This document is a Performance Work Statement (PWS) for the Preservation and Restoration of an F-15A Static Display Aircraft. The contractor shall provide all necessary personnel, equipment, tools, materials, supervision, and quality control to prepare the aircraft surfaces, remove corrosion, prevent pest infestations, refinish the aircraft, and clean the concrete pad. The work must be completed by 31 May 2025 and will be performed at Barnes ANGB in Westfield, Massachusetts. The contractor must follow specific requirements for surface preparation, paint quality, aircraft markings, and site cleanliness, as detailed in the PWS. This PWS is associated with a federal contract opportunity from the Massachusetts National Guard to restore the F-15 static aircraft, as described in the combined synopsis and solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
PERFORMANCE WORK STATEMENT (PWS)
FOR
Preservation and Restoration of F-15A Static Display Aircraft Service
7 August 2024
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, surface preparation, corrosion treatment, pest prevention, and full refinishing of F-15A static display aircraft; and cleaning / power washing of concrete pad as defined in this PWS.
1.2 Background: Static display aircraft require periodic maintenance, corrosion control, and refinishing.
1.3 Period of Performance (PoP): Work is to be completed no later than 31 May 2025.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0630 - 1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Barnes ANGB, 815 Southampton Road, Westfield, Massachusetts along Tank Destroyer Boulevard. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force is essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day
1.4.2.6 Independence Day
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
5. Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1 Reserved.
1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)
1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.4 Reserved.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Reserved.
1.4.5.7 Reserved.
1.4.5.8 Reserved.
1.4.5.9 Reserved.
1.4.5.10 Reserved.
1.4.5.11 Reserved.
1.4.5.12 Reserved.
1.4.5.13 Reserved.
http://jko.jten.mil/
1.4.5.14 Reserved.
1.4.6 Reserved.
1.4.7 Reserved.
1.4.8 Reserved.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on email) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed. The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.12 Reserved.
1.4.13 Reserved.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Reserved.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: None.
3.2 Materials: Aircraft marking decals.
3.3 Equipment: None.
3.4 Services:
3.4.1. Bioenvironmental Engineering: The government will provide bioenvironmental engineering services. These services will be limited to consultation services in regard to personnel protective requirements IAW AF, state, and local guidelines.
3.4.2 Minor aircraft repairs if required.
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: N/A
4.3 Reserved.
5.0 Requirements: The contractor shall:
5.1 F-15A Maintenance: The performance of the contract will be in five stages:
1. Surface preparation and corrosion treatment
2. Pest prevention
3. Refinishing
4. Markings application
5. Concrete slab cleaning
100% of visible surfaces will be included in the scope of work (see Attachment 1).
5.1.1 The contractor is responsible for any required equipment to be able to safely work on and complete the required services. The contractor shall protect all landscaping and lawn adjacent to aircraft from damage and paint overspray. All damage by the contractor to the landscaping shall be repaired or replaced by the contractor at no additional cost to the government within 10 days after identification / notification. The contractor shall prevent ruts in the turf caused by equipment, lifts, and staging. The contractor shall protect surrounding sprinkler system from damage by staging and lifts.
104FW Civil Engineering Office will identify locations of all sprinkler system components.
5.1.2 Aircraft Surface Preparation: Aircraft shall be inspected for sheet metal and structural damage, corrosion and composite repairs. All surfaces shall be mechanically or scuff sanded sufficiently to remove surface corrosion and produce an adequate surface for primer / paint adhesion. Existing markings shall be removed completely.
Complete depaint of aircraft is not required. Any required repairs shall produce a smooth, flush appearance similar to the original surface. The contractor shall ensure all fuselage, wing, and empennage drain holes are kept clear of obstructions. Excessive gaps in outer mold lines (skins and panels) should be sealed to prevent water intrusion.
Any maintenance shall be performed by Barnes ANGB Aircraft Structural Maintenance personnel, coordination shall be completed through the Contracting Officer’s Representative.
5.1.3 Pest Prevention: Pest removal and prevention shall be a priority focus to mitigate damage and corrosion issues affecting this display. All openings in the aircraft surface that would attract bird or insect infestation shall have permanent fine mesh screening or equivalent measures installed. These areas shall include all vents, wheel wells, external stores, pylons, intakes, and any other areas that exhibit evidence of infestation.
Removal of bird and insect nests, as well as droppings and other pest residue shall be accomplished wherever possible. Bird deterrent measures shall be installed on antenna on top of fuselage (see Attachment 1). Material used for screening shall be kept to the minimum amount necessary, and shall be sufficiently subtle in appearance so as not to detract from the overall authentic appearance of aircraft.
5.1.4 Aircraft Refinishing: Contractor shall apply specified paint scheme to simulate an F-15C aircraft shown in Attachment 1, and in accordance with historical photographs and technical data to be provided by Barnes ANGB. Finished painted areas will include:
entire fuselage, wing, and empennage areas, as well as canopy and windscreen.
Painting shall be performed so that there are no runs, drips, sags, thin coverage spots, excessive “orange peel” (as viewed from a normal viewing distance), or bubbled paint.
