PWS for SAT Cameras Ver. 2.docx

DOCX document 698 KB Posted

Attached to
INL Guatemala CCTV Configuration and Installation
Solicitation number
191NLE25I0014
Issued by

About this file

This Performance Work Statement (PWS) details a contract for the United States Department of State Bureau of International Narcotics and Law Enforcement Affairs (INL) to replace the existing CCTV system for the Guatemalan Customs Agency (SAT). The project requires replacing 162 cameras across 11 Interagency Highway Checkpoints (PCIs) and 15 Ports of Entry (POEs) throughout Guatemala, with a focus on improving border security and intelligence gathering capabilities.

The contract scope includes designing, installing, and configuring a new stand-alone, IP-based, high-definition video surveillance system compatible with SAT's infrastructure. Key requirements include providing new cameras, hardware, and software, training SAT IT personnel, offering six months of technical support, and providing a three-year equipment warranty. The period of performance is 120 days, with work to be completed region by region. The project aims to enhance border security by creating an interconnected surveillance system that allows the INL Border Command Center to monitor and analyze passenger and cargo movements at strategic entry points.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of State Bureau of International Narcotics and Law Enforcement Affairs

PERFORMANCE WORK STATEMENT

Replacement of CCTV system for Guatemalan Customs Agency in the INL supported checkpoints and land port of entries.

Section 1 – Description of Services
Section 2 – Service Delivery Summary
Section 3 – General Information
Section 4 – Special Clauses and Considerations
Section 5 – Appendices

SECTION 1

DESCRIPTION OF SERVICES

1. GENERAL: This is a non-personnel services contract to design, replace, install, configure and test a stand-alone, turn-key installation of a stand-alone, IP-based, high-definition, day and night commercial video assessment system.

1.1. INTRODUCTION

This is a Department of State Bureau of International Narcotics and Law Enforcement Affairs (INL) supported initiative to combat illegal trafficking of people and goods and curb the flow of dangerous narcotics to the United States. INL requires the herein described services to provide a solution to remove and install new surveillance cameras and to provide interconnectivity between a Guatemala City-based border command center and INL-supported checkpoints and Guatemala’s land ports of entry. This will give U.S. vetted units working at the INL Border Command Center/fusion center the capacity to develop intelligence and launch border security operations to secure Guatemalan borders. The INL-supported border command center and Guatemalan customs (SAT) will have access to this new closed-circuit television (CCTV) with live video system from INL-sponsored Interagency Highway Checkpoints (IHCs and/or PCIs) and Land Ports of Entries (POEs) nationwide.

1.2. BACKGROUND

INL Guatemala provides targeted support to improve the operational capabilities of the Guatemala Customs Agency (SAT), thereby improving the effectiveness of immigration and customs controls at Guatemala's official entry points. This support has included the creation of 10 interagency highway checkpoints at strategic locations through Guatemala. INL Guatemala also supports SAT efforts to better manage its land border entries, including investments in infrastructure and technology. INL Guatemala is now in the process of setting up a Border Command Center (BCC) in Guatemala City and aims to create a technological platform to target and analyze passengers and cargo transiting INL checkpoints and all official POEs.

1.3. SCOPE

This performance work statement defines the effort required by the Contractor to design, replace, install, configure and test a stand-alone, turn-key installation of a stand-alone, IP-based, high-definition, day and night CCTV. The location of the work shall be performed in the list of PCIs and POEs located throughout Guatemalan territory.

The Contractor shall:

· Change 162 camaras that are distributed in 11 PCIs and 15 POEs.

· Change the hardware for CCTV storage and software for the camaras and storage system to be compatible with SAT systems.

· Train SAT IT personnel on how CCTV will work and how the information is set up from the camaras, storage systems, switches; and how all this is connected to SAT HQ.

· Give technical and IT support to SAT for six months after the final reception of the complete project.

· Provide maintenance services on all equipment. The maintenance services shall be performed at least every 6 months and submit a report after each maintenance cycle. The report shall include, locations, equipment, dates and services performed. The service shall include at least cleaning and testing of all equipment.

· Provide in written, a 3-year warranty on all equipment installed. The warranty shall include the replacement of any damaged equipment detected during the service cycles or directly informed by SAT personnel and checked by vendor’s personnel.

