PWS Geese Management.pdf
PDF 317 KB Posted
- Attached to
- Canada Geese Hazard Management Federal contract opportunity
- Solicitation number
- SP4703-20-Q-0061
- Issued by
- Defense Logistics Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP4703-20-Q-0061.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Defense Logistics Agency
DLA Installation Support
(DM-FREE)
PERFORMANCE WORK STATEMENT (PWS)
Canada Geese Hazard Management
PERFORMANCE WORK STATEMENT
1. SCOPE
The purpose of this procurement is to provide monthly Canada Geese hazard management services at the Defense Supply Center Richmond for DLA Installation Support at Richmond. The contractor shall prepare a geese management protocol using working dogs.
BACKGROUND
DLA Installation Support at Richmond operates on behalf of the Defense Supply Center Richmond, which is a Department of Defense (DoD) installation. The Defense Supply Center Richmond is located
2.5 miles south of the City of Richmond in Chesterfield County, Virginia. Defense Supply Center Richmond currently and historically has had a problem with Canada Geese population. Canada Geese cause damage to turf through excessive droppings and grazing; additionally geese can be aggressive towards people during nesting season.
OBJECTIVES
The objective of this procurement is to eliminate or minimize the Canada Geese population at the Defense Supply Center Richmond to help mitigate hazards and nuisances associated with geese activities.
DOCUMENTATION AND RECORDS
All documentation, records, and schedules, as described in this PWS, which are the responsibility of the Contractor and the property of the Government and shall remain so upon termination or completion of the contract. The Contractor shall keep these items current. Documentation, record, and schedules shall be turned over to the Government upon termination or completion of the contract.
SPECIFIC TASKS
5.1. Prepare Geese Management Protocol:
The contractor shall prepare a protocol for non-lethal management of geese hazard management at Defense Supply Center Richmond as part of the Contractor’s technical proposal. The primary management techniques to be performed by the Contractor, and addressed in the protocol, shall be harassment by working dogs(s). The Contractor shall develop the protocol to accommodate Defense Supply Center Richmond’s requirement for rapid response to observed and reported geese hazards.
The protocol shall address the procedures to be followed by the Contractor for surveillance of geese presence/hazards, use of working dogs(s) for harassment, and record keeping/reporting. The protocol shall include the Contractor’s schedules for surveillance and use of the working dog(s). The protocol shall be developed using an adaptive management strategy and shall establish the Contractor’s procedures for on ongoing coordination between DLA Installation Support at Richmond and the Contractor regarding surveillance, controls, and incidents. The protocol shall also include the Contractor’s standard record keeping forms and reporting format(s).
5.2. Use of Working Dogs:
The Contractor shall utilize at a maximum, two (2) working dogs and personnel as part of this contract.
The contractor shall be responsible for the ownership and use of the working dog(s) at Defense Supply Center Richmond to harass geese and chase them from the pond and fenced perimeter area.
The Contractor shall have at a minimum, three (3) years’ experience with the use of working dog(s) for harassment. The Contractor shall perform this harassment as needed in response to geese presence reported to the Contractor by the Contracting Officer’s Representative (COR). The Contractor shall have experience and shall be fully training and fully responsible for working and caring for the dog (See Dog Maintenance). The Contractor shall provide on-call coverage seven days each week, 52 weeks per year, from sunrise to sunset based on the needs identified below and on past experience. In addition, the Contractor shall address procedures and response to unscheduled emergency calls with notification from the COR.
The Contractor’s protocol shall include coverage during the peak season, February 1 – October 31, the amount of scheduled visits per day, the time of visits, along with procedures for coverage. The Contractor’s protocol shall also address scheduled visits and time of visits and procedures for the off-peak season coverage, November 1 – January 31. The Contractor shall base their pricing calculation on an estimate of 200 visits per 12-month period.
5.3 Surveillance of Control Actions
The Contractor shall perform ongoing surveillance of all control action undertaken at Defense Supply Center Richmond to assess their effectiveness. The Contractor shall coordinate with the COR and make recommendations to maximize the effectiveness of control actions.
5.4 Record Keeping and Reporting
The Contractor shall record all surveillance, control and inspection activities in accordance with the procedures established in the protocol. The Contractor shall prepare a monthly schedule of activities based on the Contractor’s protocol.
