PWS_FD2060-21-00017.pdf

PDF 271 KB Posted

Attached to
B-52 APQ-166 Magnetron/Electron Tube
Solicitation number
21-00017
Issued by

About this file

This is a Performance Work Statement (PWS) for depot-level repair services of the AN/APQ-166 Strategic Radar System Electron Tube (NSN 5960-01-318-0987AY, Part Number VMX-1849) used in B-52H aircraft. The contract period consists of a one-year basic period plus four 12-month ordering periods and an optional six-month extension, with a combined line item maximum delivery rate of two units per month. Services will be performed at Communication & Power Industries, LLC's facility in Beverly, Massachusetts, under a Firm-Fixed Price Requirements contract structure.

The contractor must provide functional testing, inspection, fault isolation, repair, and packaging to return unserviceable assets to serviceable condition within established turn-around times. Key performance thresholds include no more than one Quality Deficiency Report (QDR) per contract quarter, compliance with negotiated delivery schedules, and monthly reporting in the Commercial Asset Visibility Air Force (CAV-AF) system. Additional requirements include strict government property accountability per FAR Part 45, maintenance of an ISO 9001:2000 compliant quality management system, proper packaging per military standards (MIL-STD-129R, MIL-STD-2073-1E), counterfeit parts prevention, submission of eight Contract Data Requirements List (CDRL) deliverables addressing areas such as CAV-AF reporting and engineering change proposals, and compliance with safety, security, and environmental regulations. For Mission Incapable Aircraft (MICAP) or Joint Chiefs of Staff backorder requirements, repaired items must be delivered within 90 working days with initial response to requests within eight business hours.

View the file

Other files

File Type Posted
RFI for Follow-on FA853922D0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-20-00016 PWS REVISION: 0

Distribution Statement: A

Performance Work Statement for

AN/APQ-166 Strategic Radar System Electron Tube

Purchase Request: FD2060-21-00017

22 September 2020

Distribution Statement A: “Approved for public release. Distribution is unlimited.”

1.0 Description of Services

1.1 Objective(s): This Performance-based Work Statement (PWS) describes the services required to furnish services and material necessary for essential depot level repair. These services include functional testing, inspection, and packaging of the National Stock Number (NSN) items listed in Appendix B of this PWS. The Contractor shall fault isolate, repair and test unserviceable assets along with track and resolve items affected by Product Quality Deficiency Reports (PQDR) while performing depot level repair, functional testing, inspection, and packaging. The period of performance shall consist of a basic one-year period after contract award plus four ordering periods and an optional six month extension. The contract type is a Firm-Fixed Price Requirements contract for all ordering periods. The Contractor shall repair assets to serviceable condition within the established Turn-Around Time (TAT). The Contractor shall also provide timely and accurate reporting in Commercial Asset Visibility Air Force (CAVAF) system.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by providing continued support for the APQ-166 Electron Tube. The APQ-166 is the Strategic Radar System on the B-52 aircraft.

1.3 Background: The APQ-166 is a multiple- mode radar set that provide ground mapping, terrain avoidance, and radar beacon operation for the B-52H aircraft. Electron Tube produces a radio frequency that goes into the Radar Transmitter (RTM) that allows the crew to see the terrain the aircraft is flying over. The NSN associated with this effort is: 5960-01-318-0987AY, Part Number VMX-1849.

2.0 Services Summary

Performance Objective PWS

Reference Performance Threshold

Quality of Repair 4.9.2 There shall be no more than one QDR per contract quarter.

Delivery of repair 4.4 The turn-around-time required is IAW the official negotiated Contract Delivery Schedule. After Receipt of (ARO) Funded Order or Reparable Assets, whichever is later, at a combined line item maximum rate of two units per month. Performance is satisfactory when the contractor delivers fully repaired and operational units.

CAV-AF Reporting 4.3.3 The Contractor shall report production in CAV-AF.

The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. The Contractor shall submit all monthly GFM and Production reports within 5 business days of the last day of each month. The

Contractor shall submit annual inventory reports within 7 calendar days of the end of the reporting period and annually thereafter.

Adherence to Contractor Quality Management System (QMS)

5.10 Contractor shall submit and comply with their QMS.

3.0 Government Property

3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) Part 45 and as specified in the contract/order.