Provide the capacity for the BBC to be able to monitor and have access to the SAT CCTV system which includes the 162 camaras that include this PWS The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the CCTV replacement and configuration as defined in this Performance Work Statement. The Contractor shall be responsible for providing and installing all miscellaneous ancillary hardware not explicitly specified as required for a complete and fully operational system. The systems shall include all connectors, adapters, and terminators necessary to interconnect all equipment. The contractor shall also supply all cabling and conduit necessary to interconnect the CCTV equipment. All components and materials of the CCTV shall be new.

All CCTV cameras and components exposed to the public will be vandal and tamper resistant. All components shall be securely fastened to a wall or fixed structure in an aesthetically pleasing appearance. Cameras located outside should be weather resistant.

The country of origin will be identified for all components. All cameras will be of high quality and fully FAR and NDAA compliant.

The Contractor shall work together with INL Representatives and SAT IT personnel to identify the best systems and software needed to connect the new camaras that will be purchase under this PWS and connected to SAT Headquarters and the INL-supported border command center.

The Contractor shall:

· Be flexible, timely, and innovative.

· Be mindful of local culture, laws, and operating environment.

· Use (including hire) local expertise and resources to the maximum extent possible.

· Ensure the sustainability of its interventions within the SAT after the INL-funded project has closed-out; and

· Engage other stakeholders active in this sector, if any; and

· Provide technical and intellectual leadership in the field.

The Contractor must be able to give support to SAT after the projects ends. This means that SAT will be able to contact the contractor awarded for troubleshooting, parts support or change, software and IT support. The contractor must have local technicians able to answer and give support to SAT in regards of the CCTV system that will be installed.

The main objective of this project is to have all PCI sites as well as all POE connected through a CCTV system directly to SAT HQ in Guatemala City. In which all Camaras, storage server units and DVRs are interconnected and capable of using all of their features. The minimum storage capacity for all PCIs and POEs should be of 60 days.

SECTION 2

SERVICE DELIVERY SUMMARY

The Contractor shall replace existing SAT CCTV system with the installation and configuration of 162 new CCTV in all PCIs and POEs listed in this PWS. This shall include and it is not limited to DVRs, Storage Server Units, camaras, and LPRs. Proposals shall include all costs.

The Contractor shall change the existing 162 cameras, hardware and software in the below site locations.

Period of Performance The period of performance shall be 120 days.

Place of Performance List of site locations at PCIs and POEs where equipment will be replaced. Locations are distributed per regions and per Guatemala Customs (SAT) own classification:

Central Region

Location
NVR
Switch
PTZ
Bullet
LPR
NAS
Joystick
Aduana Central, Guatemala City.
1
1
-
-
2
-
-
Express Aereo, Guatemala City.
1
1
-
4
-
-

Central de Monitoreo, Guatemala City.

1
-
-
-
2
-

CARCE / GSI / Spare Guatemala City.

-
-
-
-
-
-
3
PCI Sanarate, El Progreso.
1
1
2
8
2
-
-
PCI Patzicia, Chimaltenango.
1
1
2
6
2
-
-

South Region

Location
NVR
Switch
PTZ
Bullet
LPR
NAS
Joystick
POE Puerto Quetzal, Escuintla.
1
1
-
-
6
-
-
POE Valle Nuevo, Jutiapa.
1
1
-
-
2
-
-
POE Pedro de Alvarado, Jutiapa.
1
1
-
-
2
-
-
POE San Cristóbal, Jutiapa.
1
1
-
-
2
-
-

PCI Jerez, Jutiapa.

1
1
-
4
-
-
-
PCI Escuintla, Escuintla.
1
1
-
6
-
-
-
PCI Retalhuleu, Nuevo San Carlos.
1
1
-
4
-
-
-

PCI Pasaco, Jutiapa.

1
1
2
8
2
-
-

West Region

Location
NVR
Switch
PTZ
Bullet
LPR
NAS
Joystick
POE La Mesilla, Huehuetenango.
1
1
-
-
3
-
-
POE El Carmen, Huehuetenango.
1
1
-
-
4
-
-
POE Tecun Umán II, San Marcos.
1
1
-
-
10
-
-
POE Tecun Uman I, San Marcos.
1
1
-
-
4
-
-

PCI Pajapita, San Marcos.

