PWS_for_Overhaul_of_F100-PW-220_229_fuel_controls_and_accessories.pdf

PDF 374 KB Posted

Attached to
F100-PW-220/229 Augmentor Fuel Controls and Accessories
Solicitation number
FA8121-22-R-0009
Issued by

View the file

Other files

File Type Posted
FA812122R0009_______0001.pdf PDF
DI-ALSS-81535_CDRL.pdf PDF
Packaging_rqmts.pdf PDF
FA812122R0009.pdf PDF
Transportation_data.pdf PDF
DIDs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

For

F100-PW-220/229 Augmentor Fuel Controls and Accessories

FILE NUMBER: PR # FD2030-22-30576

DATE: 4 November 2021

PREPARING ORGANIZATION:

AFLCMC/LPSIB

TINKER AFB OK 73145-3030

Warning –this document contains technical data whose export is restricted by the arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. violation of these export‐control laws is subject to severe criminal penalties.

Dissemination of this document is controlled under DoD Directive 5230.25

FD2030‐22‐30576 Page 2 of 35

TABLE OF CONTENTS Page

SECTION I

1.1 DATA

1.2 SECURITY

1.3 QUALITY

1.4 DELIVERY SCHEDULES

1.5 CONDEMNATION AND OVERHAUL

1.6 HANDLING

1.7 INVENTORY

1.8 PRESERVATION

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

1.10 GENERAL WORK REQUIREMENTS

1.11 SPECIFIC WORK REQUIREMENTS

1.12 APPLICABLE TECHNICAL ORDERS

1.13 APPLICABLE DIRECTIVES

1.14 APPLICABLE DOCUMENTS

SECTION II

2.1 SERVICE SUMMARY REQUIREMENTS

2.2 CONTRACTOR PERFORMANCE EVALUATION

SECTION III

3.1 GOVERNMENT PROPERTY

APPENDIX 1

A1.1 ACRONYMS

APPENDIX 2

A2.1 NOTES

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.2 TERMS EXPLAINED

A3.3 RESPONSIBILITIES

A3.4 AUDIT PROCEDURES

A3.5 AUDIT RESULTS

APPENDIX 4

A4.1 INITIAL PRODUCTION EVALUATION (IPE) PROCEDURES ………

A4.2 TERMS EXPLAINED

A4.3 RESPONSIBILITIES

A4.4 SITE VISIT SURVEY REQUIREMENTS

A4.5 REPAIR DEMONSTRATION AND REPAIR EVALUATION REQUIREMENTS…………………………………. 31

A4.6 IPE REPORTING REQUIREMENTS AND RESULTS

FD2030‐22‐30576 Page 3 of 35

FD2030‐22‐30576 Page 4 of 35

SECTION I

DESCRIPTION OF SERVICES

This PWS establishes the minimum work requirements to return F100-PW-220/229 Augmentor Fuel Controls and Assemblies listed below by National Stock Numbers (NSNs) and Part Numbers (P/Ns) to a serviceable but not like new condition. F100-PW-220/229 Augmentor Fuel Controls and Assemblies received by the Contractor, as set forth in this contract shall be overhauled, prepared for storage and shipped in accordance with (IAW) the requirements in this PWS and the contract. All levels of repair shall be accomplished IAW technical orders (TO) identifed in the table below.

NOUN INPUT NSN INPUT PN(s) OUTPUT NSN

OUTPUT

PN

TMS

T.O. Overhaul Reference

CONTROLLER, FUEL

PUMP,AUGMENTOR (AFPC)

2915-01-206-0654 4061379, 4080022, 441294‐3, 441294‐4, 441738‐4, 441738-5

2915-01-206-0654 441738-5

PW-

6J3-2-35-3-WA-1

CONTROL-FUEL,

AUGMENTOR (AFC)

2915-01-217-0177 441422

2915-01-217-0177 441422-11

PW-

6J3-2-34-4-WA-1

CIVV CONTROL CYLINDER

(AV-AD 1)

1650-01-206-7640 441291-4 1650-01-206-7640 441291-4

PW-

6J27-7-3-WA-1

1650-01-311-0130 441435-4, 4067837 1650-01-311-0130 441435-4 4067837

PW-

6J27-7-3-WA-1

RCVV CYLINDER (AV-AE2) 2995-01-206-7995 441293‐3, 4061378 2995-01-206-7995 441293‐3

PW-

6J27-8-3-WA-1

3040-01-377-7537 441720‐3, 4071524 3040-01-377-7537 441720‐3

PW-

6J27-8-3-WA-1

ACTUATOR, BALL SCREW,

PRIMARY (AV-H3)

3040-01-478-8902 4086389, 442116, 442116‐4 3040-01-478-8902 442116‐4

PW-

16A1-14-43-3-WA-1

3040-01-468-1846 4085020, 442019 3040-01-478-8902 442116‐4

PW-

16A1-14-43-3-WA-1

3040-01-277-5547 4074746, 441534, 440487‐1 3040-01-478-8902 442116‐4

PW-

16A1-14-43-3-WA-1

3040-01-071-5952 4052340, 441085, 441085‐1 THRU -6

3040-01-478-8902 442116‐4

PW-

16A1-14-43-3-WA-1

ACTUATOR-BALL SCREW,

SECONDARY (AV-G3)

