525 REV 14.pdf | ||
| N44255-21-R-5006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Date: 06 August 2021
Trident Refit Facility (TRF) located at Naval Base Kitsap Bangor, has a waterfront main production area on a triangle-shaped pier. Due to the proximity of the pier to the water, roosting and nesting gulls are a nuisance, causing both a safety and health concern for the TRF employees. TRF was formerly reported to the Center for Disease Control due to the amount of gull excrement in the vicinity of personnel’s office areas. The ammonia smell enters the buildings from the Heating, Ventilation, and Air Conditioning (HVAC) systems and building vents, open doors, etc. TRF is requesting a Falcon Service to harass the problem birds from the area. Contractor must be qualified as a Master Falconer and must attain their own Special Purpose Abatement permit, pursuant to 50 Code of Federal Regulations (CFR) 21.29. A General Falconer may only conduct abatement activities as a subpermitee of the holder of the abatement permit.
The Contractor will patrol the facility with free flying predator birds that will chase the problem birds (primarily Glaucous-winged Gulls) offsite. The actual hours of operation will be determined based on time of day when the bird pressure is highest at the site. The base year performance period will be one calendar year, with a six-month option period, and will have varying level of effort over the course of the period of performance aligned with bird pressure.
Since this work will occur on the Delta Pier, inside of the Waterfront Restricted Area (WRA), the Contractor must be able to meet the security requirement to obtain unescorted access within the WRA. In order to gain a W2 badge, a valid, activated National Agency Check with Inquiries (NACI) Tier 1 investigation with a Favorable Determination (within the last 10 years) is required.
PART 1: GENERAL INFORMATION
1.1 Description of Services: This is a non-personnel services contract to provide gull abatement. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Falcon Services as defined in this Performance Work Statement. The Contractor shall perform to the standards in this contract.
1.2 Performance Objectives:
1) Reduce gull population by 90 percent each day while onsite (on average), reducing the hazard to personnel and facilities.
2) Comply with all safety and security requirements of the WRA.
3) Communicate effectively with Navy personnel throughout the course of the contract.
1.3 Scope: The Contractor will patrol the facility with free flying predator birds that will chase the problem birds (primarily Glaucous-winged Gulls) offsite. The actual hours of operation will be determined based on time of day and time of year when the bird pressure is highest at the site.
1.4 Period of Performance:
BASE PERIOD: 27 SEP 2021 – 26 SEP 2022
OPTION PERIOD: 27 SEP 2022 – 26 MAR 2023
1.5 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in alignment with the Performance Requirements (Attachment 1). Attachment 1 outlines expected performance standards and how the Government will evaluate the Contractor for each performance objective. It defines how the performance standards will be applied, the method of surveillance, and the minimum acceptable defect rate(s).
1.6 Recognized Federal Holidays: Contractor is not required to perform services on federal holidays. The Government is not responsible for paying the Contractor for federal holidays.
1.7 Hours of Operation: The Falcon service shall begin 14 calendar days after the beginning of the period of performance. The Contractor shall schedule a kickoff meeting with the Government and complete all necessary forms and applications for security clearance (Section 1.11) prior to the start of falcon service work, at no additional cost to the Government. Expected weekly level of effort is expected to vary over the calendar year in response to bird pressure, and therefore, the Contractor will establish two weekly labor rates:
1) Non-breeding season – September through February
The Government expects the Contractor to be onsite conducting bird abatement activities 32 hours per week, on average, over the non-breeding season. Dependent on the bird pressure, security restrictions around WRA operations, escort availability, federal holidays, or personal leave, the actual hours of abatement may be more or less in any given week, but must average 32 hours per week over the non-breeding season period of performance.
2) Breeding Season – March through August
The Government expects the Contractor to work 50 hours per week, on average, over the Unescorted Breeding Season period. The Contractor must have unescorted access to the WRA at this time. Dependent on the bird pressure, security restrictions around WRA operations, federal holidays, or personal leave, the actual hours of work may be more or less in any given week, but must average 50 hours per week over the Unescorted Breeding Season period of performance.