1
1
2
8
2
-
-
PCI Huehuetenango, Huehuetenango.
1
1
2
10
2
-
-

Northeast Region

Location
NVR
Switch
PTZ
Bullet
LPR
NAS
Joystick
POE Melchor de Mencos, Huehuetenango.
1
1
-
-
2
-
-
POE Santo Tomas de Castilla, Izabal.
1
1
-
-
6
-
-
POE Puerto Barrios, Izabal.
1
1
-
-
6
-
-
POE Agua Caliente, Chiquimula.
1
1
-
-
2
-
-
POE El Florido, Chiquimula.
1
1
-
-
2
-
-
POE La Ermita, Chiquimula.
1
1
-
-
2
-
-
PCI Vado Hondo, Chiquimula.
1
1
-
10
-
-
-

PCI Rio Dulce, Izabal.

1
1
2
6
2
-
-

PCI Entre Rios, Izabal.

1
1
-
7
2
-
-
Totals
27
28
12
77
73
2
3

List of suggested equipment:

Proposals can suggest a different configuration. This information is based on existing equipment.

Camaras

Reference picture

Description
Quantity

PTZ Camara 4MP+4MP Dual-Lens network 25x

5MP HD INTELLIGET IR VF Bullet Network Camara

3MP Overseas Recognition of Vehicle License Plate Bullet IP Camara

NVR 32 Channels 8 HDDs 2U Network Video Recorder

NVR 8 Bays for Hard Drive, 64 Channels, IQ.

48GE Switch (PoE), 1 GB and 10 GB UPLINK. With 48 ports of 1 GB and 6 of 10 GB.

Network Joystick Keyboard

Storage Drive of 48 Bays (NAS)

10 TB Hard Drive, video surveillance, SATA 6Bs/s, 7200 rpm

Video Monitoring System (Software)

2.1. INITIAL REQUIRED MEETINGS

Required Meetings

Item No.
Meeting Objective
Performance Measurement
Performance Suspense
1
Pre-Performance Meeting
Kick-off meeting with INL Representatives and SAT IT personnel to establish number of site visits per region and perform an informative session to explain the equipment identified in the proposal.
After initial meeting, contractor will present a Gantt chart with the established calendar of tasks and milestones, as well as information on completion by region.

Will also serve to present the brand and software to be used as the new CCTV system.

05 calendar days after award.

2
Work Plan Presentation Meeting

Second meeting with INL Representatives and SAT IT personnel to present Gantt Chart timelines.

Delivery of Gantt chart with timeline and milestones per region.
10 calendar days after kick-off meeting.
3
Project Completion Meeting

Presentation of performed work.

Presentation of technical support for the following six-month period after completion of the project.

Successful implementation of the new CCTV system. Tests will be conducted in all locations where the cameras are replaced.
Maximum of 60 calendar days after the second meeting.

SURVEILLANCE: The Government QA personnel shall perform periodic inspections as well as receive and investigate customer complaints. Discrepancies and complaints shall be passed to the Contract Administrator or Contracting Officer for a resolution.

2.1.2. KEEPING INSTITUTIONAL EFFICIENCY. SAT has all their camaras, servers and storage unit devices connected to their main intelligence center. SAT is able to monitor all their CCTV and is compatible with all their camaras and software installed in all their offices. The change of the 162 camaras shall allow their CCTV system to work independently and not compatible with their current integrated system. At a minimum, the Contractor shall:

· Help SAT with the software language and compatibility to monitor all CCTV as an integrated system.

· While installing and replacing the hardware and software, performed tests together with SAT IT personnel and test compatibility with SAT systems.

2.1.3. PROGRAM MANAGEMENT.

The Contractor is required to manage and lead the replacement of SAT’s CCTV system at PCIs and POEs as per the agreed schedule, meet deadlines as described in the Gantt Chart herein, and prioritize areas of concern that SAT identifies as critical and that have to be monitored 24/7. The project manager will also be called upon to recognize issues in real time and provide more efficient practices and ideas to drive the desired results and objectives. The camaras must be all color and should include their mount bases when installing the equipment. All software licenses must be included for their correct analytic operation, system recording and storage. All necessary training for the operation of the equipment and software must be included.

2.1.4.1. WORK PLAN

The Contractor is required to submit an initial work plan. The work plan must detail or specify site locations and timelines on how all camaras, servers, storage units and all hardware will be replaced. Contractor must also include a Gantt Chart describing how replacement will take place. The work plan should contemplate SAT priorities for sites that need to be considered as critical for replacement and monitoring. The Contractor shall revise the work plan and update it as needed throughout the duration of the contract.