3.2 Government Property to be provided: See Appendix B.

3.3 Reporting of Government Property: The Contractor shall create and maintain records of all Government property accountable to the contract/order. The Contractor shall record receipt and return of Government-Furnished Property (GFP) in the Item Unique Identification (IUID) Registry.

3.4 Loss of Government Property

3.4.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.4.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access to eTools. The contractor shall also notify the PCO and Program Manager (PM) of any lost property.

3.4.3 Return/Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

3.4.4 Government System(s): Contractor will be required to access Commercial Asset Visibility (Air Force) CAV-AF to perform tasks under the contract/order.

4.0 Technical Requirements

4.1 Period and Place of Performance: Five years, Communication & Power Industries, LLC 150 Sohier Road, Beverly, MA 01915-5536.

4.1.1 Contract/Order Period of Performance: The period of performance for the contract/order is a one year basic period plus four 12 month out year ordering periods with an optional six (6) month extension period per 52.217-8, Option to Extend Services.

4.1.2 Place of Performance: These services will be performed at the Contractor’s facility.

4.1.3 Obsolete Parts: The Contractor shall notify the Government of evolving obsolete part conditions and make recommendations including last-time buy opportunities and any redesign that may ensue. Requests for funding and all related issues will be sent to the Procurement Contracting Officer (PCO) and the 407th Program Manager. Replacement parts or redesign will be recommended by the contractor to minimize impact but must be approved by the Government

MFT.

4.1.4 Condemnation: A repair shall be considered for condemnation if physical damage such as fire, explosion, flood, aircraft crash, enemy combat action substantially destroys the physical and electrical integrity of the unit.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier

DID Title PWS Reference(s)

A001-E001 DI-MGMT-

81838

Commercial Asset Visibility Air Force (CAVAF) Contractor Furnished Material End Item Reporting

4.3.3

A002-E002 DI-SESS-

80639D

Engineering Change Proposal (ECP) 4.3.4

A003-E003 DI-MISC-

80071E

Parts Approval Request 4.3.7

A004-E004 DI-QCIC-

81722

Quality Program Plan 5.10

A005-E005 DI-MISC-

81832

Counterfeit Electronics Parts;

Avoidance, Detection, Mitigation, and Disposition

4.3.8

A006-E006 DI-MGMT-

80441C

Government Property Inventory Report 4.3.3.1

A007-E007 DI-MGMT-

81995

Contract Depot Maintenance Production Report

4.3.3.2

A008-E008 DI-ENVR-

81375/T

Environmental Health and Safety Plan

(HSP)

5.5.2

4.2.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any single deliverable. There shall be no more than one total rejection(s) of deliverables per contract year.

The Government will reject a deliverable if any technical errors or five or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within eight business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable: CDRL deliverables shall be submitted via Procurement Integrated Enterprise Environment (PIEE) / Wide Area WorkFlow (WAWF) and/or submitted directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements. There shall be no more than one late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 Repair

4.3.1 Item Unique Identification

4.3.1.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.

4.3.1.2 Reporting in IUID Registry

4.3.1.2.1 Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.

4.3.2 Packaging: The Contractor shall package and mark material in accordance with the contract/order, Air Force Materiel Command (AFMC) Form 158, Packaging Requirements;

MIL-STD-129R, Department of Defense Standard Practice / Military Marking for Shipment Storage; MIL-STD-129 and MIL-STD-130, Department of Defense Standard Practice / Identification Marking of U.S. Military Property; and MIL-STD-2073-1E , Standard Practice for Military Packaging. The Contractor shall package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety and environmental concerns. The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to static discharge damage in accordance withANSI S20.20) andMIL-HDBK-263-B, Military Handbook: Electrostatic Discharge Control Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices). In accordance with MIL-STD-2073-1D, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.

4.3.3 Commercial Asset Visibility-Air Force (CAVAF): The Contractor shall report production using

CAVAF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur. The following metrics will be monitored: GFM In- Transit, Repairable GFM Accountability and Assets Not on Contract. If CAVAF training is required, Contractor personnel may send an email to: 406scms.CAVAF.af.ar@us.af.mil.