3040-01-478-8903 442115-2 3040-01-478-8903 442115-2

PW-

16A1-14-43-3-WA-1

3040-01-277-4737 4074745, 441533, 441533‐1, 441533‐2

3040-01-478-8903 442115-2

PW-

16A1-14-43-3-WA-1

3040-01-071-8325 4052339, 441083, 441083‐1 THRU -4

3040-01-478-8903 442115-2

PW-

16A1-14-43-3-WA-1

3040-01-468-1847 4085019, 442018 3040-01-478-8903 442115-2

PW-

FD2030-22-30576 Page 5 of 35

PRIMARY (AV-H3)

3040-01-474-3768 4086391, 442044 3040-01-474-3768 442044-4

PW-

16A1-14-43-3-WA-1

3040-01-324-9088 4076324, 441615 3040-01-474-3768 442044-4

PW-

16A1-14-43-3-WA-1

3040-01-459-0290 4085022, 442021 3040-01-474-3768 442044-4

PW-

SECONDARY (AV-G3)

3040-01-474-3767 4086390, 442043-2 3040-01-474-3767 442043-2

PW-

16A1-14-43-3-WA-1

3040-01-459-0291 442020-2 3040-01-474-3767 442043-2

PW-

16A1-14-43-3-WA-1

3040-01-324-9089 4076323, 441614-2 3040-01-474-3767 442043-2

PW-

CONTROL,EXHAUST

NOZZLE CONVERGEN (TO-

L1)

2995-01-450-2816 441991‐11 2995-01-450-2816 441991‐11

PW-

6J3-8-21-3-WA-1

2995-01-206-0648 4061375, 4069397, 441290‐5, 441476

2995-01-450-2816 441991‐11

PW-

6J3-8-21-3-WA-1

2915-01-448-7297 441476-6 THRU ‐11 2995-01-450-2816 441991‐11

PW-

6J3-8-21-3-WA-1

CONTROL,EXHAUST

NOZZLE,TURBINE E (TN-A1)

2995-01-433-6462 4083219, 441944, 441944‐10, 441944‐ISS10

2995-01-433-6462 441944-10

PW-

6J3-8-21-3-WA-1

2995-01-319-5004 4076322, 441612 2995-01-433-6462 441944-10

PW-

6J3-8-21-3-WA-1

MODULE KIT,FILL SWITCH

ASSEMBLY

2995-01-222-8336 351014 2995-01-222-8336 351014

PW-

MODULE KIT,PLA

RESOLVER AND COVER

ASSEMBLY

2915-01-222-5690 351006 2915-01-222-5690 351006

PW-

PW-

6J3-4-118-4-WA-1

MODULE KIT-SEGMENT

SEQUENCING VALVE

RESOLVER ASSEMBLY

2915-01-224-0775 351019 2915-01-224-0775 351019

PW-

MODULE KIT, RESOLVER 2995-01-222-5691

351007, 351007A, BE351007A

2995-01-222-5691 351007

PW-

PW-

CIVV CYLINDER (AV-AF1) 2995-01-206-7994 441292, 441292‐3 2995-01-206-7994 441292‐3

PW-

6J27-6-3-WA-1

CIVV CYLINDER (AV-AF1) 1650-01-311-0131

441436, 441436-4, 4067838 1650-01-311-0131 441436-4

PW-

6J27-6-3-WA-1

COMPRESSOR BLEED

CYLINDER

2995-00-295-2481 4020236, 440477‐1, 440477‐2, 440477‐3

2995-00-295-2481 440477‐3

PW-

6J27-4-3-WA-1

MODULE

KIT,SENSOR,TEMPERATURE

2915-01-224-0778 351000 2915-01-224-0778 351000

PW-

PW-

FD2030-22-30576 Page 6 of 35

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal correspondence.

1.1 DATA

1.1.1 Reporting Requirements

1.1.1.1 Product Quality Deficiency Report (PQDR – SF 368): The Contractor shall prepare a PQDR on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54-WA-1. Applicable portions of TO 00-35D-54-WA-1 relative to quality defects will apply. The Contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54-WA-1. The Contractor shall furnish an information copy of the SF 368 to USAF F100 Engineering Source Authority listed in TO 2J-F100-13-1-WA-1, WP 600 00.

1.1.1.2 TO System Publication Improvement Report (AFTO Form 22): The

Contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The Contractor shall accomplish a PIR IAW TO 00-5-1-WA-1 and submit one copy to AFLCMC/ENR. Minor discrepancies of non- technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc., shall not be reported. The Contractor shall report omissions of pertinent technical data, correction of overhaul procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.