2.1.4.2. KEY PERSONNEL.

The Contractor shall assign sufficiently experienced personnel, who are qualified in the conduct of similar projects and who have appropriate background and experience. Key personnel may not be replaced by the service provider without the review and approval of the Contracting Officer. All personnel, including IT SMEs, shall be considered key personnel and will be reviewed by the COR, in consultation the INL section in Guatemala and the INL Guatemala Program Officer. Where INL deems necessary, the Contractor shall submit supporting documentation sufficient to allow the COR to conclude that the candidate possesses the qualifications, experience, and training required. These should include, but may not be limited to:

(a) PROJECT MANAGER/CHIEF OF TEAM (COT) The Contractor shall appoint a project manager and an alternate who will oversee the performance of the work. These individuals must have full authority to represent the contractor on all contract-related matters concerning daily operations. S/he shall have adequate authority to make major implementation decisions and be responsible for the performance of the work and coordination of all project activities. The COT will be responsible for reporting to INL/Guatemala, is expected to play a lead role in interacting with senior SAT officials and generally acting as project liaison in the sites with other GOG officials.

The Project Manager/COT is considered Key Personnel. Minimum qualifications for the Project Manager/Chief of Team are the following:

· From an accredited university, a bachelor’s degree in software engineering.

· At least five (5) years of experience in related projects.

· Supervisory experience while implementing these type of projects.

· Have a Development and/or Configuration Certificate by the brand/vendor of the model and make of the hardware and software to be installed.

· The Certificates must include at least 2 technical certificates in the Development and/or Configuration by the brand/vendor of the model and make of the hardware and software to be installed.

2.2.4.4. CONTRACTOR QUALITY ASSURANCE PLAN

The Contractor shall provide no later than 15 days after receipt of award a quality assurance plan to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is how he assures himself that his work complies with the requirement of the contract.

The government shall evaluate the contractor’s performance under this contract €n accordance with the Quality Assurance Plan. The plan must explain how performance progress will be periodically monitored, process for receipt of complaints or performance concerns, and approach to minimize repeat failures.

2.2.4.5. PLANS, MEETINGS, REPORTS, AND CONFERENCE CALLS

(a) INITIAL WORK PLAN.

The Contractor shall include a draft work plan that is illustrative of the ability to prepare such a plan. The work plan shall include milestones and timeframe for removal of old cameras, installation and wiring of new cameras, system testing and final adjustments. Upon award, the Contractor shall submit a detailed work plan within 10 calendar days to the CO, COR, INL Guatemala Program Officer, and INL Section in Guatemala. Once approved by the COR, the work plan shall guide the substantive work of the program. Note that the Contractor’s evaluation shall be determined by its performance in implementing the work plan and achieving the intended results of the project, as identified in the Results Framework.

The work plan must be divided by regions as is described in the chart in section two (2). And each region must be completed before the contractor initiates work in the next region. If due to performance or specific operation needs by SAT a region needs to be prioritized, this will be discussed in the initial meeting when vendor is presenting the work plan. During the execution of the work plan, any changes must have prior approval from the INL COR. Any changes without the INL COR approval will not be considered approved.

(1) PROGRESS MEETINGS.

The Contracting Officer Representative and other Government personnel, as appropriate, will meet periodically with the Contractor to review the contract performance. At these meetings, the COR will appraise the Contractor of how the Government views the Contractor’s performance and the Contractor will appraise the Government of problems, if any being experienced. Appropriate action should be taken to resolve outstanding issues.

(1) WEEKLY REPORTS.

On a weekly basis, the Contractor shall provide on Fridays a written report to the COR and INL Program Officer. The weekly report should be no more than 4 pages in length and must identify, at a minimum, the following Project activities conducted during the reporting period, with an indication of whether activities were conducted in accordance with the work plan and specifying measurable results. Status and analysis of overall project progress towards achieving project objectives, citing evidence such as significant events, installation issues or delays.

(d) PRE-PERFORMANCE CONFERENCE The Contractor and at minimum one additional personnel shall meet or teleconference with the CO, COR, and within 5 business days after effective award date to discuss details regarding the proposal, schedule, and other related contract activities. The contractor shall come prepared to identify any areas of concern and to suggest ways of responding to these concerns.