[CDRL A001-E001, DI-MGMT-81838, Commercial Asset Visibility Air Force (CAVAF) Contractor Furnished Material End Item Reporting]

4.3.3.1 Government Property Inventory Report: The Contractor report shall provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) applicable to this contract. This Data Item Description (DID) is applicable where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of this contract. Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year’s time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

[CDRL A006-E006, DI-MGMT-80441C, Government Property Inventory Report] mailto:406scms.cav.af.ar@us.af.mil

4.3.3.2 GFM and Production Report(s): The Contractor report shall provide the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems within 5 business days of the last day of each month.

[CDRL A007-E007, DI-MGMT-81995, Contract Depot Maintenance Production Report]

4.3.4 Engineering Change Proposal (ECP): The Contractor shall submit a Class I ECP for all changes to the baseline configuration. The ECPs submitted shall be technically accurate, complete, clearly written, and systematically account for the proposed configuration changes.

The Contractor shall notify the Government of all Class II changes, including all substitute parts through Document Change Notices (DCN) within 30 calendar days. ECP’s should be submitted IAW the CDRL. [CDRL A002-E002, DI-SESS-80639D, Engineering Change Proposal]

4.3.5 Test, Teardown, and Evaluation (TT&E): Performed by the Contractor to determine the cause of failure prior to conducting actual repair of the item. When situations occur that the Contractor needs to determine the extent of repair or where an asset is provided to the Contractor for repair, but the Contractor cannot duplicate the fault, known as a No Fault Found (NFF), the Contractor shall notify the PCO within five business days. The Contractor shall not charge the full repair cost, but only the firm fixed price associated with negotiated NFF or TT&E actions Contract Line Item Number (CLIN).

4.3.6 Acceptance Test Procedures (ATP)

4.3.6.1 All products delivered to the government, shall be tested on the Factory Test Station and shall meet the minimum performance specifications. Repaired items shall be defect free. If ATP fails on any component, then entire unit is rejected. Cosmetic or other defects that do not affect form, fit, or function of the hardware will not be repaired under the contract.

4.3.7 Parts Approval Request: Parts/components of an end item determined defective shall be replaced with equivalent serviceable parts. Contractor furnished material (CFM) or parts used for replacement shall equal or exceed the quality of the original material or parts. If the contractor utilizes replacement parts exceeding quality of original material it shall be at no additional cost to the Government. The material or parts shall be entirely suitable for repair of the end item for its intended purposes and shall be completely interchangeable without alterations of either the subassemblies or the end item. Nonstandard parts, as defined as non-Mil-Standard or commercial equivalent, that are used in repairs must be approved by 407 SCMS/GUEA via submittal to PIEE/WAWF. [CDRL A003-E003, DI-MISC-80071E, Parts Approval Request]

4.3.8 Counterfeit Prevention: The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory. [CDRL A005-E005, DI- MISC- 81832, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition]

4.4 Turn-Around Time (TAT): The contractor shall establish a depot repair capability that will assure a serviceable item that shall pass an Acceptance Test Procedures established by the Original Equipment Manufacturer (OEM). Contractor shall expedite delivery of repaired units to meet fastest turnaround times possible. The turn-around-time required is IAW the official negotiated Contract Delivery Schedule after Receipt of Order (ARO) or repairable, whichever is later. TAT for Joint Chief of Staff (JCS) backorders and Mission Incapable Aircraft Parts (MICAP) requirements will take precedence over the routine schedule and shall be delivered within 90 working days. In the event that a repairable item is required by the Government on an emergency basis to fill MICAP/Surge backorders, the Government IM, PMS or Program Manager will notify the Contractor in writing (E-mail preferred) as soon as the need is identified.

The Contractor shall respond to the Government IPT within one business day of the request with the estimated delivery date the critical item. For all other request from the Government, The Contractor shall initially respond to a Government request for assistance within eight business hours. Follow-up assistance, if required, shall be provided by a suspense date acceptable to the Government. Repaired and unrepaired assets shall be shipped by the fastest traceable means.

Delivery of shipped assets shall be made within five working days. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by a revised delivery date acceptable to Government. Performance is satisfactory when the contractor delivers fully repaired and operational units with no more than one late delivery per quarter.

4.5 Transportation and Shipping

4.5.1 Tagging and Shipping Requirements: The Contractor shall insure that the appropriate tag is attached to each serviceable end-item generated. The Contractor shall place one tag inside the package along with the item and shall attach a second tag to the outside of the package.

