PWS_Eng Spt Services_NSTA.pdf

PDF 395 KB Posted

Attached to
Engineer Support Services-NSTA Federal contract opportunity
Solicitation number
W912PB22Q5002
Issued by
Department of the Army Materiel Command Army Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Engineer Support Services-NSTA, newest first.
File Type Posted
W912PB22Q5002 0001.pdf PDF
PWS_Eng Spt Services_NSTA_updated 29OCT21.pdf PDF
draft_W912PB22Q5002.pdf PDF
QASP_Eng Spt Services_NSTA.pdf PDF
Attachment 1_FHP Guidance DoD Guidance for COVID-19 Vaccination Verification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

409th CSB Ver 5 20180730

PERFORMANCE WORK STATEMENT (PWS)

Bulgarian Local National Engineering Support Services for the Army Support Activity Black Sea Directorate of Public Works

Novo Selo Training Area ASA-BS NSTA, Bulgaria

October 2021

Part 1 General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal services contract to provide Bulgarian Host Nation Engineering Support Services to the Army Support Activity Black Sea (ASA-BS) Directorate of Public Works (DPW) office at Army Support Activity- Black Sea (ASA-BS) Novo Selo Training Area Airbase, Bulgaria.

1.2 Background: In order for United States Army to comply with U.S. Construction and Host Nation Construction Standards, local Office Support Services are required to assist the U.S. Government in following local construction standards and practices. The Contractor must provide quality technical support services to perform tasks in the host nation to complete the tasks identified in this Performance Work Statement (PWS). The Contractor will provide qualified services to the ASA- BS Directorate of Public Works (DPW) office in order to assist the DPW with duties at the Novo Selo Training Area Airbase, Bulgaria.

1.3 Scope: The Contractor shall provide non-personal services. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents, and assume responsibility for planning, programming, administering, managing, and executing all functions necessary in order to complete the tasks specified in this PWS. The Contractor shall conduct work in accordance with this PWS and all applicable United States (U.S.), Bulgarian, and local laws, regulations, standards, provisions, and directives to include applicable publications in Part 6. The Contractor shall ensure that all work meets the level of service, performance standards, or tolerances specified in the PWS or in applicable referenced documents.

1.4 Objectives: The objective of this contract is to perform designated tasks for the ASA-BS NSTA Bulgaria DPW, with qualified staff, to assist the DPW in dealing with daily maintenance activities, project development, local Bulgarian Military and Bulgarian MoD correspondence, and the tasked maintenance of records and drawings so they are up to date for use by the DPW staff.

1.5 General Information

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award (Deliverable # 1).The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have three (3) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than thirty (30) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

a. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals)?

b. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses?

c. How will the Contractor monitor and ensure staff qualifications remain current and valid including DOCPER processes/approvals throughout contract performance?

d. How will the Contractor ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control)?

e. How will the Contractor inventory and track maintenance of all Government Provided Equipment / Materials?

f. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future?

g. How will the Contractor file and save all Quality Control related documents for the life of the contract plus five

(5) years?

1.5.1.1 Reserved.

1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within two (2) work hours of identifying those issues. Verbal reports shall be followed up by written reports within two (2) days.

(Deliverable # 2)

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

Date U.S. Holidays

1st of January New Year’s Day

3rd Monday in January Martin Luther King’s Birthday

3rd Monday in February President’s Day

Last Monday in May Memorial Day

4th of July Independence Day

1st Monday in September Labor Day

2nd Monday in October Columbus Day

11th of November Veteran’s Day

4th Thursday in November Thanksgiving Day

25th of December Christmas Day

1.5.3.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

Date 2022 Bulgarian Public Holidays

1st of January New Year’s Day

3rd of March Liberation Day

22nd of April Orthodox Good Friday (Friday before Easter)

23rd of April Orthodox Holy Saturday (Date varies by year)

24th of April Orthodox Easter Day (Date varies by year)

25th of April Orthodox Easter Monday (Date varies by year)