(e) CONTRACTOR CHANGE OVER The Government reserves the right to conduct site visits to all Contractor-operated facilities in conjunction with the solicitation of offerors for any follow-on contract. In the event the follow-on contract is awarded to other than the incumbent, the incumbent Contractor will cooperate to the extent required to permit an orderly changeover to the successor Contractor. With regard to the successor Contractor’s access to incumbent employees, a recruitment notice may be placed in each facility accessible to incumbent employees.

(f) INSTALLATION SCHEDULE A project schedule shall be provided to the COR within seven calendar days after contract is awarded. Installation shall begin no later than fourteen (14) calendar days after receipt of the contract award.

2.2.4.6. ACCEPTANCE CRITERIA

The project will be considered complete when the following criteria are met:

(a) Cameras Installed and Operational – All CCTV cameras are installed in the specified locations and verified to be fully operational.

(b) Seamless System Integration – The CCTV system integrates seamlessly, ensuring uninterrupted functionality and no disruptions to ongoing operations.

(c) Approval of deliverables – All project deliverables meet the defined specifications and are formally approved by SAT.

(d) Documentation provided – comprehensive documentation, including installation reports, testing results, and user manuals, is submitted to the customer for review and approval.

Upon completion and verification of these criteria, the customer will notify both the contractor and the contracting officer as final confirmation of project acceptance.

2.2.4.6.1 PERFORMANCE REQUIREMENTS SUMMARY

The Contractor will be evaluated during the duration of the project following the below Performance chart. The INL COR will be conducting random inspections after the completion of each region by the contractor. These inspections will be evaluating the work performance, functionality and CCTV system integration with SAT main servers. The contractor must notify the INL COR when a region is completed and not wait until finish the whole project.

Performance evaluation chart:

Performance Objective
Standard
Performance Threshold
Acceptance Criteria
The contractor must adequate their work plan and schedule to be completed by regions as described in Section 2.
The contractor will present in their second meeting a complete work plan and schedule to INL and SAT. How the project will be executed. (15 calendar day after award).
The contractor presents a work plan that details how the projects will be executed which details each region, hardware to be used, software to be use, and how the camaras and system will be tested.
The contractor was able to present a detail work plan which includes the project execution, timeline, hardware and software description and system compatible tests.
The Contractor has successfully complete Region One (1) as described in the work plan.
The contractor has completed the swap of the new cameras, and the hardware & software as required and detail in Section 2. After competition of this region, the contractor must notify to the INL COR.
The contractor has followed SAT minimum requirements for personnel access to SAT own spaces. And have successfully test the performance and compatible of the cameras and software.

The contractor must storage in carton boxes all the equipment that will be replace. And label it for its identification. An acceptance letter with the list of equipment inside each box must be place over the boxes, and a copy of each letter must be share with the INL COR.

The INL COR will perform at least one site visit to a PCI and to a POE to performed compatible test of this region. The INL COR will specifically test the functionality of the cameras, if the software is compatible with SAT systems and the overall installation performance.

The Contractor has successfully complete Region Two (2) as described in the work plan.
The contractor has completed the swap of the new cameras, and the hardware & software as required and detail in Section 2. After competition of this region, the contractor must notify to the INL COR.
The contractor has followed SAT minimum requirements for personnel access to SAT own spaces. And have successfully test the performance and compatible of the cameras and software.

The contractor must storage in carton boxes all the equipment that will be replace. And label it for its identification. An acceptance letter with the list of equipment inside each box must be place over the boxes, and a copy of each letter must be share with the INL COR.

The INL COR will perform at least one site visit to a PCI and to a POE to performed compatible test of this region. The INL COR will specifically test the functionality of the cameras, if the software is compatible with SAT systems and the overall installation performance.

The Contractor has successfully complete Region Three (3) as described in the work plan.
The contractor has completed the swap of the new cameras, and the hardware & software as required and detail in Section 2. After competition of this region, the contractor must notify to the INL COR.
The contractor has followed SAT minimum requirements for personnel access to SAT own spaces. And have successfully test the performance and compatible of the cameras and software.

The contractor must storage in carton boxes all the equipment that will be replace. And label it for its identification. An acceptance letter with the list of equipment inside each box must be place over the boxes, and a copy of each letter must be share with the INL COR.