4.5.1.1 Serviceable tag is DD Form 1574/1574-1 (Yellow).

4.5.1.2 Unserviceable (repairable) tag is DD Form 1577-2/1577-3 (Green).

4.5.1.3 Unserviceable (condemned) tag is DD Form 1577/1577-1 (Red).

4.5.2 Transportation: Transportation requirements shall be IAW DD Form 1653. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.

4.5.3 Misdirected shipments of reparable items (GFM) shall be immediately reported by telephone to the PCO and Logistics Manager followed by written notification via email within three business days. The PCO will issue appropriate disposition instructions for the misdirected items. Misdirected items received by the Contractor which are not part of this contract will not be receipted into CAV-AF.

4.6 Condemnation, Beyond Economical Repair (BER), Beyond Physical Repair (BPR)

4.6.1 Requests for condemnations shall be submitted in writing to the Government PCO within five business days of the intent to condemn. Condemnation authority shall be requested when the cost to repair the asset exceeds 75 percent of the unit’s replacement cost. The Contractor shall not charge the full repair cost, but only the firm fixed price associated with the negotiated BER CLIN. The PCO retains the right to request enlarged color photographs (electronic media preferred) of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number designation. The results of any electrical testing performed and the end item shall also be submitted for review. The Contractor may be required to submit the proposed condemned end item to the Government technical representative for evaluation, confirmation, and/or disposition instructions.

4.6.2 Authorization to accomplish condemnation shall be obtained through the PCO from the Program Manager (PM) for end item(s) determined to be uneconomical to return to a serviceable condition. (FAR Part 45.6, DFAR Part 245.6, DOD 4160.21-M-1, DOD 4100.39-M). The Contractor shall obtain written disposition information from the PCO for assets Beyond Economic Repair (BER) and/or assets Beyond Physical Repair (BPR). Contractor format is acceptable.

4.6.3 The Contractor shall be required to repair all items unless the PCO provides direction in writing that a particular item is excluded from these requirements. Request for condemnation shall be submitted to the PCO and 407th Program Manager for approval/disapproval if the unit falls into one of the criteria specified below:

4.6.3.1 Physical damage destroys 75% of the physical and/or electrical integrity of the unit (i.e. crushed).

4.6.3.2 Overheating and subsequent destructions of 80% of the internal electrical components and electrical connections.

4.6.3.3 Damage due to fire, explosion, flood, aircraft crash or enemy combat action.

4.6.4 Repairable items condemned under the provisions of the contract may be replaced by reparable assets provided by the Government from within existing inventory when available at no additional cost to the Government. Government program offices may determine to have condemned inventory kept at the Contractor’s facility upon mutual agreement.

4.6.5 Upon receipt of authorization from the government to scrap an item, the Contractor shall complete all actions/directions (including authorized cannibalization) and submit a scrap certificate and DD250, if required, within 30 calendar days.

4.7 Over and Above

4.7.1 Contractor requests for Over and Above shall be submitted to the 407th Program Manager and the PCO. Over and Above request may be utilized for the following areas: surge operations, any required proposals, missing components, and estimates in support of the Over and Above efforts as requested or directed by the PCO.

4.7.2 If, after an item is inducted, an evaluation reveals that the item has significant problems (e.g. burned boards, lifted tracks, missing components, cannibalization, obsolescence etc.) then the Contractor shall advise the Government on a case-by-case basis and recommend the item be placed in an over and above status. Initial notification regarding the significant problem shall be provided within five business days. Contractor may be requested to prepare a priced proposal, including turn-around time, for the Government within 30 calendar days. No further action will be taken until the 407th Program Manager approves the Over and Above request and the PCO provides direction and funding for induction into over and above work.

4.7.3 Any Over and Above repair generated from TT&E will be funded under the Over and Above CLIN.

4.8 Quality Acceptance and Processing

4.8.1 The Contractor shall establish, document and maintain a quality system that adheres to the requirements of International Standard Organization (ISO) 9001.2000/ANSI/ASQC Q92, Quality Systems Model for Quality Assurance in Design/Development, Production, Installation and Servicing and supplement requirements imposed by this contract, as a means of ensuring the end item conforms to specified requirements. The Contractor shall develop and implement procedures to properly maintain measuring and test equipment IAWNCSL-Z-540-1. The quality system shall include a clear and complete set of work documents for all maintenance required by this contract. The quality program shall be designed to promptly detect and correct conditions adverse to quality.

