PWS Galena Landfarm Monitoring 19 April 2024.pdf
PDF 307 KB Posted
- Solicitation number
- Not on record
About this file
This document is a Performance Work Statement (PWS) for Landfarm Monitoring and Maintenance at the former Galena Forward Operating Location (FOL) in Galena, Alaska. The PWS outlines the requirements for a Firm Fixed Price task order to be awarded to an 8(a) small business for environmental monitoring, maintenance, and reporting services at the former Galena FOL landfarm.
Key details include: a period of performance from date of award through November 2024; requirements for the contractor to use local labor and resources, and ensure all on-site workers have appropriate HAZWOPER training; the contractor's responsibility to provide all materials, supplies, and equipment; and the requirement to handle all hazardous materials and waste in accordance with regulations. The PWS also specifies key tasks such as completing the 2023 Landfarm Operations Report, draining and filtering the landfarm detention basin, inspecting and maintaining the landfarm through 2024, and demobilizing. All report versions will be subject to AFCEC and ADEC review and comment resolution. This PWS is part of a related federal contract opportunity with a sources sought notice response due by July 12, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8903-24-C-XXXX
GALENA REGION
19APRIL 2024
PERFORMANCE WORK STATEMENT (PWS)
FOR
LANDFARM MONITORING AND MAINTENANCE
AT
FORMER GALENA FORWARD OPERATING LOCATION, GALENA, ALASKA
CONTRACT NUMBER: FA8903-20-D-0026/FA8903-24-F-XXXX
19 April 2024
19APRIL 2024
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 SCOPE
1.2 KEY DOCUMENTS
2.0 PROJECT ADMINISTRATION
2.1 MANAGEMENT, PLANNING, AND REPORTING REQUIREMENTS
2.2 PROJECT WEBSITE
2.3 CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT (CPSMR)
2.4 Meeting/Teleconference Support
2.5 Notification Requirements
2.6 WORK SITE COORDINATION
3.0 TASK ORDER REQUIREMENTS
3.1 COMPLETION OF THE FINAL 2023 LANDFARM OPERATIONS REPORT, FORMER GALENA
FORWARD OPERATING LOCATION, ALASKA DOCUMENT
3.2 LANDFARM DETENTION BASIN WATER DRAINAGE AND FILTRATION THROUGH GAC
3.3 INSPECTION, MAINTENANCE, AND REPORTING FOR THE FORMER GALENA FOL
LANDFARM THROUGH THE 2024 FIELD SEASON
3.4 DEMOBILIZATION
4.0 CONTRACTOR MANPOWER REPORTING REQUIREMENTS
4.1 CONTRACTOR MANPOWER REPORTING
19APRIL 2024
1.0 INTRODUCTION
1.1 Scope
This BRAC Environmental Construction and Optimization Services (BECOS) contract includes the monitoring and maintenance of the former Galena Forward Operating Location (FOL) landfarm located on the former Campion Air Force Station airstrip. The landfarm is to remain closed during the 2024 season. This TO provides for the completion of the Final 2023 Landfarm Operations Report; landfarm detention-basin water drainage and filtration through granulated activated carbon (GAC); continued monitoring, maintenance, and reporting for the landfarm through the 2024 field season, and demobilization.
This PWS encompasses the support activities necessary to perform environmental services at the former Galena FOL Landfarm. General scope requirements for this TO include:
• Project Period of Performance (POP): Date of award through 30 November 2024.
• Due to the remoteness of the site, to the maximum extent possible, the Contactor shall use local labor and resources to perform field activities.
• All on-site workers (Contractor and subcontractor) performing hazardous operations, including working with hazardous materials, must have completed the OSHA 1910.120 Hazardous Waste Operations and Emergency Response (HAZWOPER) training and/or other applicable training, plus annual refresher courses.
• The Contractor is responsible for providing all other materials, supplies and equipment, not already installed or incidental to the place of performance, required to meet the objectives specified in this TO.
• The Contractor shall handle all hazardous materials and waste in accordance with applicable federal, state, and local requirements. The Contractor shall provide all hazardous materials use and hazardous waste disposal documentation to the AFCEC
BEC.
• All report versions (working copy, draft, draft final, final) will be subject to AFCEC review and response to comments preparation and resolution.
• All draft final and final reports will be subject to Alaska Department of Environmental Conservation (ADEC) review and response to comments preparation and resolution.
1.2 Key Documents
Key documents containing historical site information and standard operating procedures for landfarm monitoring and maintenance are included in the table below.
Key Documents Entry
No. Document Title Location Date Issued
1.