The Contractor shall provide the COR licenses and veterinarian exam records for all dogs used during the term of this contract. The records shall be provided to the COR as outlined in the Deliverables section. The Contractor shall be responsible for all vaccinations/shots and any other maintenance requirement ensuring a healthy well-maintained dog. The contractor must show proof of a dog license(s) and must provide a copy of the annual veterinarian exam. The Contractor must also provide proof of Liability Insurance to insurance accidents to property or personnel that may occur while the dog is on Defense Supply Center Richmond’s property.
6. SECURITYREQUIREMENTS INSTALLATION SECURITY
6.1 CONTRACTOR ACCESS AND USE OF PREMISES
6.1.1 Security Requirements for Defense Supply Center Richmond (DSCR) are:
a. No employee or representative of the Contractor will be admitted to the work site unless he/she furnishes satisfactory proof that he is a citizen of the United States or an alien who has been lawfully admitted for permanent residence, or who presents evidence from the Immigration and Naturalization Service that employment will not affect his immigration status.
b. Personnel Information: All authorized non-military personnel utilizing the base are required to have in their possession at all times an installation visitor pass or access control badge. This pass is issued by the DSCR Welcome Center, located at Building 210. The Welcome Center is open Monday through Friday except federal holidays from 6:30 a.m. to 4:30 p.m. In order to obtain pass/badge, the Contracting Officer or designee will request personal identifiable information (PII) from each contractor and submit it to Security a minimum of 7 working days prior to start of work.
c. Official Capacity: The Contractor shall comply with visitor pass requirements for the performance of work at DSCR.
d. The DSCR Security Department will run a criminal history check on Contractor employees as a condition of employment. Official proof of identity or naturalization papers may be required, which will be retuned once entered into the security computer system. Based on the results of the criminal history check, the Vetting Official (VO) will or will not grant entry to the installation based on guidance set forth by the Installation Commander. If entry is denied, the Contractor will be immediately notified. DSCR Security may require updating or rechecking criminal history based on the duration of the contract. NOTE: The Visitor Center will deny access to any person who the Installation commander has deemed unfit for unaccompanied access.
e. Proof of Identity: Official identification consists of any current Government issued picture identification. Examples- of official identification are valid state issued driver's license, military ID card, military dependent ID card, green card, etc. Expired identification is not valid.
f. Pass or Badge Management: Expired, invalid, inaccurate, inoperative or terminated Pass on Access Control Badge shall be returned to the Contracting Officer or his designee for disposition. These cards are the property of the U.S. Government and shall not be retained by the cardholder upon expiration, replacement, or when the DoD affiliation of the employee has been terminated. If the Pass or Access Control Badge is lost or stolen a police report will be completed and a new request will be submitted by the Contracting Officer or designee. Compliance with this requirement is mandatory and certification thereof to the Contracting Officer is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment.
g. Contractor Security Responsibilities: The contractor is responsible for employees and subcontractors under their employment. Contractors will ensure that employees are familiar with and obey installation traffic, safety, and security regulations. Contractor employees, including subcontractors, are required to wear the ID card conspicuously on their outer clothing and above the waist at all times while working on this Center. Personnel are subject to challenge and removal from the work area if the ID card is not being worn. It is the COR/designee’s responsibility to enforce this requirement. Failure to do so is just cause for ordering that work on a contract be stopped.
h. Unofficial photography, cameras, or photographs are prohibited on DSCR property.
When official photographs are required, submit a written approval request containing specific justification and details to the Contracting Officer 5 days prior.
i. Firearms, Weapons, Alcoholic Beverages, Illegal Drugs, and Contraband are prohibited on DSCR property. Violators may be prosecuted. State issued/authorized concealed weapons permits are not valid on Federal (DSCR) property.
j. Trusted Traveler Program (TTP): Contractors are not authorized to use the TTP to escort individuals on to the installation.
k. DSCR is not responsible for job site security. Removal of material from job-site and Installation are subject to security checks. The contractor is to notify DSCR security of any special measures (watchmen, alarm, etc.), security concerns, security problems, or unusual activities within the job site.
l.
6.1.2 TRAFFIC LAWS AND ENFORCEMENT:
a. Motor Vehicle Operation: Ingress and egress of personnel will be subject to the DSCR security regulations. All personnel must be made aware of the base speed limits which is 25 mph (unless otherwise posted). Speed limits are enforced and violators will be ticketed.