1.1.1.3 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any

FUEL

CONTROL,MAIN,TURBINE

ENGINE

2915-01-342-3809 441610‐21 2915-01-342-3809 442632-23

PW-

6J3-4-118-2-1-WA-1

2915-01-342-3809 4076175, 4089352, 441610-14 THRU -21,

442632‐23

2915-01-342-3809 442632-23

PW-

6J3-4-118-2-1-WA-1

2915-01-214-7309 4066012, 4066012‐001, 441396-14 THRU -21,

442646‐23 2915-01-342-3809 442632-23

PW-

6J3-4-118-2-1-WA-1

2915-01-342-3810 4071785, 4071785‐001, 441583-14 THRU -19,

442645‐23 2915-01-342-3809 442632-23

PW-

6J3-4-118-2-1-WA-1

FUEL

CONTROL,MAIN,TURBINE

ENGINE

2915-01-407-1507 4071523, 4089355, 441721, 2915-01-407-1507 442631-12

PW-

6J3-4-118-2-1-WA-1

FD2030-22-30576 Page 7 of 35

PQDR exhibit received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.

1.1.2 Other Records, Forms and Reports

1.1.2.1 The Contractor shall make available to the appropriate ACO/PCO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete such other reports as may be required.

1.1.2.3 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD-

129R, paragraph 5.2.21.a.

1.1.2.4 The Contractor shall report ALL Contractor labor hours (including subContractor labor hours) required for performance of services provided under this contract via a secure data collection site. The Contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

1.1.2.4.1 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar.

Contractors may direct questions to the CMRA help desk.

1.1.3 Technical Data

1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the overhaul requirements of the contract.

1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this PWS shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this PWS. Part replacement shall be confined to those parts determined to be required to produce a serviceable end item.

1.1.3.3 Directives listed in paragraphs 1.11, 1.12, 1.13 & 1.14 and instructions provided throughout this PWS shall be adhered to, thus obtaining the highest possible quality of workmanship and to maintain acceptable quality standards.

1.1.3.4 Instructions listed in this PWS as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System and shall be complied with.

FD2030-22-30576 Page 8 of 35

The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.

1.1.3.5 In the event of a conflict between the instructions in this PWS and the applicable technical directive, the following order of override precedence applies (descending order): 1) this PWS, 2) the end item TO, 3) other technical directives.

1.2 SECURITY

1.2.1 Contractor’s Security Controls: Equipment and materials covered by this PWS are not classified.

1.3 QUALITY

1.3.1 The Contractor shall provide and utilize an inspection/quality system IAW ISO - 9001.

1.3.2 The Contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products overhauled by the Contractor and/or their subContractor or vendors. Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of TO 00-35D-54-WA- 1 and the CDRL.

1.3.3 No defective parts shall be delivered to the Government.

1.4 DELIVERY SCHEDULES

1.4.1 The delivery schedules shall be IAW the contract delivery schedules.

1.5 CONDEMNATION AND OVERHAUL

1.5.1 Contractor’s Scrap Procedures: The Contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall by IAW TO 00-25-113-WA-1 and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.

1.5.2 Condemnation: The Contractor shall not condemn End Items without written approval of the ACO/PCO.

1.5.2.1 End Items will be determined by the Contractor and verified by the ACO/PCO to be beyond economical overhaul through request for disposition instructions

FD2030-22-30576 Page 9 of 35 from the International Engine program office.

1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure that purchasers of scrap are unable to overhaul the item for possible resale or reuse. All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished and meets DEMIL directive requirements.

1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be transmitted to F100 Engineering Source Authority listed in TO 2J-F100-13-1-WA-1, WP 600 00.

1.5.3 Overhaul: End Items determined to be beyond economical repair shall not be overhauled by the Contractor unless authorization has been given by the International Engine program office, communicated to the ACO/PCO and authorized in writing by the ACO/PCO.

1.6 HANDLING

1.6.1 The Contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.

1.7 INVENTORY

1.7.1 Each end item shall be inspected by the Contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO/PCO representative.

1.8 PRESERVATION

1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO/PCO representative.

1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements. Government owned items and parts shall not be co-mingled with non- Government owned property.

1.9 RECEIPT/HANDLING OF PQDR EXHIBITS

FD2030-22-30576 Page 10 of 35

1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal overhaul assets until the investigation is completed. The Contractor shall provide the exhibit receipt date through the ACO/PCO with the F100 Engineering Source Authority listed in TO

2J-F100-13-1-WA-1, WP 600 00.

1.10 GENERAL WORK REQUIREMENTS

1.10.1 The instructions for the overhaul of items stipulated in this PWS shall be performed IAW the applicable T.O.s and the below exceptions.

1.10.1.1 The Contractor is authorized to inspect per part drawing and part QAD (Quality

Assurance Document).

1.10.2 The Contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.

1.10.3 The Contractor shall inspect the various disassembled components or part of the end item to determine if further overhaul is needed. Subsequent overhaul shall be accomplished IAW the applicable portion of the applicable overhaul technical order and supplementary instructions specified herein.

1.10.4 The Contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this PWS.

1.10.5 The Contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this PWS.

1.10.6 The Contractor shall replace condemned parts of the end item with like serviceable parts that are listed in the applicable technical order IPB unless otherwise specified in or within this PWS.