Final Addendum 3 to the UFP-QAPP, Revision 1
AR 628837 March 2023
2.
Final Landfarm Operation, Maintenance, and Monitoring Plan
AR 628847 June 2023
19APRIL 2024
Entry No. Document Title Location Date Issued
3.
2022 Landfarm Operations Report (most recent iteration)
NA NA
4.
2023 Landfarm Operations Report (most recent iteration)
NA NA
2.0 PROJECT ADMINISTRATION
2.1 Management, Planning, and Reporting Requirements
The Contractor shall implement environmental monitoring and maintenance services as required to meet the objectives of this TO and in accordance with all applicable documents. The Contractor shall supply all labor, equipment, and materials necessary to accomplish the work.
The Contractor shall perform management and planning functions, including performance measurement through the course of this effort.
2.2 Project Website
The Contractor shall utilize the existing project website to support management of this TO.
(CDRL A001A)
2.3 Contractor’s Progress, Status, and Management Report (CPSMR)
The Contractor shall prepare and submit a monthly CPSMR. The CPSMR shall be used to review and evaluate the overall progress of this TO, along with any existing or potential problem areas. The CPSMR shall include a summary of the events that occurred during the reporting period, discussion of performance, identification of problems, proposed solutions, corrective actions taken, outstanding issues, and projected tasks such as field work, reporting, et cetera, occurring in the next 90 days. (CDRL B001, B003)
2.4 Meeting/Teleconference Support
The Contractor shall participate in a post-award teleconference and biweekly TO status teleconferences with the Air Force. (CDRL B006, B007, B008)
2.5 Notification Requirements
The Contractor is required to notify the CO and COR of critical issues that may affect the TO performance and/or human health and the environment. The types of issues that require notification include, but are not limited to, health and safety risks, spills, Notices of Violation (received or anticipated), and changes in key personnel. On critical issues, verbal notification shall be made immediately, followed by written notification within three working days. (CDRL A003, A004)
19APRIL 2024
2.6 Work Site Coordination
The Contractor shall coordinate worksite activities with all applicable personnel and/or agencies to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions.
The Contractor shall ensure all work areas are secure and appropriate measures have been taken to eliminate any risk to the public on active environmental sites, as appropriate. The Contractor must comply with OSHA safety and health regulations and local safety office requirements.
(CDRL A004)
3.0 TASK ORDER REQUIREMENTS
The Contractor shall perform a full range of activities to meet the environmental monitoring and maintenance services required to meet the objectives of this TO.
3.1 Completion of the Final 2023 Landfarm Operations Report, Former Galena Forward
Operating Location, Alaska Document
• It is anticipated that the Final 2023 Landfarm Operations Report, Former Galena Forward Operating Location, Alaska document will not be finalized by the time the previous TO ends. This TO includes finalizing the report, including addressing all Air Force comments, regulator comments, and submitting revised draft, draft final, and final versions as appropriate. (CDRL A001, A003, A005, A006, A012, B005A, B005B)
• The Contractor shall manage response to comment time to ensure this document is final before the expiration of the POP; no later than 30 November
2024. (CDRL B001)
3.2 Landfarm Detention Basin Water Drainage and Filtration Through GAC
• Shortly following snow melt/ ice off, the landfarm detention basin shall be drained and the discharge filtered through a portable GAC system. The discharge point for the filtered water shall be to the west of the detention basin, in the drainage that parallels Campion Road.
• Based upon the approximate maximum volume of the basin (252,450 gallons) and an estimated maximum concentration of 570 micrograms per liter (μg/L) diesel-range organics (DRO) and 710 μg/L residual-range organics (RRO) in the detention-basin water, it is expected two 55-gallon drums of GAC plumbed in series will be sufficient to filter out petroleum-related contaminants remaining in the detention-basin water.
• During discharge and filtration operations, and after approximately 200,000 gallons have been filtered, one grab sample shall be collected from the effluent discharge point and analyzed for volatile organic compounds (VOCs), gasoline-range organics (GRO), DRO, RRO, and polyaromatic hydrocarbons (PAHs) by Methods SW8260C, AK101, AK102, AK103, and SW8270D, respectively; to document petroleum contamination was removed from the
19APRIL 2024
detention-basin water prior to being released. (CDRL A012)
• Based upon the functional depth of the detention basin (3 ft) and the average annual rainfall (approximately 13 inches) in Galena, AK, it is expected that the basin will not require additional dewatering throughout the remainder of the 2024 field season. Therefore, the GAC canisters shall be removed from the site and transported off-site for proper disposal or regeneration. (Following the initial dewatering of the detention basin, if the basin were to overflow as a result of precipitation, the water will have originated directly from precipitation and not drainage from the landfarm soils and would not have encountered petroleum contamination.)