4.8.2 Final Acceptance Testing: The Contractor shall perform a final acceptance test procedure (ATP) to verify repair actions and return to serviceable or like new condition. Each asset must fully pass the ATP requirements before being considered acceptable for return to the Government. Final testing, inspection, quality review, and Government/Customer Source Inspection will be performed prior to returning the item to the directed location.

4.8.3 Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the repair site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package.

4.9 Product Quality Deficiency Reporting

4.9.1 The Contractor shall investigate all Quality Deficiency Reports (QDRs) submitted against reportedly defective items repaired by the Contractor. The Contractor shall ensure each QDR is processed in accordance with (IAW) T.O. 00-35D-54; USAF QDRs and Investigating System, in a timely manner to meet the suspense dates assigned by the action point agency.

4.9.2 When the Contractor receives a QDR, the Contractor shall ensure QDRs include: Analysis of data to determine extent and cause of deficiencies; analysis of trends in processes or performance of work to prevent recurrence; and introduction of required improvement, corrections, and monitoring of the effectiveness of corrective action taken. When defective trends begin to develop or when the specific cause(s) of defects that render a product unserviceable cannot be identified and corrected without an evaluation of an exhibit, such exhibit(s) shall be requested by the Contractor for purposes of investigation. The Contractor as a part of the item’s normal repair process shall conduct these investigations. There shall be no more than one validated QDR per contract year.

4.9.3 Items repaired/reworked as a result of the QDR, Quality Deficiency, as defined in this section, 4.9, shall be shipped at the Contractor’s expense.

5.0 General Information

5.1 Continuation of Mission-Essential Services during a Crisis: The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

5.2.1 Actual knowledge and/or generation of classified information and/or Controlled Unclassified Information (CUI) are not expected to be necessary for performance of the contract/order. Contractor personnel are required to comply with security requirements to preclude potential security incidents or violations. If a change in the security classification of the contract/order becomes necessary after contract/order award, the Contractor shall make a reasonable effort to continue performance of tasks under the contract/order in compliance with the change in security classification in accordance with Security Requirements.

5.2.2 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with all applicable security regulations.

5.2.3 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E and DoD Manual 5205.02-M to protect United States (U.S.)

Government interests. The Contractor shall ensure Contractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.

5.2.4 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with DoD 5220.22- M. Applicable equipment shall be safeguarded, maintained and operated in accordance with DoD 5220.22-M.

5.2.5 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.

Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.6 Security Incident or Violation: The Contractor shall immediately notify the 638 SCMG Security Office of any potential or actual security incident or violation.

5.3 Environmental Management System (EMS): These services will not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs: In accordance with FAR 23.404, Agency Affirmative Procurement Programs, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [http://www.epa.gov/cpg/products.htm] and/or United States Department of Agriculture (USDA)-designated products included in the bio-based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio-based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

5.5 Safety Requirements

5.5.1 Contractor Compliance: The Contractor shall comply with Government Safety and Health regulations including, Public Law 91-596 as amended by Public Law 101-552 [Occupational Safety and Health Act of 1970 (OSHA)] and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH). OSHA and ESOH requirements shall be incorporated into the Contractor’s safety program. While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health.

5.5.2 Safety and Health Plan: The Contractor shall submit a Safety and Health Plan to the MFT or as indicated by CDRL instructions. The Contractor shall establish and maintain a safety program in accordance with the contract/order, applicable Government regulations and the Safety and Health Plan. [CDRL A008-E008, DI-ENVR-81375/T, Safety and Health Plan]

5.6 Contractor Manpower Reporting: The Contractor shall not have to provide an annual count of contractor/subcontractor personnel performing work for each fiscal year due to this contract’s expected value being under $3,000,000.

http://www.epa.gov/cpg/products.htm http://www.biopreferred.gov/

5.7 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.8 Reserved.

5.9 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via PIEE/WAWF.

5.9.1 CDRL deliverables may be submitted using PIEE/WAWF and/or be submitted directly to the applicable MFT member IAW the CDRL. The CDRL will determine submittal requirements;

however, separately priced data must be accepted in PIEE/WAWF in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in WAWF in order for the contract line item to be closed out.