1.10.7 When overhaul kits are available for the overhaul of an end item, such kits shall be used IAW the applicable technical order and changes thereto or the specific instructions contained in this PWS.

1.10.8 Where the Contractor is directed to hold an item for Air Force Life Cycle

Management Center disposition by any cited publication herein or be any statement made within this PWS, such items shall be reported to the ACO/PCO through the GPA for disposition.

1.10.9 Overhaul, to the maximum extent, is desired when such overhaul is economically

FD2030-22-30576 Page 11 of 35 feasible. The Contractor is encouraged to submit new or improved overhaul procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this PWS or by any other means authorized under this contract. This does not preclude the Contractor’s submission of overhaul procedures, which are not economically feasible, when such overhauls are advantageous to the Government.

1.10.10 All of the Contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders and moralizers, shall be qualified and certified for operation IAW applicable military specifications when listed in the PWS.

1.10.11 Fit and tolerance limits shall be IAW applicable overhaul TO/Contractor’s processes and procedures unless otherwise specified.

1.10.12 Fluids, oil, greases and compounds shall conform to and be used as directed in the overhaul TO and instructions contained in this PWS.

1.11 SPECIFIC WORK REQUIREMENTS

1.11.1 Removal

1.11.1.1 Not Applicable.

1.11.2 Disassembly

1.11.2.1 Disassemble F100-PW-220/229 Augmentor Fuel Controls and Assemblies to the extent necessary to accomplish thorough internal cleaning and complete inspection of all parts to accomplish the work IAW TOs identifed in table above or in accordance with Contractor proprierity data.

1.11.3 Cleaning

1.11.3.1 Cleaning F100-PW-220/229 Augmentor Fuel Controls and Assemblies to the extent necessary to accomplish thorough internal cleaning and complete inspection of all parts to accomplish the work IAW TOs identifed in table above, or in accordance with Contractor proprierity data.

1.11.3.2 The Contractor shall ensure that cleaning and preserving materials meet the requirements specified in TOs identifed in table above, or in accordance with Contractor proprierity data.

1.11.4 Inspection

1.11.4.1 Inspection of F100-PW-220/229 Augmentor Fuel Controls and Assemblies shall

FD2030-22-30576 Page 12 of 35 be accomplished IAW TOs identifed in table above, or in accordance with

1.11.5 Corrosion Control

1.11.5.1 The corrosion control of F100-PW-220/229 Augmentor Fuel Controls and Assemblies during overhaul and storage shall be accomplished IAW TO 2-1-111- WA-1 or applicable TO identifed in table above.

1.11.6 Overhaul

1.11.6.1 Overhaul of F100-PW-220/229 Augmentor Fuel Controls and Assemblies shall be accomplished IAW TOs identifed in table above, or in accordance with

1.11.6.2 The Contractor shall identify all overhauled F100-PW-220/229 Augmentor Fuel

Controls and Assemblies with the Contractor’s CAGE IAW MIL-STD-130N.

1.11.7 Installation

1.11.7.1 Not applicable.

1.11.8 Test and Government Acceptance

1.11.8.1 Inspect, test, and check each overhauled item IAW TO 2-1-111-WA-1 and applicable TO identifed in table above.

1.11.8.2 The Government shall accomplish acceptance.

1.11.9 Product Verification Audit (PVA)

1.11.9.1 Overhauled items shall be subject to PVA if requested by the Government.

1.11.9.2 To perform PVA, the Government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.

1.11.9.3 After notification by the ACO/PCO that a PVA is required, the Contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.

1.11.10 Technical Publication Compliance

1.11.10.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this PWS, when:

1.11.10.1.1 They have not been previously accomplished.

FD2030-22-30576 Page 13 of 35

1.11.10.1.2 They are pertinent to the end item.

1.11.10.1.3 They prescribe Air Force Policies, use of materials and procedures for overhaul.

1.11.10.2 For solicitation purposes, the Contractor may contact USAF F100 Engineering Source Authority for instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the Contractor shall establish and maintain a TO distribution account IAW TO 00-5-1; and be placed on initial distribution for one copy each of the TOs and TCTOs listed in this PWS. The Contractor shall contact the TOMA office at AFLCMC.

LPSAA.TOMA@us.af.mil within five (5) working days after contract award for guidance in obtaining a TODO account. Once the Contractor’s TODO account is in operation, the Contractor shall maintain all TOs and TCTOs and other technical directives listed in the PWS in an updated and current status IAW TO 00-5-1. The Contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The Contractor shall submit a monthly review of changes to TOs, TCTOs, and other applicable directives received during that period. However, if a change is received that has a cost impact greater than 10% and/or is critical to safety of flight, the Contractor shall notify the ACO within ten (10) days of receipt of that change and also shall provide the cost impact with his backup data. The Contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.

1.11.10.3 Copies of other Air Force publications required in the performance of work outlined in this PWS will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1-WA-1 provides an explanation of the Technical Order System and for pertinent distribution, requisition and storage information.