• The detention basin dewatering is to be completed by 15 July 2024, at the latest.
• The Contractor shall provide daily reports and photographs of the dewatering and filtration process and, upon completion of the task, summarize the activities in a letter report for submittal to and approval by the AFCEC BRAC Environmental Coordinator (BEC). (CDRL A001, A003, A004)
3.3 Inspection, Maintenance, and Reporting for the Former Galena FOL Landfarm
Through the 2024 Field Season
• The Contractor shall maintain the “winterized” state of the former Galena FOL landfarm through the 2024 field season. This shall require biweekly monitoring of the landfarm treatment area and stockpiles to ensure tarps have not been displaced; preventing precipitation from encountering petroleum-contaminated soils. The biweekly monitoring will include identification of any issues/areas of concern; i.e., sandbag displacement or deterioration, tarp movement, water ponding, et cetera.
• Biweekly monitoring will continue to be performed until a minimum of 8 inches of snow has deposited on the landfarm treatment area and stockpiles or expiration of the TO POP, whichever comes first. As with years past, the accumulated snow will secure the tarps for the winter season.
• Supplemental monitoring inspections shall be performed within 24 hours following episodes of high winds or heavy precipitation (greater than 1.0 inch in a 24-hour period).
• The northeast corner of the landfarm that currently allows precipitation runoff shall remain in the “winterized” state; allowing drainage of precipitation without encountering petroleum contaminated soils.
• If the landfarm is compromised, resulting in precipitation encountering petroleum-contaminated soil prior to draining out the northeast corner of the landfarm treatment area or from an exposed stockpile, a surface soil sample shall be collected immediately adjacent to the location of the discharge point and analyzed for VOCs, GRO, DRO, RRO, and PAHs by Methods SW8260C, AK101, AK102, AK103, and SW8270D, respectively. Sample collection, handling, and analysis shall conform to the approved Final Landfarm Operation, Maintenance, and Monitoring Plan (FPM, 2023). (CDRL A0012)
19APRIL 2024
• Within three working days of each biweekly landfarm inspection, the Contractor shall provide a field report, including photographs, and, upon completion of the 2024 field season, summarize the activities in a letter report for submittal to and approval by the AFCEC BEC. To allow for completion of the letter report prior to the POP expiration, the Contractor will likely have to initiate development of the summary report prior to the November 2024 inspections. The finalized summary report shall be completed by no later than 30 November 2024. (CDRL A001, A003, A004, A005, A006, A012, B005A, B005B)
• The AFCEC BEC shall be notified within 24 hours, if any issues of concern are identified during the landfarm monitoring inspections. (CDRL A003)
3.4 Demobilization
• As early as practicable during the 2024 field season, the Contractor shall remove all equipment, materials, and supplies from the landfarm area and demobilize from the site. Demobilization activities should be performed early enough in the season to avoid inclement weather or snow cover, i.e., before late August 2024.
• All Air Force equipment associated with the landfarm (e.g., irrigation equipment) shall be transported from the former Campion Air Strip to a location in the Galena triangle area to be specified by the AFCEC BEC at a later date.
4.0 CONTRACTOR MANPOWER REPORTING REQUIREMENTS
4.1 Contractor Manpower Reporting
The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this TO for the AF via a secure data collection site. The Contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September.
While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year.
http://www.ecmra.mil/
| 1.0 Introduction |
| 1.1 Scope |
| 1.2 Key Documents |
| 2.0 Project Administration |
| 2.1 Management, Planning, and Reporting Requirements |
| 2.2 Project Website |
| 2.3 Contractor’s Progress, Status, and Management Report (CPSMR) |
| 2.4 Meeting/Teleconference Support |
| 2.5 Notification Requirements |
2.6 Work Site Coordination
| 3.0 task order REQUIREMENTS |
| 3.1 Completion of the Final 2023 Landfarm Operations Report, Former Galena Forward Operating Location, Alaska Document |
| 3.2 Landfarm Detention Basin Water Drainage and Filtration Through GAC |
| 3.3 Inspection, Maintenance, and Reporting for the Former Galena FOL Landfarm Through the 2024 Field Season |
| 3.4 Demobilization |
| 4.0 CONTRACTOR MANPOWER REPORTING REQUIREMENTS |
| 4.1 Contractor Manpower Reporting |