1st of May International Workers’ Solidarity Day and Labour Day

2nd of May Labour Day Holiday

6th of May Saint George’s Day/Army Day

24th of May Bulgarian Education and Culture and Slavonic Literature Day

6th of September Unification Day

22nd of September Independence Day

24th of December Christmas Eve

25th of December Christmas Day

26th of December 2nd Day of Christmas

27th of December Christmas Holiday

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0800 to 1700, and Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0800 to 1700, Monday through Friday. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.6.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0800 to 1700, Monday through Friday. The facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.) and, how the Contractor intends to address and meet increased operations tempo (e.g. Contractor’s need for overtime or extended work hours). If the need for overtime is anticipated, the Contractor must receive approval from the Contracting Officer at a minimum seven (7) calendar days prior to execution. The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within fifteen (15) work days after date of contract award (Deliverable # 3). The Government will review and either accept or return their comments to the Contractor within ten (10) days. The Contractor shall then have three (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.

1.5.5 Training Holidays: USAREUR has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.6 Place of Performance: The main work to be performed under this contract will be performed at Novo Selo Training Area in Novo Selo ASA-BS NSTA Bulgaria and conferences located in either of the following locations; Bucharest Romania, Sofia Bulgaria, or MK Romania.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: Contractor personnel performing work under this contract must have a local security background check and unclassified security clearance at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are IAW with the Department Of Defense Contract Security Classification Specification (DD Form 254), which is currently accessible at the following link:

http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf.

1.6.2 Personnel Security Clearance Requirements: Contractor personnel performing work under this contract must have an active personnel security clearance at the UNCLASSIFIED level in the Joint Personnel Adjudication System (JPAS) at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are IAW the Department of Defense Contract Security Classification Specification DD Form 254. The Contractor shall ensure that Contractor employees and subcontractor employees performing services under this contract comply with Federal Acquisition Regulation (FAR) 52.204-2 Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor shall ensure the employee complies with the Department of Defense Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M), and any revisions to DoD 5220.22-M, notice of which has been furnished to the Contractor.

1.6.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Bulgarian contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access requirements.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation provost marshal office, director of emergency services, or security office. Contractor workforce must comply with all personal identification verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

AE Reg 190-16 can be found on the following website:

https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf.

1.6.3.1 In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award (Deliverable # 4). The log must at a minimum contain the following information;

Name, Date of Birth, CMP number, location of birth, company working for, and the length of the awarded contract the contractor is applying for base access to work on. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.

1.6.3.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) calendar days.

1.6.3.3 Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within three (3) calendar days (Deliverable # 5).

1.6.3.4 Common Access Cards (CAC): The Contractor shall provide the following information: Last, First Middle Name, Cadency Name, Personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) to the COR with fifteen (15) calendar days after award (Deliverable # 6). The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements under 1.22.5.

Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DOD facility and access, via logon, to DOD networks on-site or remotely; (2) Remote access, via logon, to a DOD network using DODapproved remote access procedures; or (3) Physical access to multiple DOD facilities or multiple non-DOD federally controlled facilities on behalf of the DOD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

1.6.3.4.1 The Contractor shall provide a CAC log within the first 30 calendar days after contract award and within five (5) days after changes have been made. The COR will provide format and content for the log during the post award meeting.

Note - CACs are Government property and must be accounted for (Deliverable # 7).

1.6.4 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors.

1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to local and stateside background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the stateside background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within five (5) calendar days of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable # 8). The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within three (3) calendar days of receipt by the Contractor, (Deliverable # 9) identifying such with the appropriate contract number. When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager.

As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager a criminal record certificate, issued within the previous four months, no later than five (5) calendar days after contract award (Deliverable # 10). Forwarding correspondence from the Contractors shall identify the associated contract number. The Requiring Activity Manager will determine the favorability of the criminal record certificate and notify the Contractor. The Contractor shall forward a copy of unfavorable criminal record certificate to the Contracting Officer via the COR and the Requiring Activity Manager within three (3) calendar days of receipt, (Deliverable # 11) identifying such with the appropriate contract number. Local nationals and third country nationals agree to the same employee termination provisions as stated for U.S. Citizens (see paragraph

1.6.4.1 above, in particular, same requirements to replace the employee (and within timeframe noted) when results of background check are unfavorable).

1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).

1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor.