The INL COR will perform at least one site visit to a PCI and to a POE to performed compatible test of this region. The INL COR will specifically test the functionality of the cameras, if the software is compatible with SAT systems and the overall installation performance.

The Contractor has successfully complete Region Four (4) as described in the work plan.
The contractor has completed the swap of the new cameras, and the hardware & software as required and detail in Section 2. After competition of this region, the contractor must notify to the INL COR.
The contractor has followed SAT minimum requirements for personnel access to SAT own spaces. And have successfully test the performance and compatible of the cameras and software.

The contractor must storage in carton boxes all the equipment that will be replace. And label it for its identification. An acceptance letter with the list of equipment inside each box must be place over the boxes, and a copy of each letter must be share with the INL COR.

The INL COR will perform at least one site visit to a PCI and to a POE to performed compatible test of this region. The INL COR will specifically test the functionality of the cameras, if the software is compatible with SAT systems and the overall installation performance.

The contractor has successfully finished all cameras replacements and installation of new cameras, hardware and software as described is this PWS.

The contractor has training SAT IT Team on the usage of the new CCTV software and the new cameras.

The contractor has completed all works as per work plan approved and as details in Section 2.

The contractor has trained SAT IT personnel as needed for the proper use of the new cameras and CCTV system.

The contractor must notify the INL COR after all works have been completed.

The contractor must test all cameras, hardware and software installed to confirm that all equipment is working, and all systems are compatible with SAT. All equipment that was replace must be storage in carton boxes, properly labelled. A copy of an acceptance letter signed by each SAT representative at each location must be place over the carton boxes, a copy must be share with the INL COR. SAT IT personnel must be trained on the use of the new equipment and software.
The INL COR will randomly perform final test of the cameras functionality, and software integration of the new CCTV system with SAT software. The INL COR will evaluate the overall performance of the contractor during the whole project.

SECTION 3

GENERAL INFORMATION

GENERAL Service providers shall provide personnel, equipment, tools, materials, supervision, and other items and services necessary to perform services defined in this PWS.

3.1. PERFORMANCE LOCATION

Contractor is required to perform services in the locations of PCIs and POEs listed in the PWS.

3.1.1. HOURS OF OPERATION.

Service provider shall perform the services required under this contract during the following schedule: routine hours for publishing and forms functions are 7:30 a.m. through 4:30 p.m. local, Monday through Friday, excluding Guatemala holidays. Saturday and Sunday are not considered normal workdays.

3.1.2. CONTRACTOR POINT OF CONTACT

The Contractor shall provide an individual who must have full authority to act in all matters related to this PWS. This individual must be responsible and accountable to the CO in representing the service provider for meeting the performance requirements of the PWS. This individual must be designated in writing to the CO no later than the pre-performance conference.

3.2 QUALITY ASSURANCE PLAN.

The government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on-site inspections of the contractor’s quality control program and receipt of complaints from base personnel. The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality control inspections if merited by performance. The government will also investigate complaints received from various customers located on the installation. The contractor shall be responsible for initially validating customer complaints. However, the government representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).

The Contracting Officer (CO), and other Government personnel, as appropriate, will meet periodically with the contractor to review the contract performance. At these meetings, the CO will appraise the contractor of how the Government views the contractor’s performance and the contractor will appraise the Government of problems, if any, experienced. Appropriate action should be taken to resolve outstanding issues.

3.2.1. CONTRACTING OFFICER REPRESENTATIVE

Contracting Officer Representative (COR) is the authorized government representative(s) who will perform assessments of the contractor’s performance. Subsequent to contract award, the identity of the COR(s), with a letter defining their duties and authority will be promptly furnished to the successful bidder/offeror.

The COR(s) or alternate(s) will inform the contract manager in person when discrepancies occur and will request corrective action. The COR(s) or alternate(s) will make a notation of the discrepancy on their assessment checklist with the date and time the discrepancy was noted

3.3. EMPLOYEES

The Contractor shall not employ any persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the safety, security, or operational mission of the installation and its population. The Contractor shall submit letters with qualifications from prospective employees to the Contracting Officer prior to the start of contract performance. Should personnel be replaced during the course of contract performance, the Service Provider shall ensure replacement personnel meet the same standards.