All existing decals shall be removed prior to painting. If any marking is obliterated, unreadable, or color scheme is undetermined, the contractor shall contact either the Contracting Officer or Contracting Officer’s Representative to determine correct marking or color.
5.1.4.1 Prior to work commencing, the contractor shall submit the proposed paints, type, manufacture, amounts, and the Safety Data Sheet for each paint.
5.1.4.1.1 Paint shall have high UV protection and an expected lifespan of at least five years.
5.1.4.1.2 Contractor shall ensure compliance with all air permit, environmental and hazardous materials/hazardous waste requirements. Spraying operation shall be accomplished with approved low emissions equipment.
5.1.4.1.3 The contractor shall perform paint preparation functions as necessary to ensure proper adherence of new paint, i.e. scraping, sanding, surface washing, and priming.
5.1.4.1.4 During the painting process, any parking lots downwind of operation and with possibility of paint overspray should have signs declaring the following: “Open air painting in progress. Park at own risk”.
5.1.4.2 Refinishing shall not be performed on aircraft components that have not been inspected for sheet metal and structural damage, corrosion and composite repairs in conjunction with the Contracting Officer’s Representative or Contracting Officer.
5.1.5. Markings/Decals: Barnes personnel will manufacture final aircraft and unit markings to be supplied to contractor for application. Aircraft markings shall be correct color, size, font, and location according to specifications outlined in Attachment 1.
5.1.6 Worksite cleanup: Work site shall be cleaned of all trash, paint residues (paint chips, overspray), and consumables to include all excess masking and repair materials.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 (Change 1:
07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf
DoDM 5200.2 Procedures for the DoD Personnel Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 09/09/14 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD Investigative and Adjudicative Guidance for Issuing the Common
Access Card (CAC)
(Change 1:
05/04/2018)
Homeland Security Presidential Directive (HSPD)-12
Policy for a Common Identification Standard for Federal Employees and
Contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense Privacy and
Civil Liberties Programs
01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management 10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program
Operating Manual (NISPOM)
02/28/2006 (Change 2:
05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
AFI 10-245
Antiterrorism
03/28/2013 (Certified current
03/30/2017) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFI 31-101
Security Forces Standards and
Procedures
08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and Procedures
03/05/2013 Change 1:
12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFPD 17-1
Information Dominance Governance and Management
04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
AFMAN 17-1301
Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-
Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131
AFI 10-701
Operations Security
7/24/2019 (Change 1:
06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series
=-1&modID=449&tabID=131
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance Objective Performance Standard Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
1.3 Timeframe for
completion of preservation, refinishing and pest prevention for F-15A static display aircraft.
To be completed no later than 31 May 2025 (unless delayed by weather).
5% failure to perform specified work within the schedule
Inspection by COR
5.1.2 Surface Preparation Visible surfaces shall produce
a smooth, flush original appearance. Re-performance shall be accomplished within three days of notification.
5% failure to prepare suitable surfaces that will prevent coating failure and provide smooth finish
Periodic Inspection by COR
5.1.2 Corrosion removal
and preservation
Corrosion affected surfaces shall have corrosion mechanically removed. Panel edges and seams shall be sealed to prevent water intrusion.
5% failure to remove corrosion and seal panel edges and seams.
Periodic Inspection by COR
5.1.3 Pest Prevention Openings shall be covered
with covered with fine mesh screening or equivalent measures to prevent pest infestation to include removal of bird droppings and pest residue.
5% failure to cover all openings 5% failure to remove droppings and pest residue 5% failure to remove and replace ineffective/unsightly measures
Periodic Inspection by COR
5.1.4 Paint Quality Paint refinishing shall present
a technically correct color and appearance w/o defects. No overspray on non-painted parts of the display or landscape. All paints must be rated for a minimum 5 year lifespan with high UV rating.
5% deviation from correct color and appearance.
No more than 6 sq.
in. per 10 sq. ft. shall have paint defects.
5% deviation from 5 year paint rating.
Periodic Inspection by COR
5.1.5 Aircraft markings Aircraft markings shall be
correct color, size, font, and location according to specifications outlined in Attachment 1.
5% deviation in color, size, font, and location according to specifications outlined in Attachment 1.
Inspection by COR
5.1.7 Site cleanliness Work site shall be cleaned of
all trash, paint residues (paint chips, overspray), and consumables to include all masking and repair materials.
5% failure to clean worksite of trash, paint residues, and consumables
Inspection by COR
Attachment 1
Barnes ANGB F-15A Eagle Refinishing &
Marking Details
Paint colors required:
• Fed-Std-595 color 36176 (dark gray)
• Fed-Std-595 color 36251 (medium gray)
• Fed-Std-595 color 37038 (camo black)
• Fed-Std-595 color 17875 (gloss white)
• Canopy / windscreen - PPG Shop-Line - Direct Gloss Acrylic Urethane (Color - Light Champagne)
Attachment 1
Left rudder to be installed before refinishing
LEGEND
� GRA'i NO 3G2S1 [I)
1.4.5.1 Reserved.