DSCR traffic violations are processed through the federal court system.
b. Seatbelts are MANDATORY.
c. Use of cellphones while driving is prohibited.
d. Parking is in designated areas only, between two white lines. No parking is permitted in fire lanes, on seeded areas, in reserved parking slots, or assigned handicapped parking.
Any equipment or vehicle that does not fit within a standard parking space must contact the Contracting Officer to determine a designated area for parking such equipment or vehicle.
e. Traffic accidents should be reported immediately to the DSCR Emergency Dispatch by calling 911 or (804) 279-4888 for non-emergencies.
f. All personnel entering the installation are subject to random vehicle inspections/searches at any time while on the Installation. The purpose of these inspections is to detect the theft of Government and private property, firearms, weapons, alcoholic beverages, illegal drugs, or contraband.
6.1.3 TRUCK DELIVERIES
a. It is the contractors’ responsibility to notify the Contracting Officer of truck deliveries and escort trucks from the truck gate to its destination. This will not be done by DLA Police.
b. All commercial vehicles will enter the installation through the Commercial gate adjacent to the North Gate access control point (ACP). All commercial vehicles will also depart the installation via the North Gate. Commercial vehicles include, but are not limited to, semi-trucks, box trucks, passenger busses, cargo vans, dump trucks and walk-in vans. All such vehicles entering the gate will be processed through an entrance security inspection point before continuing onto the Installation.
c. Vehicle Inspection: Commercial/large vehicle inspections will be conducted on all vehicles by DLA police per the most current Police Standard Operating Procedure. The inspection may be upgraded based upon Force Protection Conditions (FPCON).
d. Shipment Validation: All deliveries to DSCR will have some form of identifying documentation. For example, a bill of lading must identify: 1) a DSCR POC and 2) a delivery location. Validation will consist of reviewing the delivery documentation by DLA police officers as provided by the delivery truck driver. Failure to do so may result in delivery delay or denial of the delivery. The source of delivery will be identified and verified by DLA police officers.
e. Driver Vetting: All delivery/commercial truck drivers will be vetted by DLA police officers prior to allowing entrance onto DSCR. Vetting will consist of conducting a background check of the driver and all passengers using Virginia Criminal Information Network (VCIN). Any driver or passenger having an outstanding warrant will be handled in accordance with DLA/DSCR procedures. If the driver and/or passengers have personal weapons (firearms) or dangerous weapons, they will not be authorized entrance to the facility. If procedural requirements have not been met, the driver will not gain access.
f. Increased FPCON requires increased screening requirements. FPCON Charlie and Delta require the opening and visual inspection of each package.
SAFETY AND HEALTH REQUIREMENTS
The contractor shall comply with all applicable federal safety rules and regulations pertaining to this PWS in Attachment 1.
ENVIRONMENTAL REQUIREMENTS
The contractor shall comply with all applicable federal and state environmental laws and regulations pertaining to this PWS in Attachment 2.
DISCLOSURE OF INFORMATION
Information made available to the Contractor by the Government for the performance or administration of this effort shall be used only for those purposes and shall not be used in any other way without the written agreement of the Contracting Officer. The Contractor agrees to assume responsibility for protecting the confidentiality of Government records, which are not public information. Each Contractor or employee of the Contractor to whom information may be made available or disclosed shall be notified in writing by the Contractor that such information may be disclosed only for a purpose and to the extent authorized herein.
PAYMENTS FOR UNAUTHORIZED WORK
No payments will be made for any unauthorized supplies/services or for any unauthorized changes to the work specified in this PWS; this includes any services performed by the Contractor of their own volition or at the request of an individual other than a duly appointed Contracting Officer. Any additional work to be performed beyond the terms of this PWS must be approved by a Contracting Officer in writing prior to the commencement of such work; thus only a duly appointed Contracting Officer is authorized to change the specifications, terms, and conditions under this effort.
10.1 INVOICING AND PAYMENT SCHEDULE
The invoice shall be submitted no more than once a month. The invoice should include the specific performance standards performed and accepted, and associated performance payments being invoiced for the month. Invoices are to be sent directly to the COR electronically at the address included in this PWS. Within seven days of the receipt of the invoice, the COR will review for accuracy and payment will be certified in the WAWF system by the CO or COR. The requirements of a proper invoice are subject to FAR 52.232‐25 - Prompt Payment. The vendor may check on the status of their invoice(s) by registering for My Invoice at https://myinvoice.csd.disa.mil/ or contacting DLA at
(800) 756-4571.