The actual hours of operation will be determined based on time of day when the bird pressure is highest at the site.
The Government will only provide an escort up to 40 hours per week, and Government-provided escorts are only available Monday through Friday.
The Contractor is expected to fulfill seasonal hourly requirements, and will schedule around Federal holidays, closures of Government facility due to military operations or local or national emergencies, administrative closings, escort availability (if applicable), or similar Government-directed facility closings.
1.8 Place of Performance: The work to be performed under this contract will be performed at Delta Pier located at Trident Refit Facility, Naval Base Kitsap Bangor, Silverdale, Washington.
1.9 Type of Contract: Firm Fixed Price (FFP) Service Contract
1.10 Security Requirements:
Contractor will be required to enroll and register into the Defense Biometric Identification System (DBIDS) and undergo a federal background investigation to obtain unescorted access to the WRA. If the Contractor requires the regular use of a vehicle to transport falcons/equipment, the Contractor will also need to obtain a vehicle pass for the
WRA.
1) DBIDS Credential: Contractors are required to request enrollment in DBIDS by submitting a Badge Authorization Visit Request (BAVR). See Attachment 3 for BAVR instructions. Personnel will be allowed access to the WRA by having either a W1 (Escort Required) or a W2 (Unescorted Access) badge.
2) Background Investigation: In order to gain a W2 badge (unescorted access to the WRA), a valid, activated National Agency Check with Inquiries (NACI) Tier 1 investigation with a Favorable Determination (within the last 10 years) is required. Contractor personnel performing work under this contract must have, or have the ability to obtain a W2 for unescorted access to TRF at the time of the proposal submission, and must maintain the level of security required for the life of the contract. The background investigations are wide-ranging but the following are grounds for denying a security clearance:
Conviction of a crime in any U.S. court with a sentence of a year or more in prison Using a controlled substance (as defined in section 102 or the Controlled Substances Act) Mental incompetence as determined by a mental health professional approved by the DoD A dishonorable discharge from the military
See Attachment 4, item 2 for instructions to request an NACI investigation and Attachment 5 for the Investigation Request form.
3) Vehicle Pass: In order to drive a non-Government vehicle into the WRA, the Contract must submit a Surface Weapons Facility Pacific (SWFPAC) Vehicle Pass Request (Attachment 6) to NAVFAC NW Security Manager and Assistant Security Manager (contact info in Attachment 4). The non-Government vehicle must be registered in the company’s name AND must have a clear logo displayed on the vehicle indicating the company it is registered to.
Until the appropriate clearances are obtained, an escort will be required within the WRA. The Contractor is responsible for ensuring all badges and passes are current and up-to-date throughout the period of performance.
Attachment 4 contains additional security protocols and restrictions, which the Contractor shall familiarize themselves with. Note no Bluetooth devices and no cameras (including cellphones with cameras) are permitted within the WRA. C/980S.5 Sherri Kramer will be the onsite POC to assist with badging, security briefing, scheduling, and directing where work is to be performed.
1.11 Personnel Safety: TRF is an industrial work area and compliance with safety regulations and protocols is paramount. The Contractor is responsible for maintaining compliance with Occupational Safety and Health Administration (OSHA) requirements for the tasks performed, including ensuring personnel are trained for specific tasks and equipped with appropriate personal protective equipment (PPE).
1.12 Special Qualifications: Contractor must be qualified as a Master Falconer and must attain their own Special Purpose Abatement permit, pursuant to 50 CFR 21.29. A General Falconer may only conduct abatement activities as a subpermitee of the holder of the abatement permit. The Contractor is responsible for following all applicable rules and regulations of the Special Purpose Abatement permit. If incidental bird takes occur, the Contractor shall follow the established protocols outlined in the Special Purpose Abatement permit.