The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following personnel are considered key personnel by the Government: The Lead Program/Contract Manager, and designated Alternate Manager. The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than five (5) work days after contract award (Deliverable # 12). The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between the hours of 8 AM to 5 PM, Monday thru Friday, except recognized local Bulgarian holidays stated in paragraph 1.5.3.2 and available for contact 24/7 for emergency requirements. Qualifications for all key personnel are listed below:

a. Lead Contract Manager and Alternate Contract Manager: The CVs provided by the Lead Contract Manager and Alternate Contract Manager must demonstrate they are capable of proficiently speaking, reading, and writing in the English language. The proper registration and all required background checks required to obtain access to U.S. facilities within Bulgaria necessary to conduct business in compliance with Host Nation laws. Familiar with Microsoft Office (i.e.,Word, Excel, PowerPoint, Outlook). Must have a valid driver’s license to be able to use Government vehicles on a daily basis. Have no physical disabilities, able to lift 50 pounds unassisted, and can climb ladders to perform facility inspections. Successful completion of 24 semester hours in mathematical, engineering, and quantitative analysis courses, or equivalent; 10 or more years cost analysis experience, and have at least 5 years experience as a project programmer or construction manager.

b. Education and Experience: Personnel necessary for performing the majority of key tasks under this contract should have the following minimum qualifications:

(i) General Engineer Qualifications: Engineering degree (Civil, Mechanical, Structural, Architectural, Electrical) from an accredited university recognized by the US or European Union. A minimum of 3 years experience in facilities engineering, minimum of 2 years of experience working with multi-national agencies or companies, experience in AutoCAD or other international recognized computer aided drafting software, and experience in facility operation and maintenance.

(ii) Electrical Engineer Qualifications: Engineering degree, 4 years (Electical, Electronics, or Power Distribution Engineering) from an accredited university recognized by the US or European Union. A minimum of 3 years in facilities engineering related to electrical systems and components, high/ medium/low voltage systems, prim power backup systems, heating and air conditioning systems and industrial power generation systems. Minimum of 1 year experience working with multinational agencies or companies with knowledge of AutoCAD or other recognized computer aided drafting software.

(iii) GIS/Land Surveyor/AutoCAD Specialist Qualifications: A minimum of a 2 year CAD/GIS technician degree or equivalent from an accredited university recognized by the US or European Union. A minimum of 4 years experience in CAD design, drafting, and mapping of facilities designs. Advance knowledge of AutoCAD software with the ability to develop and complete construction and as-built drawings in accordance to engineering specifications. A minimum of 1 year experience working with multi-national agencies or companies.

(iv) Property Manager Qualifications: An 4 year Accounting degree (Accounting, Management, or Business) from an accredited university recognized by the US or European Union. A minimum of 4 years experience in database management and inventory management as related to movement of assets. A minimum of 1 year experience working with multi-national agencies or companies.

c. Special Qualifications: The Contractor shall ensure all key personnel performing the tasks as outlined under this PWS have the following requirements as part of their CVs. Familiarity with Bulgarian military structure and NSTA Airbase, and familiarity with the AutoCAD computer drafting software. The Contractor must ensure all employees possess and maintain current Information Assurance Technician (IAT) Level I professional certification during the execution of this contract.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employees to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance Ten (10) calendar days after contract award (Deliverable # 13). Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge with lanyard and badge holder. The badge must include the employee’s name, the contractor’s company name, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes (Deliverable # 14).

1.13 Contractor Travel: In the event the Contractors personnel are tasked to travel by the Government to perform a task, or attend a conference/meeting at either Bucharest Romania, ASA-BS MK ROMANIA, Babadag Romania, NSTA Bulgaria, or Sophia Bulgaria, the Contractor shall provide all necessary labor, materials, tools, and equipment required for travel. The government will provide expenses for transportation, lodging, and meals. Travel documents, such as passports and visas, shall be the responsibility of the Contractor. The Contractor shall plan for the requirement of no more than two (2) employees to attend a meeting in Bucharest Romania or Sophia Bulgaria for five (5) days twice a year.

1.14 Other Direct Costs (ODCs): Reserved

1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorize Government personnel or upon written approval of the Contracting Officer.

The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

The use of propaganda violates DoD Commercial Use of Imagery Guidelines stated at http://www.defenseimagery.mil/products/dodimagery/commercialuse.html The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.