1.11.10.4 In the event a follow-on contract is awarded to this contract, the “Package

File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new PWS of the new contract. This procedure will ensure continuity of the publication data from one contract to another.

1.11.11 Initial Production Evaluation (IPE)

1.11.11.1 Repaired and Overhauled items shall be subject to an IPE if the Contractor has not overhauled or repaired these items successfully within the last three years.

FD2030-22-30576 Page 14 of 35

1.11.11.2 The IPE will be composed of two parts, a Site Visit and then a Repair

Demonstration. The Contractor will have a 45 day period from contract award to complete the Site Visit. After the site visit the DCMA QAR will have 10 days to complete the site visit Survey and perform an exit briefing with the Contractor and the IPE Team. If necessary the Contractor will have 30 days from the Site Visit exit briefing to correct any critical or major deficiencies.

Upon approval of the Site Visit Survey by the ESA the Contractor will be notified in writing by the ACO. After notification of a successful Site Visit Survey by the ACO the Contractor will have a 75 day period to perform the Repair Demonstration part of the IPE. Upon completion of the Repair Demonstration and submission of the Repair Demonstration Report the ESA will have 30 days to review the report. If necessary the Contractor will have 30 days to correct any critical or major deficiencies after the ESA review of the Repair Demonstration Report. Upon a successful Repair Demonstration and approval of the Repair Demonstration Report by the ESA the PCO will notify the Contractor of the results. At this time the ESA will provide a letter to show that the Contractor has been unconditionally approved to repair the contract items.

1.11.11.3 Repair and Overhaul of production items will not commence until the Contractor has successfully passed the IPE and received the unconditional approval letter from the ESA. If the Contractor cannot pass the Site Visit or the Repair Demonstration in the time periods allotted this constitutes contract cancellation.

1.11.11.4 To perform IPE, the Government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials. The ESA may waive parts of the IPE as it deems appropriate.

1.11.11.5 To perform the IPE, the Contractor will follow the procedures of Appendix 4 –

Initial Production Evaluation (IPE) Procedures.

1.12 APPLICABLE TECHNICAL ORDERS

This is a preliminary list of Technical Orders. The Contractor is responsible for ensuring they are using the latest edition.

TECH ORDER BASIC CG CHANGE

NUMBER DATE NO DATE SHORT TITLE

00-5-1-WA-1 15 AUG 09 25 JAN 21 AF TECH ORDER SYSTEM

00-5-15-WA-1 1 JAN 10 01 JUL 20 TIME COMP TECH ORDER

00-20-1-WA-1 1 SEP 10 21 JUL 21 PREV MAINT PROG

FD2030-22-30576 Page 15 of 35

00-20-2-WA-1 1 SEP 10 22 JUL 21 MAINT DATA COLLECTION SYS

00-20-3-WA-1 1 NOV 08 10 JUL 17 MAINT PROC OF REPARABLE

PROP

00-25-113-F100—

ENG-WA-1

1 AUG 88 15 MAY 19 CRITICAL ALLOY AND

PRECIOUS METAL

00-35D-54-WA-1 1 NOV 11 15 APR 21 MATERIAL DEF REPORT &

INVEST SYSTEM

33B-1-1-WA-1 1 JAN 13 01 AUG 19 NONDESTRUCTIVE INSP.

METHODS

2-1-111-WA-1 15 FEB 90 01 AUG 21 STAND MAINT PROCEDURES

2J-F100-9-WA-1 1 NOV 95 01 AUG 21 NONDESTRUCTIVE INSPECTION

2J-F100-94-WA-1 1 MAY 92 01 JUN 21 IPB SUPPORT EQUIPMENT

2J-F100-13-1-WA-1 1 FEB 07 01 JUN 21 MAINT INSTR-DEPOT

2J-F100-13-2-WA-1 1 FEB 07 01 AUG 21 MAINT INSTR – DEPOT - OCM

2J-F100-13-5-WA-1 1 FEB 07 01 AUG 21 MAINT INSTR – DEPOT - ENG

2J-F100-24-WA-1 31 MAR 08 01 AUG 21 IPB F100-PW-220/220E

1.13 APPLICABLE DIRECTIVES

AIR FORCE

INSTRUCTION

CHANGE DATE

TITLE

AFI 21-101 26 MAR 21 MAINT MGMT OF

AIRCRAFT

AFI 21-118 02 JUL 18 IMP AERO EQUIP

RELIABILITY &

MAINTAINABILITY

MILITARY STANDARDS CHANGE DATE TITLE

MIL-STD-129P 09 JAN 08 U.S. MILITARY MARKING

FOR SHIPMENT AND

STORAGE

MIL-STD-130N 17 DEC 07 ID MARKING OF U.S.