1.13 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.14 Identification of Contractor Employees: All Contractor personnel are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor will need to wear badging or clothing that clearly announces who they are so that their work is not interrupted unnecessarily.
PART 2: CONTRACTOR FURNISHED ITEMS AND SERVICES
2.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.
PART 3: GOVERNMENT PROVIDED ITEMS, FACILITIES, AND SERVICES
3.1 Escort: The Government shall provide an escort for the Contractor until the Contractor attains the appropriate clearance for unescorted access into the WRA. The Government will provide an escort up to 40 hours per week, Monday through Friday.
3.2 Bird holding facility: The Government will provide a space to hold raptors during the day when the birds are not being flown. The facility must have adequate ventilation for avian health. Contractors may also store equipment overnight in this facility.
3.3 Bird recovery assistance: The Government will provide assistance, if needed, for recovery of birds in the water or in buildings.
3.4 Background check: The Government will perform the background check for Contractor personnel to determine appropriate level of clearance. See Attachment 4 for further instructions.
PART 4: REQUIREMENTS
4.1 Federal Special Purpose Abatement Permit: Contractor must hold a special purpose abatement permit for performing abatement activities for the Government.
4.2 State Master Class Falconry Permit: Special purpose abatement permit holder must be a certified Master Falconer.
4.3 Relevant Experience: Master Falconer work should have relevant experience conducting abatement in an industrial waterfront area.
4.4 Eligibility for Security Clearance: Contractor(s) must be eligible and willing to attain a valid, activated National Agency Check with Inquiries (NACI) Tier 1 investigation with a Favorable Determination (within the last 10 years).
See Section 1.11 for instruction and common disqualifications for obtaining the clearance.
PART 5: ATTACHMENT/TECHNICAL EXHIBIT LISTING
Attachment 1 – Performance Requirements Summary Attachment 2 – Deliverables Schedule Attachment 3 – BAVR Instructions Attachment 4 – Physical and Operational Security Guidance Attachment 5 – Background Investigation Request Form Attachment 6 – SWFPAC Vehicle Pass Request Form Technical Exhibit 1 – Daily abatement activity logbook for Contractor personnel
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
The Contractor service requirements are summarized into the performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objectives (PO)
1) Reduce gull population by 90 percent each day while onsite (on average), reducing the hazard to personnel and facilities.
2) Comply with all safety and security requirements of the WRA.
3) Communicate effectively with Navy personnel throughout the course of the project.
PO Metric Evaluation Method Performance Threshold Surveillance Method
Gull numbers around Delta Pier after abatement activity
1.1 The Contractor shall keep a daily
log using the attached Excel spreadsheet (Technical Exhibit 1).
The Contractor shall submit the completed log monthly, prior to submitting their invoice, within five business days of the end of each month. All data will be delivered in native file format (e.g., copies of notebooks, datasheets, Excel sheet).
Highly satisfactory: 90% reduction while onsite Satisfactory: 80% reduction while onsite Unsatisfactory: less than 80% reduction while on site
NAVFAC NW will review progress reports and Excel data.
1 Excrement loads around Delta Pier
1.2 Qualitative assessment of
excrement loads at the facility will remain low, and not present a safety hazard to TRF employees.
Excrement loads may increase during breeding season, but remain far below pre‐abatement activity levels.
Onsite POC will conduct walk‐throughs at the site over the course of the contract, and speak with long‐time personnel familiar with pre‐abatement activity levels.
PO Metric Evaluation Method Performance Threshold Surveillance Method
Safety and Security compliance
2.1 Performance assessment of
Contractor’s ability to follow safety and security protocols and guidance.
Satisfactory: Contractor personnel require only minimal guidance and only occasional reminders, if any, on appropriate safety and security measures after initial instruction.
Unsatisfactory: Contractor personnel require repeated notification of breaches of safety and/or security protocols OR Contractor refuses to comply with safety and/or security measures.