3.3.1 QUALIFICATION OF PERSONNEL.

The Contractor shall ensure personnel are qualified and eligible to work for the United States and can respectfully interact with Guatemala government officials or American Diplomats. The Contractor is responsible for ensuring the number of personnel, hours, level of effort, and mix of skillset are appropriate for meeting all aspects of this PWS. To ensure clear and concise communication in the field, the service provider should provide a copy of an individual, either placed or replaced, resume and their writing samples in English.

Contractor personnel shall present a neat appearance and be easily identified as service provider employees. In addition to resumes, the contractor shall provide writing samples in English for the proposed key personnel.

The Contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of State.

If the Contracting Officer finds it to be in the best interest of the Government, they may at any time during the performance of this contract order the Contractor to remove any of his personnel from further performance under this contract for reasons of their moral character, unethical conduct, security reasons, or violation of installation regulations. In the event that it becomes necessary to replace any Contractor personnel for any of the above reasons, the Contractor shall bear all costs associated with such removal, including the costs for the replacement of any personnel so removed. These costs shall not be chargeable to the Government.

3.3.2 EMPLOYEE TRAINING.

The Contractor shall ensure all service provider employees are trained to support the requirements of this PWS. Contractor shall ensure that all training is completed and documented prior to allowing the employee to perform work.

SECTION 4

SPECIAL CONSIDERATIONS

4.1 IN-COUNTRY RESOURCES

The Contractor shall acquire all off-site material, technical and or logistical services necessary to support the program and officers. In the event equipment, materials, or tools is needed to support the implementation, the Contractor shall identify, itemize, include estimated cost, and submit the request for approval to the Contracting Officer Representative.

4.2. SUBCONTRACTING

Contractors are encouraged to subcontract with Guatemala entities. The subcontractor(s) should have significant involvement and may assist the contractor in one or more of the following areas: 1) provides technical advice, 2) installs equipment, 3) performs quality surveillance, 4) collects, monitors, and interprets program effectiveness.

4.3 VISAS AND VISA RENEWALS.

The Contractor shall ensure that all personnel have valid passports with appropriate visas prior to deployment and shall ensure timely renewals of visas and passports. The USG will not provide support or facilitation for obtaining passports or Guatemalan visas.

4.4 TRAVEL.

All in country travel necessary to perform installations or site visits by the Contractor must be cover by the Contractor. Travels cost incurred during this projects that includes all Contractor’s personnels is the Contractors responsibility to cover their own expenses. And must be included in PWS cost. INL Guatemala will not cover any travel or per diem cost for any of the personnel of the Contractors personnel.

4..5. PHYSICAL SECURITY REQUIREMENTS.

The Contractor shall be responsible for safeguarding all government property and classified information under their control. All government facilities, equipment, and materials utilized by the service provider shall be secured to the U.S. standards. And must include SAT standards for securing information.

Contract performance on this project does not require an individual or facility level security clearance; however, Contractors are encouraged to conduct background searches on all personnel performing in Guatemala.

SECTION 5

APPENDICES

TABLE OF APPENDICES

APPENDIX 1
Definitions and Acronyms
APPENDIX 2
Assessment Report
APPENDIX 3
Work Plan Template
APPENDIX 4
Weekly Progress Report Template

APPENDIX 1

DEFINITIONS AND ACRONYMS

1. CCTVClose Circuit Television.
2. INLInternational Narcotics and Law Enforcement Affairs Office
3. IPInternet Protocol
4. POEPort of Entry
5. SATSuperintendencia de Administración Tributaria / Guatemala Customs
6. PCIPuesto de Control Interinstitucional (same as IHC)
7. IHCInteragency Highway Checkpoint
8. BCCBorder Command Center
9. ITInformation Technology
10. HQHeadquarters
11. PWSPerformance Work Statement
12. FARFederal Acquisition Regulation
13. NDAANational Defense Authorization Act
14. DVRDigital Video Recorder
15. LPRLicense Plate Reader
16. NVRNetwork Video Recorder
17. PTZPan, Tilt & Zoom
18. NASNetwork Attached Storage
19. SMESubject Matter Expert
20. CORContract Officer Representative
21. COTChief of Team
22. GOGGovernment of Guatemala
23. COContracting Officer

APPENDIX 2

*Template to consider as an example. The contractor can present their own version for reporting.

APPENDIX 3

APPENDIX 4