PWS_F-15_Support_Equipment_Steel_2023 (24 Aug).pdf

PDF 131 KB Posted

Attached to
Steel components for the fabrication of F-15 Support Trailers and Support Racks
Solicitation number
FA8684-23-Q-B004
Issued by

About this file

This Performance Work Statement outlines requirements for steel components to support the fabrication of F-15 support equipment. The contractor shall source, cut, and machine steel parts for 8 support trailer assemblies and 8 support rack assemblies according to technical drawings. Components for 16 total assemblies must be delivered FOB destination to Wright Patterson AFB by December 2023. The Department of the Air Force Materiel Command Lifecycle Management Center seeks these services to free up time in their fabrication shop for prototype work while accomplishing their mission support for the F-15. Solicitation FA8684-23-Q-B004 corresponds to this requirement for steel components.

View the file

Other files

File Type Posted
F-15 Support Rack Steel Drawings.pdf PDF
F-15 Support Trailer Steel Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

AFLCMC/EZPAA - Air Force Packaging and Engineering Facility (AFPTEF)

6 July 2023

1.0 Description of Service: This Performance Work Statement (PWS) provides details for cut and machined steel to support the fabrication of 8 Support Trailer Assemblies and 8 Support Rack Assemblies used as support equipment for the F-15.

One trailer assembly consists of 22 different parts that are described in “F-15 Support Trailer Steel Drawings.pdf”. The quantity needed of each part can be found on the cover sheet of the drawing document.

One rack assembly consists of 20 different parts that are described in "F-15 Support Rack Steel Drawings.pdf”. The quantity needed of each part can be found on the cover sheet of the drawing document.

All material to be delivered to FOB Destination No Later Than 8-10 Weeks after contract award.

2.0 Background: AFLCMC/EZPAA sees an opportunity to outsource fabrication of the steel material for the F-15 support equipment fabrication project. AFLCMC/EZPAA will be able to accomplish their mission by freeing up time in their own fabrication shop for work with prototype designs.

3.0 Scope: The scope of this effort includes sourcing, cutting, and machining material for 16 total F- 15 support equipment assemblies. There will be 8 Support Trailer assemblies and 8 Support Rack assemblies. All technical requirements for the parts are detailed in:

“F-15 Support Trailer Steel Drawings.pdf” “F-15 Support Rack Steel Drawings.pdf”

4.0 Period of Performance:

The period of performance for this contract will cover 1 September 2023 thru 31 December 2023.

5.0 Hours of Operation/Principle Place of Performance: Work in support of this PWS shall be FOB Destination (Wright Patterson AFB, OH).