FD2030-22-30576 Page 16 of 35

MILITARY PROP

INTERNATIONAL ORGANIZATION FOR STANDARIZATION (ISO)

ISO - 9001 15 NOV 08 QUALITY MGMT SYSTEMS –

REQUIREMENTS – 3RD EDITION

DEPARTMENT OF DEFENSE (DoD)

JOINT AERONAUTICAL 4 AUG 05 EXHIBIT H: UNIVERSAL

LOGISTICS COMMANDERS/ VENDOR SITE SURVEY

AVIATION CRITICAL SAFETY CHECKLIST

ITEM MANAGEMENT HANDBOOK

1.14 APPLICABLE DOCUMENTS

1.14.1 LPF-QR-001: BASIC TECHNICAL DATA REQUIREMENTS FOR

FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS

1.14.2 LPF-QR-002: CONDITIONS OF WAIVER FOR FRACTURE CRITICAL

AND DURABILITY CRITICAL PARTS

1.14.3 LPF-QAR-001: GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100

ENGINE FC/DC BREAKOUT COMPONENTS

1.14.4 LPF-QAR-002: CHANGE PROCEDURES FOR PROCESS

CONTROL DOCUMENTS

1.14.5 LPF-QAR-004: GENERAL QUALITY ASSURANCE REQUIREMENTS FOR

F100 ENGINE COMPONENTS

1.14.6 LPF-QAR-005: QUALITY LETTER OF INSTRUCTION FOR F100-

100/200/220/220E AUGMENTOR SPRAYRING MANIFOLD ASSEMBLIES

1.14.7 LPF-QAR-006: LPFR QUALITY ASSURANCE REQUIREMENTS

FOR PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND

REPORTS

1.14.8 LPF-QPR-004: LPFR QUALITY PLAN REQUIREMENTS FOR

WELDED ASSEMBLIES

1.14.9 LPF-QPR-007: LPFR QUALITY PLAN REQUIREMENTS FOR

PLASMA SPRAYED COATINGS

1.14.10 LPF-QPR-009: LPFR QUALITY PLAN REQUIREMENTS FOR

FD2030-22-30576 Page 17 of 35

VACUUM BRAZED ASSEMBLIES

1.14.11 LPF-QPR-016: LPFR QUALITY PLAN REQUIREMENTS FOR

DURABILITY CRITICAL PARTS

1.14.12 LPF-QPR-018: LPFR QUALITY PLAN REQUIREMENTS

FOR NONDESTRUCTIVE INSPECTION

1.14.13 EI FOR RQR-1: GENERIC ENGINEERING INSTRUCTIONS

FOR OVERHAUL OF F100 PARTS IN RQR-1

FD2030-22-30576 Page 18 of 35

SECTION II

SERVICE SUMMARY

The Contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The Contractor shall be aware that the absence contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Government will use the surveillance methods contained in the Surveillance Plan to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.

NOTE: For those requirements listed in Section II, Service Summary, the Surveillance Plan will follow the methods of surveillance specified in the Surveillance Plan. The Surveillance Plan is authorization for the Government’s PCO to participate in the administration of this contract.

2.1 SERVICE SUMMARY REQUIREMENTS

2.1.1 The Contractor shall ensure the performance objectives and performance thresholds identified in table 2-1 of this PWS are achieved as follows:

Table 2-1

Performance Objective

Reference Paragraph

Performance Threshold

SS-1 Quality:

The Contractorshall provide and utilize an inspection/quality system IAW

ISO- 9001.

PWS #s 1.3.1 100% compliance No defective parts shall be delivered to the Government.

SS-2 Delivery Performance:

The delivery schedules shall be IAW the contract delivery schedules.

PWS # 1.4.1 100% compliance The Contractor shall meet the delivery schedule

2.2 CONTRACTOR PERFORMANCE EVALUATION

FD2030-22-30576 Page 19 of 35

2.2.1 The Contractor shall be aware that the evaluation of performance will occur when the Program Manager evaluates the services of the Contractor to determine whether or not it meets the performance measures of the contract.

FD2030-22-30576 Page 20 of 35

2.2.1.1 SS-1: The Contractor’s failure to meet the requirements for this item shall result in the possibility of a poor rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under Federal Acquisition Regulation (FAR) 52.246- 4 Inspection of Services-Fixed Price.

2.2.1.2 SS-2: The Contractor’s failure to meet this requirement shall result in a negative CPAR rating and remedies as allowed under FAR 52.246-4 Inspection of Services- Fixed Price.

FD2030-22-30576 Page 21 of 35

SECTION III

GOVERNMENT PROPERTY

3.1 GOVERNMENT PROPERTY

3.1.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnish Material shall not be provided.

FD2030-22-30576 Page 22 of 35

APPENDIX 1

A1.1 ACRONYMS

ACO Administrative Contracting Officer AFLCMC Air Force Life Cycle Maintenance Center AFMC Air Force Material Command ALC Air Logistics Center CAGE Contractor and Government Entity CAO Contract Administration Office CEMS Comprehensive Engine Management System DOD Department of Defense EC Engineering Change ESA Engineering Source Authority (AFLCMC/LPSAAB) FAR Federal Acquisition Regulation GFM Government Furnished Material GFP Government Furnished Property GPA Government Property Administrator IAW In Accordance With IPE Initial Production Evaluation IPB Illustrated Parts Breakdown MRB Material Review Board NDI Nondestructive Inspection OEM Original Equipment Manufacturer PCO Procurement Contracting Officer PIR Publication Improvement Report PQDR Product Quality Deficiency Report PVA Product Verification Audit PWS Performance Work Statement QAD Quality Assurance Document QAR Quality Assurance Representative QCD Quality Control Deficiency SAR Source Approval Request SL Salvage Layout SR Service Remanufacture TO Technical Order USAF United States Air Force WP Work Package

FD2030-22-30576 Page 23 of 35

APPENDIX 2

A2.1 NOTES

A2.1.1 The Contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts.

Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR. The MRB shall be convened when the Contractor identifies non-conformance of material or parts during and after assembly. The MRB is not authorized to violate any TO limit. When MRB action is required on material or parts during and after assembly, the Contractor shall provide information, to include part number, serial number and statement of non-conformance and corrective action taken, to AFLCMC/LPSAA via email within (5) working days after approval of the MRB.

FD2030-22-30576 Page 24 of 35

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract overhaul work requirements or other contractual provisions.

In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the Contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of a overhauled item and Contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.

A3.2 TERMS EXPLAINED

A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original Contractor overhaul effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.

A3.2.2 Cognizant Quality Assurance Element. The DOD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the Contractor's plant.

A3.2.3 Overhaul Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for overhaul and rehabilitation of a reparable/unserviceable item.

A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:

A3.2.4.1 Failure by Contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by Contractor to follow established processes or procedures.

A3.3 RESPONSIBILITIES

A3.3.1 The Contractor shall:

FD2030-22-30576 Page 25 of 35

A3.3.1.1 Perform audit functions under the surveillance of the cognizant DOD CAO and Air Force Life Cycle Maintenance Center (AFLCMC) representative(s).

A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.

A3.3.2 The Cognizant DOD QAR shall:

A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring Contracting Officer (PCO).

A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.

A3.3.2.3 Notify the PCO and the Contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.

A3.4 AUDIT PROCEDURES

A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:

A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof.

Critical defects are furthered identified as follows:

A3.4.1.1.1 Category IA - Defect attributable to the Contractor's failure to comply with contractual requirements.

A3.4.1.1.2 Category IB - Defect not attributable to Contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property (GFP).

A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose. Major defects are further identified as follows:

A3.4.1.2.1 Category IIA - Defect attributable to the Contractor's failure to comply with

A3.4.1.2.2 Category IIB - Defect not attributable to Contractor's failure to comply with

FD2030-22-30576 Page 26 of 35 contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.

A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:

A3.4.1.3.1 Category IIIA - Defect attributable to the Contractor's failure to comply with

A3.4.1.3.2 Category IIIB - Defect not attributable to the Contractor.

A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the Contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.

A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.

A3.4.2 Scheduling/Frequency

A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.

A3.4.2.2 The Contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.

A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the

PCO or his designated representative has been obtained.

A3.4.3 Inspection and Test

A3.4.3.1 Audit candidates shall be randomly selected by the Cognizant DOD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.

A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the Contractor as in conformity with the contract and inspected by the Government and not rejected for failure to comply with contractual requirements.

FD2030-22-30576 Page 27 of 35

Upon completing the testing and disassembly portion of the audit of the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I or II defect is found in the audit candidate, the Contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.

A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container. A visual inspection and functional test shall be performed prior to disassembly.

A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants.

Normally, audit participation will be limited to specified Contractor production and quality control personnel, the Cognizant DOD QAR and AFLCMC personnel.

A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the Contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.

A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original Contractor effort as determined necessary by the Government.

A3.4.4 Corrective Actions

A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the Contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the Contractor will promptly advise the Government of the identity and destination of such previously shipped items.

A3.4.4.2 When Category IA, IIA or IIIA defects are found, the Contractor shall implement measures in the overhaul process which will preclude recurrence.

A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.

A3.4.4.4 When Category IV defects are noted, the Contractor shall take those actions necessary to preclude recurrence.

FD2030-22-30576 Page 28 of 35

A3.4.4.5 When Procedural Deficiencies are noted, the Contractor shall take those actions necessary to correct the procedures or operations concerned.

A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable overhaul specifications including preservation, packing, packaging, marking and update of records.

A3.4.4.7 After the audit is completed, the DOD QAR shall conduct a critique attended by

Contractor personnel and AFLCMC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The Contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.

A3.5 AUDIT RESULTS

A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible PCO the finalized audit findings within 10 working days after completion of the audit. Finalized findings will contain the following information:

A3.5.1.1 Name and address of the Contractor.

A3.5.1.2 Contract number.

A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.

A3.5.1.4 Summary of total defects.

A3.5.1.4.1 Category IA

A3.5.1.4.2 Category IB

A3.5.1.4.3 Category IIA

A3.5.1.4.4 Category IIB

A3.5.1.4.5 Category IIIA

A3.5.1.4.6 Category IIIB

FD2030-22-30576 Page 29 of 35

A3.5.1.4.7 Category IV

A3.5.1.5 A complete listing of audit findings.

A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.

A3.5.1.7 Cause(s) for each noted defect.