1.17 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than five (5) calendar days prior to commencement of work under the contract (Deliverable # 15). Disclosure of information by Contractor personnel may result in Contractor personnel removal from performance under this contract.

1.18 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI (Deliverable # 16), and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Deliverable # 17). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.19 Phase In /Phase Out Period: To minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the thirty (30) day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

1.20 Safety: The following provides information pertaining to Safety and Accident Prevention: Contractor personnel shall comply with U.S. Army Europe, and all Installation Safety Rules and Regulations. When visiting construction sites the Contractors employees shall wear their Personal Protective Equipment (PPE).

1.20.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.

(a) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(i) Long sleeve shirt or coat.

(ii) Long trousers.

(iii) Steel-toed safety boots.

(iv) Reflective safety vest.

(v) Hard hat.

1.20.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the Bulgarian Safety and Health Protection Regulation for Construction Sites, the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

(a) Conditions of construction and operational activities to be considered include but are not limited to:

(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).

(b) In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.

(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

(i) Maintenance of tools and equipment.

(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.

(iii) Modifying performance periods for such work, taking into consideration the site conditions.

(iv) Organizing cooperation between different employers and Contractors without employees.

(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

1.20.1.2 The Contractor shall complete and provide safety notifications required by host nation authorities and will provide documented proof to the Contracting Officer via the COR, no later than three (3) calendar that such notifications were made (Deliverable # 18).

1.20.1.3 Reserved.

1.21 Environmental Compliance: The Contractor shall meet all U.S., Bulgarian and local environmental regulations on Environmental Compliance.

1.21.1 Environmental Compliance Plan and Program: Reserved.

1.22 Required Training: The following provides information on training requirements.

1.22.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within thirty (30) days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or thirty (30) days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR within three (3) days after completion of this training by all employees and subcontractor personnel (Deliverable # 19). AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months with Certificates of completion provided to the COR within three (3) days after completion of this training (Deliverable # 19), except AOR specific AT Level I training which shall be completed as required by local AT policies.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within three (3) days after completion of the training (Deliverable # 19).

1.22.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) days of employment under this contract. Verification of the training shall be provided to the COR within three (3) days after completion of the training (Deliverable # 20). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months.

Verification of the training shall be provided to the COR within three (3) days after completion of the training (Deliverable # 20).

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within three (3) days after completion of the training (Deliverable # 20).

1.22.3 iWATCH/iSALUTE Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH/iSALUTE program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within thirty (30) days after the contract is awarded and within thirty (30) days after new employees commence contract performance, with the results reported to the COR within thirty (30) calendar days after the contract is awarded and within seven (7) calendar days after new employees commence contract performance (Deliverable # 21). Verification of the training shall be provided to the COR within three (3) calendar days after completion of the training. Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.

1.22.4 Information Assurance (IA) Training:

1.22.4.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the Department of Defense (DoD) IA Cyber Awareness Training within seven (7) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or seven (7) calendar days after employment of new personnel. Verification of the training shall be provided to the COR within three (3) calendar days after completion of the training (Deliverable # 22).

1.22.4.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp.

1.22.4.3 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS), the web address is https://atc.us.army.mil/iastar/index.php. Verification of registration shall be provided to the COR within seven (7) calendar days after registration (Deliverable # 23). Contractor personnel must complete refresher training every twelve (12) months. Verification of the training shall be provided to the COR within three (3) calendar days after completion of the training (Deliverable # 24).

1.22.4.4 Threat Awareness and Reporting Program (TARP), Training:

1.22.4.4.1 All Contractor employees, with security clearances. Per AR 381-12 Threat Awareness And Reporting Program (TARP), shall receive annual TARP training by a CI agent or other trainer as specified in 2-4b within seven (7) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or seven (7) calendar days after employment of new personnel. Verification of the training shall be provided to the COR within three (3) calendar days after completion of the training.

1.22.5 Personally Identifiable Information (PII): Contractor employees, including subcontractors, performing services under this contract with access to PII and Government information shall complete “Identifying and Safeguarding PII” within thirty (30) calendar days of employment. Contractor personnel shall complete refresher training every twelve (12) months from initial completion.