5.10 Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. Prior to contract/order award, the Contractor shall submit a QMS for acceptance by the Government MFT including a Quality Control Plan (QCP) addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The QCP shall include the schedule of quality assurance/control inspections planned by the Contractor. Contractor shall submit and comply with their QMS. [CDRL A004-E004, DI- QCIC-81722, Quality Program Plan]

5.11 Trafficking in Persons: The Contractor shall comply with the requirements of FAR 52.222- 50, Combating Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

5.12 Request for Assistance: The Contractor shall initially respond to a request for assistance, or inquiry request, within 72 hours. Follow-up assistance, if required, shall be provided by the suspense date acceptable to the Government.

http://www.state.gov/j/tip

6.0 Appendices

6.1 Appendix A, Reference(s)

Publication Title of Publication Date of Publication Sections(s) that Apply T.O. 00- 35D-54

USAF Deficiency Reporting, Investigation, and Resolution

1 September 2015 00-35D-54 Entire

DoD 5220.22-M

National Industrial Security Program Operating Manual

(NISPOM).

February 28, 2006 Change 1 - March 28, 2013

Entire

DoDD 4715.1E

Environment, Safety, and Occupational Health

(ESOH)

March 19, 2005 Entire

DoDD) 5205.02E

DoD Operations Security (OPSEC) Program

June 20, 2012 Entire

DoD Manual 5205.02-M

DoD Operations Security (OPSEC) Program Manual

November 3, 2008 Entire

Public Law 91-596 as amended by Public Law 101-552

Occupational Safety and Health Act of 1970

December 29, 1970 as amended through January 1, 2004

Entire

GIDEP

Operation Manual

SO300-BT-

PRO-010

Government-Industry Data Exchange Program (GIDEP) Operations Manual

15 Sep 2010 SO300-BT-PRO-010 Chapter 2, Participation Requirements

FAR and supplements

Federal Acquisition Regulation

Federal Acquisition Regulation Sections applicable to contract and

PWS

None Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability and Control of Government Property, Version 2.5

15 Sep 2012 UID Accountability Entire

MIL-STD-

130N

Department of Defense Standard Practice Identification Marking of U.S. Military Property

17 Dec 2007, Chg. 1 16 Nov 2012, MIL-STD- 130N

Entire

MIL-STD-

2073-1E

DoD Standard Practice for Military Packaging

23 May 2008, Chg. 1 Jan 2011, MIL-STD-2073- 1E

Entire http://everyspec.com/DoD/DOD-General/SO300-BT-PRO-010_15SEP2010_35173/ http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/UID/attachments/DoDUIDGuideVer2_5.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf http://www.acq.osd.mil/dpap/pdi/uid/docs/MIL-Std130N_Ch1.pdf http://everyspec.com/MIL-STD/MIL-STD-2000-2999/MIL-STD-2073_1E_CHG-1_30200/ http://everyspec.com/MIL-STD/MIL-STD-2000-2999/MIL-STD-2073_1E_CHG-1_30200/

MIL-

HDBK-

263B

Military Handbook:

Electrostatic Discharge (ESD) Control Handbook for Protection of Electrical And Electronic Parts, Assemblies, and Equipment (Excluding Electrically Initiated Explosive Devices)

31 July 1994 Entire

MIL-STD-

129P

Department of Defense / Standard Practice / Military Marking for Shipment and Storage

15 December 2002 Change 1 - 15 January 2004, Change 2 - 10 February 2004, Change 3 - 29 October 2004, Change 4 - 19 September 2007 http://www.acq.osd.mil/log/sci/ait/MIL-STD- 129PCH4.pdf

Entire

MIL-STD-

1686C

Department of Defense Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)

25 Oct 1995 Entire

9.2 Appendix B, NSN List

NSN Part Number Noun

5960-01-318-0987 VMX-1849 ELECTRON

TUBE

http://www.acq.osd.mil/log/sci/ait/MIL-STD-129PCH4.pdf http://www.acq.osd.mil/log/sci/ait/MIL-STD-129PCH4.pdf

AN/APQ-166 Strategic Radar System Electron Tube
1.0 Description of Services
2.0 Services Summary
4.0 Technical Requirements
5.0 General Information
6.0 Appendices

File details come from the government source that posted it. Updated .