The following correct information constitutes a proper invoice per the Prompt Payment Act standards, and/or is required documentation for payment requests submitted electronically into the Wide Area Work Flow (WAWF) System - Hard copy invoices cannot be accepted.
(1) Name and Address of Contractor or Vendor
(2) Invoice date
(3) Contract number (including the order/call number where applicable), or other authorization for delivery of goods or services. Note: DO NOT USE THE BID OR SOLICITATION NUMBER.
(4) Invoice number, account number, and/or any other identifying number agreed to by contract.
(5) Shipment Number, including the date (where applicable). Same as Block 2 of the DD Form 250.
(See “Shipment Number Construction and Usage”, page 13 for format).
(6) Description: line item number, National Stock Number, Manufacture’s Part Number, unit of measure, quantity shipped, unit price, and extended amount, where applicable.
(7) Shipping and payment terms (unless mutually agreed that this information is only required in the contract); including terms of any discount for prompt payment offered.
(8) Electronic Funds Transfer (EFT) banking information, unless agency procedures provide otherwise, or except in situations where the EFT requirement is waived under 31 CFR 208.4.
(9) Point of Contact (POC) name (where practicable), title and telephone number of person to notify in the event that the invoice is defective.
(10) Other substantiating documentation or information required.
The contractor’s failure to include the necessary information will result in invoices being rejected.
a. Back up documentation (such as timesheets, receiving reports etc.) can be included and attached to the invoice in WAWF. Attachments created in any Microsoft Office product are attachable to the invoice in WAWF. Maximum size limit of each attachment is 2 Megabytes (MB).
Total size limit for all files is 5MB.
b. After clicking the “submit” button, a Notice of Successful/Unsuccessful Submission will appear. This screen contains a “Send More E‐Mail Notifications” button. Click on this button and add the email addresses for the Program Office and others as desired. Notification shall be provided for each invoice submitted.
(11) WAWF Tools and Help
a. The vendor may have their CAGE code activated (required only first time) in WAWF by calling 866‐618‐5988. Once activated, the vendor should self‐register at the web site https://wawf.eb.mil.
b. Vendor training is available at: http://www.wawftraining.com. Additional support can be obtained by calling the DISA Ogden Help Desk at 1‐866‐618‐5988 or e‐mailing to cscassig@ogden.disa.mil.
(12) WAWF Vendor “Quick Reference” Guides are located at:
https://acquisition.navy.mil/rda/home/acquisition_one_source/ebusiness/don_ebusiness_soluti ons/wawf_overview/vendor_information.
11. PERSONNEL AND RELATED REQUIREMENTS FOR CONTRACTOR EMPLOYEES
Contractor personnel shall present a neat appearance and be easily recognized as Contractor employees by wearing a Security Identification Badge at all times above the waist while on Government premises. When Contractor personnel attend meetings, answer phones, and work in other situations where their status is not obvious to third parties they must identify themselves as such to avoid creating the impression that they are Government employees.
12. PERIOD OF PERFORMANCE
The period of performance shall be for one (1) Base Period of 12-months and two (2) 12-month Option Periods.
12.1 HOURS OF OPERATION
The Contractor shall provide personnel to be stationed at DSCR location Monday through Friday. It is required for the Contractor to provide coverage during the hours of 6:00 a.m. through 6:00 p.m. In addition, coverage may be required to respond to pager beyond these hours. In addition, weekend and/or evening hours (during the week) will be necessary to provide support for software deployment, mass updates, or emergency support when those actions are deemed necessary by the COTR to limit system impact. All deviations to the normal workday/workweek will be approved in writing by the project lead prior to occurrence by the COR.
13. PLACE OF PERFORMANCE
Place of performance will be DSCR located at 8000 Jefferson Davis Hwy, Richmond, VA 23297 Richmond, Virginia.
14. ADMINISTRATIVE CONSIDERATIONS
To promote timely and effective administration, correspondence will be subject to the following procedures:
a) Technical correspondence (where technical issues relate to compliance with the requirements herein) will be addressed to the PM with an information copy to the COR.
b) All other correspondence, including invoices, (that which proposes or otherwise involves waivers, deviations or modifications to the requirements, terms or conditions of this PWS) will be http://www.wawftraining.com/ mailto:cscassig@ogden.disa.mil mailto:cscassig@ogden.disa.mil addressed to the COR with an information copy to the COTR.
c) Within 10 days of contract award, the COR, in conjunction with the COTR and Contractor will hold an initial startup meeting to discuss administrative contract matters.
15. POINTS OF CONTACT
15.1 CONTRACTING OFFICER
TO BE DETERMINED
15.2 CONTRACTING SPECIALIST
TO BE DETERMINED
15.3 CONTRACTING OFFICER REPRESENTATIVE (COR)
TO BE DETERMINED
16. TECHNICAL EXHIBIT 3 ESTIMATED WORKLOAD DATA
Not Applicable
17. DEFINITIONS & ACRONYMS
CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the KO to administer the contract. Such appointment shall be in fair writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
DELIVERABLE. Anything that can be physically delivered, but may include non- manufactured things such as meeting minutes or reports
KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
When Key Personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have authority to privity of contract with the Subcontractor.
WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract WORK WEEK. Monday through Friday, unless specified otherwise.
ACRONYMS
ACGIH American Conference of Industrial Hygienist ANSI American National Standards Institute CFR Code of Federal Regulations COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DEQ Department of Environmental Quality DLA Defense Logistics Agency DOD Department of Defense ECC Emergency Communication Center EMS Emergency Medical Services EPA Environmental Protection Agency FAR Federal Acquisition Regulation KO Contracting Officer MSDS Material Safety Data Sheet NEC National Electric Code NFC National Fire Codes NFPA National Fire Protection Association NIOSH National Institute for Occupational Safety and Health OSHP Occupational Safety and Health Plan POC Point of Contact PWS Performance Work Statement SPCC Spill Prevention Control Countermeasure TE Technical Exhibit VAC Virginia Administrative Code VCIN Virginia Criminal Information Network VO Vetting Official VOSH Virginia Occupational Safety and Health VPDES Virginia Pollution Discharge Elimination System VPP Voluntary Protection Program II
18. APPLICABLE PROVISONS
DLAD 37.103(e)
CONTRACTOR MANPOWER REPORTING LANGUAGE FOR
CONTRACT PERFORMANCE WORK STATEMENTS
and Related Background Information
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site.
The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil.
Common Access Card (CAC) Procedures
Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor shall complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to control and account for contractor CACs at all times. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.
1. The contractor has each contractor employee requiring a CAC complete and sign Sections I and II of the DD Form 1172-2. The instructions for completing the DD Form 1172-2 are located at http://www.cac.mil/docs/1172-2-Instructions.pdf.
o For Section II, Block 22 - If the contractor employee signs and the DD Form 1172-2 it is then forwarded by the contractor. This provides verification for the employee information. If the contractor is submitting a DD Form 1172-2 for him/herself (e.g., the owner), with no higher authority above them for verification, then the signature in Block 22 must be notarized to verify identity.
2. The contractor forwards the DD Form(s) 1172-2 via hand-carry, secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group):
o The Contracting Officer’s Representative (COR) for the contract, if a COR was designated.
o The Contracting Officer (CO) for the contract, if no COR was designated.
3. Each contractor employee must verify his/her account information upon receipt of an email from the Government containing a username and password for the Trusted Associate Sponsorship System (TASS). The web link for TASS is included in the email.
4. Each contractor employee will receive an email via TASS when his/her account has been approved. The email will notify the employee to obtain a Government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.
5. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.
6. The contractor, within one (1) business day of issuance, provides written notice via email to the COR (or the CO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date http://www.cac.mil/docs/1172-2-Instructions.pdf of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees.
7. The contractor establishes procedures to control and account for Government-issued contractor CACs at all times, to include the following:
o Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.
o Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.
o Ensure contractor employees do not abuse or place holes in their CACs.
o Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
o The contractor employee shall immediately notify the contractor that the contractor CAC has been lost or stolen.
o The contractor shall immediately notify the COR (or the CO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:
In person, followed within one (1) business day by a written notice via email, or In writing, via email, or By telephone, followed within one (1) business day by a written notice via o The contractor shall report the lost or stolen CAC card to the local DLA Police/host installation police, who will provide the contractor a police report. If there is no local DLA Police/host installation police, or no police report is provided, the contractor shall provide information to the COR/CO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/CO will provide a memorandum for the contractor employee to support issuance of new CAC.
o The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is prior to completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:
o Notifies the COR as follows:
In person, followed within one (1) business day by a written notice via email, or
In writing, via email, or By telephone, followed within one (1) business day by a written notice via o No less than two (2) weeks prior to the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.
o Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.
o Notifies the COR once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via hand-carry, to the nearest Federal law enforcement office.
11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:
o Contract completion or termination o Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC)
12. The contractor:
o For contract completion or termination – within one (1) business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:
i. If the COR/CO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:
• Arranges to meet the COR (or the CO, if no COR was designated) to turn-in the collected contractor CAC(s).
• Hand-carries all collected contractor CACs for turn-in to meet the COR (or the CO, if no COR was designated).
• Completes and signs the Government-Issued Contractor CAC Turn-In Receipt with the COR (or the CO, if no COR was designated). The contractor is provided a copy of the receipt.
ii. If in-person transfer of CAC cannot be arranged, the contractor:
• Sends, via certified mail, the CACs to the COR/CO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.
• Notifies COR/CO that CACs have been sent via certified mail.
• Receives a completed copy of the receipt from the COR/CO once the COR/CO has received the CACs.
o For termination/reassignment of an employee:
i. Immediately notifies the COR (or the CO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email.
ii. Follows the turn-in procedures above for contract completion or termination, as applicable.
Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to the COR (or the CO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC. The report must note where changes have occurred (additions or deletions) since the previous month. Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the COR/CO when the individual is no longer working under the subject contract.
The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:
o Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue o Disapproval of invoices and delay of payment o Withholding of final payment (in accordance with FAR 52.204-9) o Documentation of CAC Non-Compliance in the Contractor Performance
Assessment Reporting System (CPARS)
ATTACHMENT 1: SAFETY AND HEALTH REQUIREMENTS
Contractors shall comply with all federal, state, and local occupational safety and health regulations, such as but not limited to US Department of Labor and Industry Occupational Safety and Health Administration (OSHA) , 29CFR 1910,1926 1960, or whichever is applicable; in addition to safety requirements of US Army Corps of Engineers EM385-1-1 (latest edition), National Electric Codes (NEC), National Fire Codes (NFC), Defense Logistics Agency (DLA) safety regulations, or other safety requirements as established for the life of the contract. The safety provisions listed above are only general in nature and not intended to be all inclusive.
1.1 VOLUNTARY PROTECTION PROGRAM (VPP)
The Defense Supply Center, Richmond is committed to becoming an OSHA Voluntary Protection Program (VPP) site. Contractors shall comply with all OSHA rules and regulations as applicable in addition to all other Local, State and Federal Occupational Safety and Health Regulations. The objective is for all contractors to be familiar with VPP and abide by the Defense Supply Center Richmond Safety Requirements.
DELIVERABLE
Contractors and subcontractors shall adhere to all safety and health regulations and be aware of The Defense Supply Center OSHA VPP initiative. Contractors and subcontractors shall read the Visitor & Contractor Safety at Defense Supply Center Richmond Brochure prior to performance of any on- site work. This is a one-time process but should be completed for all new contractors. Contractors shall acknowledge and document that all Contractor and subcontractor employees have read the Visitor & Contractor Safety at Defense Supply Center Richmond Brochure by completing the acknowledgment form. Contractors and subcontractors shall document receipt of a physical copy of the Visitor & Contractor Safety at Defense Supply Center Richmond Brochure by detaching the tear- off and leaving it with the COR or KO who, in return, will forward it to the Occupational Safety and Health Office before coming on site.
1.2 SAFETY PLAN
DELIVERABLE
The Contractor shall submit a site specific Occupational Safety and Health Plan (OSHP) for approval prior to the commencement of any on-site work for this SOW. Failure to submit an OSHP will delay contracted activities. All site specific OSHP shall be developed to comply with all federal, state, and local occupational safety and health regulations, consensus standards, and any trade specific practices which will include but not limited to the following; Occupational Safety and Health Administration (OSHA) 29 CFR General Industry - 1910, Construction Standards – 1926, Federal Employee – 1960; Army Corps of Engineers EM385-1-1 manual; National Electric Codes (NEC);
National Fire Protection Association (NFPA) Codes; American Conference of Industrial Hygienist (ACGIH); and must at a minimum, be strictly adhered to by all contracted personnel.
An OSHP will be required for all contracted services involving the construction, alteration, and/or repair, including painting or decorating of government buildings, public works, and equipment in addition to all activities using/applying products requiring safety data sheets (formerly material safety data sheets (MSDS)). OSHPs will also be required for all activities were there are potential health hazards which could be a result of the contracted services (ie. hazardous material surveys and clean-up, confined space entry, etc.). All contractors who are subjected to the submittal of OSHP shall also submit their most recent OSHA 300 log in accordance with 29 CFR 1904. An OSHP will not be required for non-personal services contracts including, but not limited to, those which are administrative only, deliveries/pickups, transportation or for nondestructive surveys. However, if contracted services specify a DSCR provided workspace the contractor should submit an OSHP or provide their COR and/or COTR with a letter stating that they will adopt and operate under DSCR's written occupational safety and health control programs. For all non-personal service contracts not requiring an OSHP, please adhere to the Visitor and Contractor Safety Brochure which can be obtained from the COR and/or COTR. Please contact the Occupational Safety and Health office at 804-279-4830 if you need assistance in determining if your contracted services apply to an OSHP submittal.
All Contracted services requiring an OSHP where operations involving demarcating work areas with protective coverings, shields, protective barriers, barricades, warning signs and the like, will be furnished and installed by the Contractor where a hazard or potential hazard exists. Notices shall be provided twenty-four (24) hours prior to the planned installation of protective barriers and barricades, the Contractor will coordinate with the COR and/or COTR for concurrence. Barricades and barriers will be removed by the Contractor at the completion of the work in the area.
1.3 ACCIDENT/INCIDENT
The Contractor shall notify the KO or his/her designated representative immediately after the occurrence of any incident resulting in injury, illness, or death in addition to major property damage to a Government facility. The Contractor shall comply with the following Mishap Reporting section for reporting all incidents.
1.4 INJURY TREATMENT
Emergency Medical Services (EMS) is available for Contractor employees at DSCR. Emergency calls on the DSCR Installation, are made by dialing 911 on the Center telephone system or 804-279- 3131 from personal cellphones or from outside the DSCR Installation. If a private ambulance service is used on the DSCR Installation, the Contractor must coordinate with the DSCR Installation Emergency Communication Center (ECC) by calling 804-279-4888. The Contractor shall be responsible for all expenses incurred due to use of private ambulance service.
1.5 MISHAP REPORTING
A report on each job connected injury, property damage, or motor vehicle mishap will be written by the Contractor and submitted to the CO or his/her designated representative. The Contractor and CO or his/her designated representative will complete the Mishap Report (DLA form 1591) per DSCR guidelines. The estimated absence in days, if any, by employee due to injury and/or cost or property or vehicle damages shall be included.
1.6 SAFETY AND HEALTH VIOLATIONS
The Army Corps of Engineers Manual EM 385-1-1, Safety and Health Requirements Manual, 29 CFR 1910/1926/1960, General Industry/Construction Standards/Federal Employee (OSHA), National Electric Code (NEC) and National Fire Protection Association (NFPA) Codes, American Conference of Industrial Hygienist (ACGIH) must, at a minimum, be strictly adhered to by all contractors. After consultation with the contracting officer, the Installation’s Safety and Health Manager reserves the right to contact the Virginia Occupational Safety and Health (VOSH) Office for assistance if there are frequent safety and health violations by contractors.
DSCR Safety Specialists or Industrial Hygienists shall perform unannounced inspections of Contractor job sites to ensure compliance with applicable standards. Violations shall be reported to the CO, or his/her authorized representative. The Safety Specialist or Industrial Hygienist reserves the right to stop operations when violations could cause severe injury, death, and/or serious property damage. The Safety Specialist or Industrial Hygienist reserves the right to stop any activity where DSCR employees are impacted. Frequent safety violations shall be reported to the Virginia Occupational Safety and Health (VOSH) Office.
The DSCR Safety and Health Manager or Staff shall be available to provide technical assistance as required and may be contacted by calling (804) 279-4830 from a cell phone or extension 4830 from a Government phone.
ATTACHMENT 2: ENVIRONMENTAL REQUIREMENTS
2.0 COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS
Contractor shall comply with all applicable federal, state, local, DLA, and DSCR environmental laws, statutes, regulations, executive orders, permits. Contractor shall immediately report any conflicts between applicable federal, state, local, DLA and DSCR, and any specifications within this contract to the COR and the DLA Installation Management at Richmond, Environmental Office.
2.1 COMPLIANCE WITH ALL FEDERAL ACQUISITION REGULATIONS PROVISIONS
Contractor shall comply with all Federal Acquisition Regulation provisions and/or clauses 52.223-3 Hazardous Material Identification and Material Safety Data; 52.223-5 Pollution Prevention and Right-to-Know Information; 52.223-7 Notice of Radioactive Materials; 52.223-9 Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Products; 52.223- 10 Waste Reduction Program; 2.223-11 Ozone-Depleting Substances; and 52.223- 14 Toxic Chemical Release Reporting.
2.2 COMPLIANCE WITH GREEN PROCUREMENT REQUIREMENTS
Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials; recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.
2.3 REPORTING NONCOMPLIANCE
Contractor shall immediately report any nonconformance and/or noncompliance with applicable federal, state, local, DLA and installation environmental regulations and laws to the COR and Environmental Office. Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.
2.4 CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEM
Contractor shall take the necessary actions to identify, monitor, and control those contract operations and activities that pose risk of contamination, or can negatively impact the natural and/or human environment.
2.5 PROTECTION OF WORK SITE RESOURCES
Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Contractor shall notify the Environmental Office if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted by the Environmental Office.
2.6 PREVENTION OF SPILLS
Contractor shall develop, maintain, and post at the work site a written site-specific Spill Response Plan if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils- lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders;
http://www.epa.gov/cpg) contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department) for assistance (804-279-3131).
Contractors storing any oil-based product in an aboveground storage tank at a construction site shall develop a Spill Prevention Control Countermeasure (SPCC) Plan and present such plan to the Environmental Office prior to placement. Immediately respond to actual emergencies and accidents, prevent or mitigate associated adverse environmental impacts, and contact the installation Fire and Emergencies Services at 804-279-3131.
2.7 COMPLIANCE WITH LICENSES AND CERTIFICATION REQUIRMENTS
Not Applicable
| BACKGROUND |
| OBJECTIVES |
| DOCUMENTATION AND RECORDS |
| SPECIFIC TASKS |
| 6. SECURITYREQUIREMENTS INSTALLATION SECURITY |
| SAFETY AND HEALTH REQUIREMENTS |
| ENVIRONMENTAL REQUIREMENTS |
| DISCLOSURE OF INFORMATION |
| PAYMENTS FOR UNAUTHORIZED WORK |
| 10.1 INVOICING AND PAYMENT SCHEDULE |
| 11. PERSONNEL AND RELATED REQUIREMENTS FOR CONTRACTOR EMPLOYEES |
| 12. PERIOD OF PERFORMANCE |
| 12.1 HOURS OF OPERATION |
| 13. PLACE OF PERFORMANCE |
| 14. ADMINISTRATIVE CONSIDERATIONS |
| 15. POINTS OF CONTACT |
| 15.1 CONTRACTING OFFICER |
| 15.2 CONTRACTING SPECIALIST |
| TO BE DETERMINED |
| 15.3 CONTRACTING OFFICER REPRESENTATIVE (COR) |
| TO BE DETERMINED |
| 16. TECHNICAL EXHIBIT 3 ESTIMATED WORKLOAD DATA |
| ACRONYMS |
| ATTACHMENT 1: SAFETY AND HEALTH REQUIREMENTS |
| 1.1 VOLUNTARY PROTECTION PROGRAM (VPP) |
| 1.2 SAFETY PLAN DELIVERABLE |
| 1.3 ACCIDENT/INCIDENT |
| 1.4 INJURY TREATMENT |
| 1.5 MISHAP REPORTING |
| 1.6 SAFETY AND HEALTH VIOLATIONS |
| ATTACHMENT 2: ENVIRONMENTAL REQUIREMENTS |
| 2.0 COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS |
| 2.1 COMPLIANCE WITH ALL FEDERAL ACQUISITION REGULATIONS PROVISIONS |
| 2.2 COMPLIANCE WITH GREEN PROCUREMENT REQUIREMENTS |
| 2.3 REPORTING NONCOMPLIANCE |
| 2.4 CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEM |
| 2.5 PROTECTION OF WORK SITE RESOURCES |
| 2.6 PREVENTION OF SPILLS |
| 2.7 COMPLIANCE WITH LICENSES AND CERTIFICATION REQUIRMENTS |
File details come from the government source that posted it. Updated .