A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.

A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.

A3.5.1.10 The signature of the DOD QA participants, Contractor management personnel and

AFLCMC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non- concurrence by the Contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute."

FD2030-22-30576 Page 30 of 35

APPENDIX 4

A4.1 INITIAL PRODUCTION EVALUATION PROCEDURES

A4.1.1 This attachment contains procedures and instructions for contractual accomplishment of an Initial Production Evaluation (IPE). The contractual issuance of this attachment and performance of an IPE does not relieve the Contractor of the responsibility for maintaining a Quality Control System that will assure that production items conform to contractual requirements. The IPE is a management tool used to independently evaluate and validate the conformance of repaired or overhauled items to technical manual specifications. The IPE includes an evaluation of both a Site Visit and Repair Demonstration. Defects found during the evaluation process will be corrected and if necessary retesting of repaired or overhauled items will be done before production starts.

A4.2 TERMS EXPLAINED

A4.2.1 IPE. An IPE is a planned Government review of pre-production items and processes to evaluate a Contractor’s capability to complete the work stipulated in the contract.

The items must be repaired or overhauled in accordance with the technical order and other guidance stipulated in this PWA. The IPE is composed of a Site Survey and Repair Demonstration.

A4.2.2 Site Visit Survey. General survey of the Site Visit designed to provide confidence that a source has the capability and quality systems in place to repair or overhaul specific contract items.

A4.2.3 Repair Demonstration. A demonstration of the actual repair or overhaul of contract items. An evaluation of the Repair Demonstration will include a review of all the repair process documentation followed by inspection and destructive testing to determine that all the technical manual requirements have been met.

A4.2.4 Cognizant Quality Assurance Element. The DoD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the Contractor's plant.

A4.2.5 Defect/Deficiency. Any nonconformance of a characteristic with specified requirements.

A4.2.6 Procedural Deficiency. A deficiency which is noted during the site visit which results from a failure by Contractor to establish or follow processes or procedures in conformity with contractual requirements. These are typically errors of omission which can be corrected immediately.

FD2030-22-30576 Page 31 of 35

A4.2.7 Overhaul. An end item overhaul as prescribed within this PWS is the action taken to return the end item to a like-new condition. This overhaul process is consistent with re-manufacture as set forth in FAR 2.1003-6(a) (1).

A4.2.8 Repair. An end item repair is the action taken to return the end item to a serviceable condition by replacing the damaged parts that do not meet the technical manual inspection criteria IAW the applicable TOs.

A4.3 RESPONSIBILITIES

A4.3.1 The Contractor shall:

A4.3.1.1 Perform IPE functions under the surveillance of the cognizant DoD CAO and

Air Force Life Cycle Maintenance Center (AFLCMC) representative(s).

A4.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the IPE.

A4.3.1.3 Will conduct the Site Survey within 45 days of contract award. The Repair Demonstration and Evaluation will commence when the Site Survey has been approved by the ESA. Only upon completion and approval of the Repair Demonstration and Repair Evaluation will the Contractor be permitted to start production of repaired and overhauled items.

A4.3.1.4. Provide the DoD QAR and ESA representatives with the opportunity to visit the Contractor facility for one week during the Site Visit period to perform the Site Visit Checklist/Survey and one week during the Repair Demonstration period to witness repairs of the Augmentor Spray Manifolds.

A4.3.1.5 Provide a Repair Evaluation Report as described in this PWS and perform the destructive testing required by the report.

A4.3.2 The Cognizant DoD QAR shall:

A4.3.2.1 Be designated as IPE team chairman, unless otherwise directed by the Procuring Contracting Officer (PCO).

A4.3.2.2 Schedule the IPE composed of the Site Survey and the Repair Demonstration in coordination with the Contractor and ESA.

A4.3.2.3 Notify and coordinate with PCO and the Contractor when the IPE Site Survey will begin and also select the items to be surveyed and repaired.

A4.3.3 The ESA (AFMCLC/LPSAAB) shall:

A4.3.3.1 Shall be the final approval authority for the Site Visit Survey and the evaluation of the Repair Demonstration and Repair Evaluation Report.

FD2030-22-30576 Page 32 of 35

A.4.3.3.2 Shall have the responsibility and authority to determine which organization will perform the destructive testing required by the Repair Evaluation Report.

A4.4 SITE VISIT SURVEY REQUIREMENTS

A4.4.1 The Site Visit is intended to show the Contractor is ready to proceed into repair and overhaul of subject items and the Site Visit Survey is a report to verify the Contractor’s readiness:

1. The Site Visit Survey will be conducted with reference to the Joint Aeronautical Logistics Commanders, Aviation Critical Safety Item Management Handbook, Exhibit H, Manufacturing, Repair& Overhaul (R&O), and Quality Assurance (QA) Site Survey Checklist, UNIVERSAL VENDOR SITE SURVEY CHECKLIST.

2. The Site Visit shall be conducted in a period within 45 days of contract award. The site visit will be scheduled for five working days during one week.

3. At the time of Site Visit in conjunction with the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .