FA812122R0009.pdf

PDF 419 KB Posted

Attached to
F100-PW-220/229 Augmentor Fuel Controls and Accessories Federal contract opportunity
Solicitation number
FA8121-22-R-0009
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to F100-PW-220/229 Augmentor Fuel Controls and Accessories, newest first.
File Type Posted
FA812122R0009_______0001.pdf PDF
DI-ALSS-81535_CDRL.pdf PDF
DIDs.pdf PDF
Transportation_data.pdf PDF
Packaging_rqmts.pdf PDF
PWS_for_Overhaul_of_F100-PW-220_229_fuel_controls_and_accessories.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8121-22-R-0009

6.SOLICITATION ISSUE DATE

16 DEC 2021

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336412

8(A) SIZE STANDARD: 1,500

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

FMS REQUIREMENT

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

CRITICAL SAFETY ITEMS

BASIC PERIOD JUNE 1 2022 – MAY 31 2024

OPTION I - PRICED JUNE 1 2024 – MAY 31 2025

OPTION 2 - PRICED JUNE 1 2025 – MAY 31 2026

OPTION 3 - PRICED JUNE 1 2026 – MAY 31 2027

OPTION 4 - UNPRICED JUNE 1 2027 – MAY 31 2028

OPTION 5 - UNPRICED JUNE 1 2028 – MAY 31 2029

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (4 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS

UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN

AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND CONDITIONS STATED

HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8121

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR

OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Aircraft Engine and Engine Parts Manufacturing

9. (Agency Use)

LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION:

OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

17-JAN-2022 3:00PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZAAA

3001 STAFF DR STE 1AF1 98C

TINKER AFB OK 73145-3303

BUYER: Dawn Purtle/AFSC/PZAAA dawn.purtle.3@us.af.mil Phone: (405) 734- 8487

X

1. THIS CONTRACT IS A RATED ORDER UNDER

DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 17 JAN 2022 3:00 PM

SOLICITATION NUMBER FA812122R0009

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Dawn Purtle/AFSC/PZAAA

DEPARTMENT OF THE AIR FORCE, AFSC PZAAA

3001 STAFF DR STE 1AF1 98C

TINKER AFB OK 73145-3303

FA8121-22-R-0009

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

The resultant contract shall be for a 7-Year Requirements type contract (2 Year Basic, 3 Priced Option Years, and 2 Unpriced Option Years) for the Check, Test, and Overhaul of the F100-PW-220/229 Fuel Controls and Accessories specified in the schedule and as outlined in the attachments thereto. The best estimated quantity (BEQ) set forth for each line item is the best estimated total quantity the Government expects to order for Foreign Military Sales (FMS) over the applicable ordering period of the contract.

Any unit being overhauled that will Exceed 75% of the Stock List Price will be placed in a "HOLD" status until additional instructions are obtained from the PMS/Contracting Officer.

A packaging requirements document is attached to this solicitation and it includes 3 Special Packaging Instructions which lists detailed packaging instructions.

Accelerated delivery is desirable and acceptable.

CHECK, TEST & OVERHAUL - AUGMENTOR PUMP CONTROL

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

48 EA

CLIN ACRN ACRN Total

0001 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-206-0654 NZ 4061379,408022,441

294-3,441294-4

2915-01-206-0654 NZ 441738-4, 441738-5

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-206-0654 NZ 441738-5

NSN: 2915-01-206-0654 NZ

CONTROLLER,FUEL PUMP,AUGMENTOR (AFC)

Function: regulates augmentor fuel pump output Aluminum Associated Document(s) Line Item(s)

FD20302230576 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

CHECK, TEST & OVERHAUL - AUGMENTOR PUMP CONTROL

BASIC PERIOD

Title Number Date Tailoring

ISO 9001-2008 2008

AS9100 9100

NATO AQAP AQAP 2070

Foreign Military Sales :FMS Case:

Trade Agreement Act

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBC ORIGIN

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST & OVERHAUL - CONTROL-FUEL, AUGMENTOR (AFC)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

50 EA

CLIN ACRN ACRN Total

0002 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-217-0177 NZ 441418-5 THRU -11

AND/OR 441422

And/Or

Group 002 Input 2915-01-448-7298 NZ 441422-10 And/Or Group 003 Input 2915-01-475-6744 NZ 441422-11 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-217-0177 NZ 441422-11

NSN: 2915-01-217-0177 NZ

AUGMENTOR FUEL CONTROL (AA-U1)

Fit/Form/Function: The augmentor fuel control meters augmented fuel flow and controls distribution functions as scheduled by the digital electronic engine control. During augmentation, the control will supply the engine's augmentor sprayrings with fuel flow from individual pressure regulating and shutoff valves which are activated or deactivated sequentially by a segment sequencing valve.

Dimensions: approximately 21" L x 9" W x 12" HMaterial: Aluminum/Steel Associated Document(s) Line Item(s)

FD20302230576 0002

Limitations of Liability: Other Than High Value Item

CHECK, TEST & OVERHAUL - CONTROL-FUEL, AUGMENTOR (AFC)

BASIC PERIOD

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBC

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST & OVERHAUL - CIVV CONTROL CYLINDER (AV-AD 1)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Total Estimated Cost

44 EA

CLIN ACRN ACRN Total

0003 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 1650-01-206-7640 NZ 441291-4 And/Or Group 002 Input 1650-01-311-0130 NZ 441435, 4067837 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 1650-01-206-7640 NZ 441291-4 Group 002 Output 1650-01-311-0130 NZ 441435, 4067837

NSN: 1650-01-206-7640 NZ

CIVV control cylinder (AV-AD1) Basic function of Compressor Inlet Variable Vanes Controls and Cylinder is to modulate inlet vaiable vanes in (variable geometry) response to a signalfrom DEEC or Gas Generator Control Nickel alloy Associated Document(s) Line Item(s)

CHECK, TEST & OVERHAUL - CIVV CONTROL CYLINDER (AV-AD 1)

BASIC PERIOD

FD20302230576 0003

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act IUID Required: Yes Physical Item Markings:

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST & OVERHAUL - RCVV CYLINDER (AV-AE2)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

64 EA

CLIN ACRN ACRN Total

0004 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-206-7995 NZ 441293-3, 4061378 And/Or Group 002 Input 3040-01-377-7537 NZ 441720-3, 4071524 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-206-7995 NZ 441293-3 Group 002 Output 3040-01-377-7537 NZ 441720-3

NSN: 2995-01-206-7995 NZ

RCVV CYLINDER (AV-AE2)

To modulate rear compressor variable vanes in (variable geometry) response to a signal from DEEC or Gas Generator Control Predominantly Aluminum

FD20302230576 0004

CHECK, TEST & OVERHAUL - RCVV CYLINDER (AV-AE2)

BASIC PERIOD

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST & OVERHAUL - ACTUATOR, BALL SCREW, PRIMARY (AV-H3)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

22 EA

CLIN ACRN ACRN Total

0005 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-478-8902 NZ 4086389, 442116, 442116-4 And/Or

Group 002 Input 3040-01-468-1846 NZ 4085020, 442019 And/Or Group 003 Input 3040-01-277-5547 NZ 4074746, 441534, 440487-1 And/Or

Group 004 Input 3040-01-071-5952 NZ 4052340, 441085,441085-1

THRU -6

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-478-8902 NZ 442116-4

NSN: 3040-01-478-8902 NZ

ACTUATOR, BALL SCREW, PRIMARY (AV-H3)

Positions the convergent exhaust nozzle of the engine in response to convergent exhaust nozzle control output shaft rotation Stainless steel

CHECK, TEST & OVERHAUL - ACTUATOR, BALL SCREW, PRIMARY (AV-H3)

BASIC PERIOD

Associated Document(s) Line Item(s)

FD20302230576 0005

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST & OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

68 EA

CLIN ACRN ACRN Total

0006 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-478-8903 NZ 442115 And/Or Group 002 Input 3040-01-277-4737 NZ 4074745,441533,441

533-1,441533-2 And/Or

Group 003 Input 3040-01-071-8325 NZ 4052339,441083,441

083-1 THRU -4

And/Or

Group 004 Input 3040-01-468-1847 NZ 4085019, 442018 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-478-8903 NZ 442115-2

NSN: 3040-01-478-8903 NZ

ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

positions the convergent exhaust nozzles of the engine in response to the convergent exhaust nozzle output shaft rotation ams5613 stainless steel

CHECK, TEST & OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

BASIC PERIOD

Associated Document(s) Line Item(s)

FD20302230576 0006

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 10 EA *60 Calendar Days

Proposed Delivery

A TBC 10 EA

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

58 EA

CLIN ACRN ACRN Total

0007 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-474-3768 NZ 4086391, 442044 And/Or Group 002 Input 3040-01-324-9088 NZ 4076324, 441615 And/Or Group 003 Input 3040-01-459-0290 NZ 4085022, 442021 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-474-3768 NZ 442044-4

NSN: 3040-01-474-3768 NZ

ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

basic function is to position convergent exhaust nozzle of the engine in response to the convergent exhaust nozzle control output shaft rotation, 410 stainless steel

FD20302230576 0007

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

BASIC PERIOD

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

174 EA

CLIN ACRN ACRN Total

0008 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-474-3767 NZ 4086390, 442043-2 And/Or Group 002 Input 3040-01-459-0291 NZ 442020-2 And/Or Group 003 Input 3040-01-324-9089 NZ 4076323, 441614-2 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-474-3767 NZ 442043-2

NSN: 3040-01-474-3767 NZ

ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

Primary nozzel consists of an input gearbox with croos shaft an a reduction gear driving a ball screw shaft. It transmits driving force to four secondary nozzles installed on the augmentor nozzle.

Dimensions: 18" length (approx.) X 5 1/2" wirth (approx.) X 6" height (approx.) (Retracted). Material: Steel (Nitrallloy).

Associated Document(s) Line Item(s)

FD20302230576 0008

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

BASIC PERIOD

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE CONVERGEN (TO-L1)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

66 EA

CLIN ACRN ACRN Total

0009 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-450-2816 NZ 441991-11 And/Or Group 002 Input 2995-01-206-0648 NZ 4061375,4069397,44

1290-5,441476 And/Or

Group 003 Input 2915-01-448-7297 NZ 441476-6 THRU 441476-11

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-540-2816 NZ 441991-11

NSN: 2995-01-450-2816 NZ

CONTROL,EXHAUST NOZZLE CONVERGEN (TO-L1)

Function: Drives and controls the modulating area nozzle on the F100 AC engine.

Dimensions: 14.195" L x 3.99" W x 9,8" H. Weight 17.11 lbs. Material: Nickel alloy.

Associated Document(s) Line Item(s)

FD20302230576 0009

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE CONVERGEN (TO-L1)

BASIC PERIOD

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE,TURBINE E (TN-A1)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

70 EA

CLIN ACRN ACRN Total

0010 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-433-6462 NZ 4083219, 441944, 441944-10 And/Or

2995-01-433-6462 NZ 441944-ISS10 And/Or Group 002 Input 2995-01-319-5004 NZ 4076322, 441612 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-433-6462 NZ 441944-10

NSN: 2995-01-433-6462 NZ

CONTROL,EXHAUST NOZZLE,TURBINE E (TN-A1)

The CENC is used to drive the modulating area of the exhaust nozzle on F100-PW-229 engines installed on F-15/F-16 acft.

provides power to position the nozzle.

Aluminum Associated Document(s) Line Item(s)

FD20302230576 0010

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE,TURBINE E (TN-A1)

BASIC PERIOD

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 7 EA *60 Calendar Days

Proposed Delivery

A TBC 7 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,FILL SWITCH ASSEMBLY

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

4 EA

CLIN ACRN ACRN Total

0011 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-222-8336 NZ 351014, 351014A And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-222-8336 NZ 351014

NSN: 2995-01-222-8336 NZ

MODULE KIT,FILL SWITCH ASSEMBLY

The fill switch module is used to signal the DEEC when each segment manifold is full.

Predominately AMS 5613 CRES Associated Document(s) Line Item(s)

FD20302230576 0011

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF

CHECK, TEST AND OVERHAUL - MODULE KIT,FILL SWITCH ASSEMBLY

BASIC PERIOD

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER AND COVER,PL

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

30 EA

CLIN ACRN ACRN Total

0012 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-222-5690 NZ 351006A, 351019, 351019A And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-222-5690 NZ 351019

NSN: 2915-01-222-5690 NZ

MODULE KIT,RESOLVER AND COVER,PL

Function: Regulates the power level angle (PLA) for the main fuel control.

Dimensions: 6" l x 6" w x 10" h and it weighs 3lbs. Material: cast aluminum Associated Document(s) Line Item(s)

FD20302230576 0012

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER AND COVER,PL

BASIC PERIOD

Title Number Date Tailoring

ISO 9001-2008 2008

Only Domestic End Products Acceptable Foreign Military Sales :FMS Case:

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER ASSY

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

16 EA

CLIN ACRN ACRN Total

0013 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-224-0775 NZ 351019 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-224-0775 NZ 351019

NSN: 2915-01-224-0775 NZ

MODULE KIT,RESOLVER ASSY

FUNCTION: THE VAVLE CONVERTS AN ELECTRICAL SIGNAL INTO PRESSURE SIGNAL THAT IN TURN IS USED TO SCHEDULE FUEL

FLOW INTO THE AUGMENTOR

DIM: 10" L; 10" W; 10" H; 10 LBS W.; MATERIAL: ALUMINUM/STEEL

Associated Document(s) Line Item(s)

FD20302230576 0013

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER ASSY

BASIC PERIOD

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - MODULE KIT, RESOLVER

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

18 EA

CLIN ACRN ACRN Total

0014 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-222-5691 NZ 351007, 351007A, BE351007A

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-222-5691 NZ 351007

NSN: 2995-01-222-5691 NZ

MODULE KIT,RESOLVER

Used to install the GG metering resolver valve and HSG on UFC Nickel alloy Associated Document(s) Line Item(s)

FD20302230576 0014

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

CHECK, TEST AND OVERHAUL - MODULE KIT, RESOLVER

BASIC PERIOD

Foreign Military Sales :FMS Case:

Trade Agreement Act Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - CIVV CYLINDER (AV-AF1)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

18 EA

CLIN ACRN ACRN Total

0015 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-206-7994 NZ 441292, 441292-3 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-206-7994 NZ 441292-3

NSN: 2995-01-206-7994 NZ

CIVV CYLINDER (AV-AF1)

Modulates fuel pressure through the pressure extend and retract tubes through bellcranks to the compressor stator inlet synchronizing ring which pivots the vanes equally and in unison.

Aluminum Associated Document(s) Line Item(s)

FD20302230576 0015

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act

CHECK, TEST AND OVERHAUL - CIVV CYLINDER (AV-AF1)

BASIC PERIOD

IUID Required: No Physical Item Markings:

Serial Number Required Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - CIVV CYLINDER (AV-AF1)

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

14 EA

CLIN ACRN ACRN Total

0016 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-311-0131 NZ 441436, 44143604, 4067838 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-311-0131 NZ 441436-4

NSN: 3040-01-311-0131 NZ

CIVV CYLINDER (AV-AF1)

This cylinder assembly actuator varies compressor inlet variable vanes for the F100 engine.

Aluminum Associated Document(s) Line Item(s)

FD20302230576 0016

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act IUID Required: Yes

CHECK, TEST AND OVERHAUL - CIVV CYLINDER (AV-AF1)

BASIC PERIOD

Physical Item Markings:

Serial Number Required Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - COMPRESSOR BLEED CYLINDER

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

20 EA

CLIN ACRN ACRN Total

0017 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-00-295-2481 NZ 4020236, 440477-1

THRU -3

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-00-295-2481 NZ 440477-3

NSN: 2995-00-295-2481 NZ

COMPRESSOR BLEED CYLINDER

FUNCTION: OPENS PORT TO BLEED OFF EXCESS PRSSURE DURING ENGINE START

DIM: 5L; 3W; 4H; 4LBS; MATERIAL: ALUMINUM

Associated Document(s) Line Item(s)

FD20302230576 0017

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Class I ODS Substance Application/Use Quantity

NONE

CHECK, TEST AND OVERHAUL - COMPRESSOR BLEED CYLINDER

BASIC PERIOD

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,SENSOR,TEMPERATURE

BASIC YEAR

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

14 EA

CLIN ACRN ACRN Total

0018 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-224-0778 NZ 351000 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-224-0778 NZ 351000

NSN: 2915-01-224-0778 NZ

MODULE KIT,SENSOR,TEMPERATURE

temp sensor of MFC nickel alloy Associated Document(s) Line Item(s)

FD20302230576 0018

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

CHECK, TEST AND OVERHAUL - MODULE KIT,SENSOR,TEMPERATURE

BASIC YEAR

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - FUEL CONTROL,MAIN,TURBINE ENGINE

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

32 EA

CLIN ACRN ACRN Total

0019 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-462-4218 NZ 441610-21 And/Or Group 002 Input 2915-01-342-3809 NZ 4076175, 4089352 And/Or

2915-01-342-3809 NZ 4410610-14 THRU

-21, 442632-23

And/Or

Group 003 Input 2915-01-214-7309 NZ 4066012, 4066012-001

And/Or

2915-01-214-7309 NZ 441396-14 THRU -21,

442646-23

And/Or

Group 004 Input 2915-01-342-3810 NZ 4071785, 4071785-001

And/Or

2915-01-342-3810 NZ 441583-14 THRU -19,

442645-23

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-342-3809 NZ 442632-23

NSN: 2915-01-342-3809 NZ

FUEL CONTROL,MAIN,TURBINE ENGINE

A Hydromechanical device which affects control of fuel flow to the Gas Generator of the F100-PW-220 Engine throughout all operating conditions.

Aluminum / Steel Associated Document(s) Line Item(s)

FD20302230576 0019

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

CHECK, TEST AND OVERHAUL - FUEL CONTROL,MAIN,TURBINE ENGINE

BASIC PERIOD

Foreign Military Sales :FMS Case:

Trade Agreement Act IUID Required: Yes Physical Item Markings:

Serial Number Required Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 15 EA *60 Calendar Days

Proposed Delivery

A TBC 15 EA

CHECK, TEST AND OVERHAUL - FUEL CONTROL,MAIN,TURBINE ENGINE

BASIC PERIOD

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

10 EA

CLIN ACRN ACRN Total

0020 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-407-1507 NZ 4071523, 4089355, 441721 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-407-1507 NZ 441721

NSN: 2915-01-407-1507 NZ

FUEL CONTROL,MAIN,TURBINE ENGINE

Mounted under the engine at the 6:00 o'clock position under the front duct. The prupose of the Main Fuel Control is to control a proper flow of jet fuel to the engine main fuel nozzles and controls through all modes of engine operations.

Size/Dimensions: 21 inches long X 12 inches wide X 10 inches high. Predominant Material: Aluminum Alloy, low alloy steel, stainless steel.

Associated Document(s) Line Item(s)

FD20302230576 0020

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

CHECK, TEST AND OVERHAUL - FUEL CONTROL,MAIN,TURBINE ENGINE

BASIC PERIOD

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

DATA (BASIC AND ALL OPTIONS)

BASIC PERIOD

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

CDRL

Contractor shall provide the data identified in Section J, Exhibit A in accordance with the Performance Work Statment hereof.

The Government shall have unlimited rights to all test materials, documents, notes, records, and software documentation meeting the criteria specified in DFARS 252.227-7015 (b)(1).

Associated Document(s) Line Item(s)

FD20302230576 0021

Foreign Military Sales :FMS Case:

OVER AND ABOVE (BASIC AND ALL OPTIONS)

BASIC PERIOD

Item No.

To Be Negotiated Quantity U/I Unit Price

1 LO TBN

OVER

Over and Above OTHER SHIPPING AND PACKAGING CHARGES RELATED TO INCORRECT ASSET SHIPMENT FROM FOREIGN MILITARY SALES (FMS)

COUNTRY

Associated Document(s) Line Item(s)

FD20302230576 0022

CHECK, TEST & OVERHAUL - AUGMENTOR PUMP CONTROL

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

24 EA

CLIN ACRN ACRN Total

1001 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-206-0654 NZ 4061379,408022,441

294-3,441294-4

2915-01-206-0654 NZ 441738-4, 441738-5

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-206-0654 NZ 441738-5

NSN: 2915-01-206-0654 NZ

CONTROLLER,FUEL PUMP,AUGMENTOR (AFC)

Function: regulates augmentor fuel pump output Aluminum Associated Document(s) Line Item(s)

FD20302230576 0001

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBC ORIGIN

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed

A TBC 5 EA

CHECK, TEST & OVERHAUL - CONTROL-FUEL, AUGMENTOR (AFC)

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

25 EA

CLIN ACRN ACRN Total

1002 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-217-0177 NZ 441418-5 THRU -11

AND/OR 441422

And/Or

Group 002 Input 2915-01-448-7298 NZ 441422-10 And/Or Group 003 Input 2915-01-475-6744 NZ 441422-11 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-217-0177 NZ 441422-11

NSN: 2915-01-217-0177 NZ

AUGMENTOR FUEL CONTROL (AA-U1)

Fit/Form/Function: The augmentor fuel control meters augmented fuel flow and controls distribution functions as scheduled by the digital electronic engine control. During augmentation, the control will supply the engine's augmentor sprayrings with fuel flow from individual pressure regulating and shutoff valves which are activated or deactivated sequentially by a segment sequencing valve.

Dimensions: approximately 21" L x 9" W x 12" HMaterial: Aluminum/Steel Associated Document(s) Line Item(s)

FD20302230576 0002

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBC

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed

CHECK, TEST & OVERHAUL - CONTROL-FUEL, AUGMENTOR (AFC)

OPTION 1

A TBC 5 EA

CHECK, TEST & OVERHAUL - CIVV CONTROL CYLINDER (AV-AD 1)

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Total Estimated Cost

22 EA

CLIN ACRN ACRN Total

1003 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 1650-01-206-7640 NZ 441291-4 And/Or Group 002 Input 1650-01-311-0130 NZ 441435, 4067837 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 1650-01-206-7640 NZ 441291-4 Group 002 Output 1650-01-311-0130 NZ 441435, 4067837

NSN: 1650-01-206-7640 NZ

CIVV control cylinder (AV-AD1) Basic function of Compressor Inlet Variable Vanes Controls and Cylinder is to modulate inlet vaiable vanes in (variable geometry) response to a signalfrom DEEC or Gas Generator Control Nickel alloy Associated Document(s) Line Item(s)

FD20302230576 0003

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act IUID Required: Yes Physical Item Markings:

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed

CHECK, TEST & OVERHAUL - CIVV CONTROL CYLINDER (AV-AD 1)

OPTION 1

A TBC 5 EA

CHECK, TEST & OVERHAUL - RCVV CYLINDER (AV-AE2)

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

32 EA

CLIN ACRN ACRN Total

1004 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-206-7995 NZ 441293-3, 4061378 And/Or Group 002 Input 3040-01-377-7537 NZ 441720-3, 4071524 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-206-7995 NZ 441293-3 Group 002 Output 3040-01-377-7537 NZ 441720-3

NSN: 2995-01-206-7995 NZ

RCVV CYLINDER (AV-AE2)

To modulate rear compressor variable vanes in (variable geometry) response to a signal from DEEC or Gas Generator Control Predominantly Aluminum Associated Document(s) Line Item(s)

FD20302230576 0004

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed

CHECK, TEST & OVERHAUL - ACTUATOR, BALL SCREW, PRIMARY (AV-H3)

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

11 EA

CLIN ACRN ACRN Total

1005 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-478-8902 NZ 4086389, 442116, 442116-4 And/Or

Group 002 Input 3040-01-468-1846 NZ 4085020, 442019 And/Or Group 003 Input 3040-01-277-5547 NZ 4074746, 441534, 440487-1 And/Or

Group 004 Input 3040-01-071-5952 NZ 4052340, 441085,441085-1

THRU -6

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-478-8902 NZ 442116-4

NSN: 3040-01-478-8902 NZ

ACTUATOR, BALL SCREW, PRIMARY (AV-H3)

Positions the convergent exhaust nozzle of the engine in response to convergent exhaust nozzle control output shaft rotation Stainless steel Associated Document(s) Line Item(s)

FD20302230576 0005

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed

CHECK, TEST & OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

34 EA

CLIN ACRN ACRN Total

1006 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-478-8903 NZ 442115 And/Or Group 002 Input 3040-01-277-4737 NZ 4074745,441533,441

533-1,441533-2 And/Or

Group 003 Input 3040-01-071-8325 NZ 4052339,441083,441

083-1 THRU -4

And/Or

Group 004 Input 3040-01-468-1847 NZ 4085019, 442018 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-478-8903 NZ 442115-2

NSN: 3040-01-478-8903 NZ

ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

positions the convergent exhaust nozzles of the engine in response to the convergent exhaust nozzle output shaft rotation ams5613 stainless steel Associated Document(s) Line Item(s)

FD20302230576 0006

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 10 EA *60 Calendar Days

Proposed

A TBC 10 EA

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

29 EA

CLIN ACRN ACRN Total

1007 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-474-3768 NZ 4086391, 442044 And/Or Group 002 Input 3040-01-324-9088 NZ 4076324, 441615 And/Or Group 003 Input 3040-01-459-0290 NZ 4085022, 442021 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-474-3768 NZ 442044-4

NSN: 3040-01-474-3768 NZ

ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

basic function is to position convergent exhaust nozzle of the engine in response to the convergent exhaust nozzle control output shaft rotation, 410 stainless steel Associated Document(s) Line Item(s)

FD20302230576 0007

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

OPTION 1

Item No.

CHECK, TEST AND OVERHAUL - ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

OPTION 1

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

87 EA

CLIN ACRN ACRN Total

1008 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 3040-01-474-3767 NZ 4086390, 442043-2 And/Or Group 002 Input 3040-01-459-0291 NZ 442020-2 And/Or Group 003 Input 3040-01-324-9089 NZ 4076323, 441614-2 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 3040-01-474-3767 NZ 442043-2

NSN: 3040-01-474-3767 NZ

ACTUATOR-BALL SCREW, SECONDARY (AV-G3)

Primary nozzel consists of an input gearbox with croos shaft an a reduction gear driving a ball screw shaft. It transmits driving force to four secondary nozzles installed on the augmentor nozzle.

Dimensions: 18" length (approx.) X 5 1/2" wirth (approx.) X 6" height (approx.) (Retracted). Material: Steel (Nitrallloy).

Associated Document(s) Line Item(s)

FD20302230576 0008

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE CONVERGEN (TO-L1)

OPTION 1

Item No.

Firm Fixed Price

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE CONVERGEN (TO-L1)

OPTION 1

Best Estimated Qty

U/I Unit Price Estimated Total Price

33 EA

CLIN ACRN ACRN Total

1009 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-450-2816 NZ 441991-11 And/Or Group 002 Input 2995-01-206-0648 NZ 4061375,4069397,44

1290-5,441476 And/Or

Group 003 Input 2915-01-448-7297 NZ 441476-6 THRU 441476-11

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-540-2816 NZ 441991-11

NSN: 2995-01-450-2816 NZ

CONTROL,EXHAUST NOZZLE CONVERGEN (TO-L1)

Function: Drives and controls the modulating area nozzle on the F100 AC engine.

Dimensions: 14.195" L x 3.99" W x 9,8" H. Weight 17.11 lbs. Material: Nickel alloy.

Associated Document(s) Line Item(s)

FD20302230576 0009

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE,TURBINE E (TN-A1)

OPTION 1

Item No.