Overall assessment based on feedback by TRF personnel to COR and COR’s personal experience with Contractor personnel.
3 Timely communication
3.1 Contractor follows deliverable
schedule. Contractor notifies COR immediately if any issues appear.
Contractor responds to Government inquiries in a timely manner.
Highly satisfactory: Contractor always responds to Government inquiries within 2 business days.
Contractor needs few, if any reminders, of deliverable requirement. Contractor notifies COR immediately of issues or incidents.
Satisfactory: Contractor normally responds to Government inquiries within 2 business days;
Contractor regularly needs a reminder of deliverable requirement.
Unsatisfactory: Government must reach out to Contractor multiple times to receive response.
Contractor does not provide deliverables or does so more than 15 days after the end of the calendar month. COR does not hear of issues from Contractor, but rather through third parties.
Assessment by COR of Contractor responsiveness and timeliness
3 Professional communication
3.2 Contractor personnel comport
themselves in a professional manner. Contractor personnel work effectively with other Navy and TRF personnel.
Satisfactory: COR receives positive feedback from Navy and TRF personnel that work in coordination with Contractors (e.g., escorts, facilities staff).
Unsatisfactory: COR receives complaints or incident reports of unprofessional actions by Contractor personnel.
Assessment by COR, with feedback from other Navy and TRF staff
ATTACHMENT 2: DELIVERABLES TABLE
Deliverable Frequency Method of delivery
Medium/ Format Submit To
Technical Exhibit 1:
Completed Monthly data log of hours worked and gull numbers
Provided within 5 business days of the end of each month prior to invoice submission
Email Excel spreadsheet
Sherri Kramer sherri.kramer@navy.mil Daniel Stoneburner Daniel.stoneburner@navy.mil Tyler Yasenak tyler.yasenak@navy.mil Rebecca Johnson Rebecca.a.johnson1@navy.mil
ATTACHMENT 3: BAVR INSTRUCTIONS
Please go to the following link to request access via the Badge Authorization Visit Request (BAVR) system: https://www.bavr.cnic.navy.mil. A warning page may display asking if you want to continue to page. Yes, continue to page. You will be notified at the e‐mail address you provided when all approvals have been completed. Each individual will need a badge.
Completion Instructions:
Ensure all the blocks in Red are filled in to include your Driver's License number. Most of the information is self‐explanatory with exception of the following:
Work Information:
Personnel Type: Contractor Command you are Visiting: TRF
Disregard the Originating Command Security Officer Section ‐ Not required.
Sponsor: Use the email address (steven.e.chavez1@navy.mil)
Purpose of Visit:
Requesting a DBIDS Badge. Request access per Contract # ‐ for gull abatement service at TRF to protect human health and safety. Request codes B9, W2. TRF POC: Sherri Kramer/360‐315‐1234. NAVFAC POC:
Rebecca Johnson/360‐396‐0079.
Start date: 5 business days from date of submission End date: End of Period of Performance
Additional instructions for Badge Pick‐Up
‐ DO NOT try to pick up your ID prior to the start date you listed on your application.
‐ Pick up at Naval Base Kistap, Bangor Submarine Base, Pass & ID. Pass & ID is located on the right as you approach the Trident Gate (main gate) at Naval Base Kitsap, Bangor. Hours: M‐F 0700‐1500 ‐ BE SURE TO ARRIVE EARLY AS LINES ARE LONG (typical wait is 60‐90 minutes). Friday afternoons and lunch times TUES‐FRI tend to be shorter wait times. Mondays and mornings are generally busy.
‐ Bring in current registration and insurance for vehicle.
‐ Bring your Drivers License and proof of citizenship. Proof of citizenship can be any of the following list of documents:
o Current US Passport o Enhanced Driver's License o Driver's License and Certified copy of birth certificate (NO PHOTOCOPIES)
If you have any questions or need assistance filling out the online request, please contact Rebecca Johnson, 360‐396‐0079, Rebecca.a.johnson1@navy.mil.
FOR OFFICIAL USE ONLY/PRIVACY ACT DATA
ATTACHMENT 4: PHYSICAL AND OPERATIONAL SECURITY GUIDANCE
1. Passes and Badges: Heightened security requirements may cause unexpected delays. The Contractor is responsible for requesting badges in a timely manner. Each employee shall wear the Government issued badge over the front of the outer clothing. When working on site, if wearing the badge would be a safety hazard, the individual may remove the badge but shall retain it in his/her possession to show if challenged. When an employee leaves the Contractor's or subcontractor’s service, the employee's pass and/or badge shall be returned to the issuing office within three calendar days. Upon completion of the work, the Contractor shall return all identification items issued to him during the course of the contract.
The Contractor shall provide accompanied escorts for contractor and subcontractor personnel as needed to meet installation security requirements. Contractor or subcontractor personnel who do not possess permanent access credentials shall not be left unattended.
2. Personnel Access: Personnel will be allowed access to the WRA by having either a W1 (Escort Required) or a W2 (Unescorted Access) badge. In order to gain a W2 badge, a valid, activated National Agency Check with Inquiries (NACI) Tier 1 investigation with a Favorable Determination (within the last 10 years) is required. An NACI clearance may be obtained from the Contractor or by completing Attachment 5 – “SF‐85 E‐QIP Invitation Request” and emailing the form to the NAVFAC Northwest Security Manager AND Assistant Security Manager (contact information below). The Contractor will then be required to submit proof of U.S. Citizenship, complete fingerprinting, and submit a Declaration for Federal Employment (OF‐306) to the NAVFAC NW Security Manager AND Assistant Security Manager.
Given the sensitive nature of the information, the Contractor shall request a DoD Secure Access File Exchange Link from the Security Managers to upload documents.
Upon receipt by the Government of the 1) “SF‐85 E‐QIP Invitation Request”, 2) proof of U.S. Citizenship,
3) fingerprints, and 4) Form OF‐306, an investigation request will be initiated along with an email sent to the Contractor explaining how to login to e‐QIP and what to do upon completion. After the investigation is completed and adjudicated by the DOD Consolidated Adjudications Facility (CAF) with a Favorable Determination, the Contractor may be eligible for a W2 badge.
3. Access to Installations: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).
The Contractor shall provide the Contracting Officer (KO) with the name of their designated Service Contractor Administrator for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.
The KO will send the list of employees to the Security Manager upon receipt.
4. DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.
The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
FOR OFFICIAL USE ONLY/PRIVACY ACT DATA
5. Access to Buildings: The Contractor shall monitor and control access into restricted areas under their responsibility in accordance with CNICINST 5530.1, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non‐duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
6. Access Arrangements: The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government shall facilitate building access for the Contractor. The Contractor shall not be issued any keys for access into any Government building within Navy Region Northwest. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
7. Security Clearances: Portions of the work under the contract are performed in secure areas and all persons requiring access to a secure area shall possess the minimum security clearance required for access to that area or, in most cases, will be escorted by activity or Government personnel. In the case of escort, 48‐hour advance notice to the activity will be required except in emergency or urgent work.
Contractor employees must be free of felony convictions, and prior military service members must have had an honorable discharge.
8. Employee Status: The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions, arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.
9. Operational Security (OPSEC): Any photographs within Navy Region Northwest shall be reviewed by the NAVFAC Northwest OPSEC Manager (NAVFAC Northwest Security Manager) prior to public release.
NAVFAC NW Security Manager Steven Chavez steven.e.chavez1@navy.mil
(360) 396‐0214
NAVFAC NW Assistant Security Manager Phillip Saurer Phillip.saurer@navy.mil
(360) 396‐0051
File details come from the government source that posted it. Updated .