CHECK, TEST AND OVERHAUL - CONTROL,EXHAUST NOZZLE,TURBINE E (TN-A1)

OPTION 1

Best Estimated Qty

U/I Unit Price Estimated Total Price

35 EA

CLIN ACRN ACRN Total

1010 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-433-6462 NZ 4083219, 441944, 441944-10 And/Or

2995-01-433-6462 NZ 441944-ISS10 And/Or Group 002 Input 2995-01-319-5004 NZ 4076322, 441612 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-433-6462 NZ 441944-10

NSN: 2995-01-433-6462 NZ

CONTROL,EXHAUST NOZZLE,TURBINE E (TN-A1)

The CENC is used to drive the modulating area of the exhaust nozzle on F100-PW-229 engines installed on F-15/F-16 acft.

provides power to position the nozzle.

Aluminum Associated Document(s) Line Item(s)

FD20302230576 0010

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 7 EA *60 Calendar Days

Proposed Delivery

A TBC 7 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,FILL SWITCH ASSEMBLY

OPTION 1

Item No.

CHECK, TEST AND OVERHAUL - MODULE KIT,FILL SWITCH ASSEMBLY

OPTION 1

Best Estimated Qty

U/I Unit Price Estimated Total Price

2 EA

CLIN ACRN ACRN Total

1011 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2995-01-222-8336 NZ 351014, 351014A And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-222-8336 NZ 351014

NSN: 2995-01-222-8336 NZ

MODULE KIT,FILL SWITCH ASSEMBLY

The fill switch module is used to signal the DEEC when each segment manifold is full.

Predominately AMS 5613 CRES Associated Document(s) Line Item(s)

FD20302230576 0011

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER AND COVER,PL

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER AND COVER,PL

OPTION 1

15 EA

CLIN ACRN ACRN Total

1012 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-222-5690 NZ 351006A, 351019, 351019A And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-222-5690 NZ 351019

NSN: 2915-01-222-5690 NZ

MODULE KIT,RESOLVER AND COVER,PL

Function: Regulates the power level angle (PLA) for the main fuel control.

Dimensions: 6" l x 6" w x 10" h and it weighs 3lbs. Material: cast aluminum Associated Document(s) Line Item(s)

FD20302230576 0012

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Only Domestic End Products Acceptable Foreign Military Sales :FMS Case:

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 5 EA *60 Calendar Days

Proposed Delivery

A TBC 5 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER ASSY

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

8 EA

CHECK, TEST AND OVERHAUL - MODULE KIT,RESOLVER ASSY

OPTION 1

CLIN ACRN ACRN Total

1013 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 2915-01-224-0775 NZ 351019 And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2915-01-224-0775 NZ 351019

NSN: 2915-01-224-0775 NZ

MODULE KIT,RESOLVER ASSY

FUNCTION: THE VAVLE CONVERTS AN ELECTRICAL SIGNAL INTO PRESSURE SIGNAL THAT IN TURN IS USED TO SCHEDULE FUEL

FLOW INTO THE AUGMENTOR

DIM: 10" L; 10" W; 10" H; 10 LBS W.; MATERIAL: ALUMINUM/STEEL

Associated Document(s) Line Item(s)

FD20302230576 0013

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Trade Agreement Act Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

_ Req No / Pri

Required Delivery

A TBC 2 EA *60 Calendar Days

Proposed Delivery

A TBC 2 EA

CHECK, TEST AND OVERHAUL - MODULE KIT, RESOLVER

OPTION 1

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

9 EA

CLIN ACRN ACRN Total

1014 AA

GROUP STOCK NO P/N CAGE

CHECK, TEST AND OVERHAUL - MODULE KIT, RESOLVER

OPTION 1

Group 001 Input 2995-01-222-5691 NZ 351007, 351007A, BE351007A

And/Or

GROUP STOCK NO P/N CAGE

Group 001 Output 2995-01-222-5691 NZ 351007

NSN: 2995-01-222-5691 NZ

MODULE KIT,RESOLVER

Used to install the GG metering resolver valve and HSG on UFC Nickel alloy Associated Document(s) Line Item(s)

FD20302230576 0014

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .