QASP_Eng Spt Services_NSTA.pdf

PDF 247 KB Posted

Attached to
Engineer Support Services-NSTA Federal contract opportunity
Solicitation number
W912PB22Q5002
Issued by
Department of the Army Materiel Command Army Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Engineer Support Services-NSTA, newest first.
File Type Posted
W912PB22Q5002 0001.pdf PDF
PWS_Eng Spt Services_NSTA_updated 29OCT21.pdf PDF
draft_W912PB22Q5002.pdf PDF
Attachment 1_FHP Guidance DoD Guidance for COVID-19 Vaccination Verification.pdf PDF
PWS_Eng Spt Services_NSTA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP – Bulgarian Local National Engineer Support Services Page 1 of 12 Rev 2

Quality Assurance Surveillance Plan

(QASP)

For

Contract #

Dated 13 October 2021

Bulgaria Local National Engineer Support Services

ASA-BS-MK/DPW, Novo Selo Training Area, Bulgaria

NOTE: THIS QASP IS PROVIDED FOR INFORMATIONAL

PURPOSES ONLY. IT WILL NOT BECOME PART OF THIS

CONTRACT.

QASP – Bulgarian Local National Engineer Support Services Page 2 of 12 Rev 2

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

Bulgaria Local National Engineer Support Services

1. OVERVIEW:

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing the Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed performance requirement. The QASP provides a systematic method to evaluate the services the contractor is required to furnish. The QASP is based on the premise the government desires to maintain a quality standard in operating and maintaining Army Bulgarian Engineer Support Services. This is the best means of achieving that objective. The contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government in quality assurance is to ensure contract standards are achieved. In this contract the quality control program is the driver for product or service quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program accepted at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is accepted, careful application of the process and standards presented in the remainder of this document shall ensure a robust quality assurance program.

2. AUTHORITY:

Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.

3. CONTRACTING OFFICER:

The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO shall determine and document the final assessment of the contractor's performance in the governments past performance tracking system.

Assigned KO: MAJ Stephen Lawson Organization or Agency: 928th Contracting Battalion

4. CONTRACTING OFFICER’S REPRESENTATIVE / ALTERNATE CONTRACTING OFFICER

REPRESENTATIVE:

The Contracting Officer’s Representative (COR)/ Alternate Contracting Officer Representative (ACOR) is/are designated in writing by the KO to act as his or her authorized representative(s) to assist in administering a contract.

COR/ACOR limitations are contained in the written appointment letter. The COR/ACOR is/are responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance.

The COR/ACOR is/are not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR/ACOR will have the responsibility for completing Quality Assurance (QA) surveillance forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

5. SURVEILLANCE APPROACH:

QASP – Bulgarian Local National Engineer Support Services Page 3 of 12 Rev 2

This section details the method used in verifying contractor compliance with the contract requirements. The key elements of this process are PWS tasks risk rated as high or moderate tasks, the Performance Requirements Summary (PRS) which provides the standard, performance threshold and method of surveillance. The COR who will perform the surveillance and the PRS inspection checklist which shall be used to inspect the compliance of PWS tasks on a monthly basis. Contractor surveillance shall include the monthly completion and submittal of the approved PRS inspection checklist & KO summary report. Surveillance process audits shall, as a minimum, be conducted by the COR on a semiannual basis. Utilization of the 409th CSB surveillance process audit template is mandatory by all CORs who have been appointed by a 409th CSB KO. Although the Performance Requirements Summary (PRS) contains only those items considered most important for mission accomplishment, the government retains the right to inspect all requirements of the contract. The COR/ACOR personnel may choose to periodically inspect requirements not listed on the PRS. Non-conformance with any contract requirement, whether specifically addressed in the PRS or not, is unacceptable to the Government. The preferred course of action upon discovery of unacceptable service is to require the contractor to re-perform at no additional cost to the government. If the contractor’s re-performance does not meet the thresholds in the PRS or the quality stipulated in any other part of the contract, COR/ACOR personnel shall notify their Regional Contracting Office (RCO) Contracting Officer (KO), Contracting Specialist (CS) and Quality Assurance Specialist (QAS). The intent of the surveillance approach is to gain confidence in the contractor's way of doing business and then adjusting the level of oversight to a point that maintains that confidence. With this intent, the surveillance approach may not be one that stays the same throughout the duration of the contract. All Government evaluators should be prepared to periodically update the surveillance approach as required. The COR/ACOR contract folder must be developed and maintained to accomplish contract quality assurance for a performance requirement. The folder is typically contained within the Contracting Officer’s Representative Tracking (CORT) Tool web based application.

5.1 COR QUALITY ASSURANCE SURVEILLANCE SCHEDULE:

The COR shall complete the Quality Assurance Surveillance Schedule (QASS) on a monthly basis. The completed QASS form shall be uploaded into the VCE-COR application into the miscellaneous section tab in the CORs electronic contract folder The QASS ensures the KO that the COR has scheduled specific dates and times for contractor surveillance. Instruction are located on the tab marked QASS instructions located at the bottom of the excel workbook.

5.2 PRS INSPECTION CHECKLIST & KO SUMMARY REPORT:

The 409th contract management quality assurance team shall assist the COR with the development of their PRS Standard Inspection Checklist and KO Summary Report, providing training and instruction related to properly completing the required form. This checklist shall be derived from high and moderate risk assessed tasks and any items from the contract PWS the requiring activity deems necessary. The COR shall input the applicable contract information into rows 2 (two) through 12 (Twelve) as applicable, the COR shall perform inspections in accordance with the surveillance tasks listed on the PRS Standard Inspection Checklist and KO Summary Report. The COR shall input a 1 (one) in the corresponding pass fail column for each surveillance task on the checklist. Totals and compliant rates will automatically populate. For any fail indication, the COR shall provide comments related to the failed surveillance task. The COR shall provide a summary report. The COR summary report shall be a written narrative providing an overview of contractor performance for the reporting month. Space for the COR report is provided at the end of the PRS Standard Inspection Checklist and KO Summary Report. The PRS Standard Inspection Checklist and KO Summary Report shall be typed. Upon completion of the PRS Standard Inspection Checklist and KO Summary Report, the COR shall sign and date the report in the space provided. The COR shall upload the PRS Standard Inspection Checklist and KO Summary Report into the CORT web application in lieu of the generic CORT monthly report. The document will be named for the performance month (i.e. COR Surveillance Checklist OCT 2011). The PWS task pass fail data will be calculated as a compliant rate. IAW the PRS performance threshold the contractor is required to provide >95 Percent Compliant Rate for all PWS tasks on the PRS inspection checklist. The PRS Standard Inspection Checklist and KO Summary Report shall be uploaded into the CORT application in the corresponding virtual contract folder each month. The COR shall provide the contractor with a completed, signed copy of the PRS Standard Inspection Checklist and KO Summary Report and discuss any failures noted. The contractor shall rectify any and all failures noted before the next COR inspection cycle. The COR shall issue a level II Non-Conformance Report (NCR) for repeated PRS Standard Inspection Checklist and KO Summary Report failures.

QASP – Bulgarian Local National Engineer Support Services Page 4 of 12 Rev 2

5.3 CONTRACTOR SURVEILLANCE PROCESS AUDIT:

As a minimum the COR shall witness and document 1 (one) contractor surveillance process audit semi-annually.

The COR shall use the 409th CSB Surveillance Process Audit Template to document their process audits. The COR shall upload the contractor surveillance process audit form along with their PRS Standard Inspection Checklist and KO Summary Report in the CORT web application. The contractor surveillance process audit form shall be uploaded into the CORT web application semi-annually. The COR shall complete rows 2 (two) through 10 (ten) providing the required information. In row 12 (twelve) the COR shall provide a description of the process or procedure being audited and the proper technical reference i.e. Amy Regulation (AR), PWS paragraph etc. In row 13 (thirteen) the COR shall provide any process or procedure nonconformance, along with the proper technical reference. Row 14 (fourteen) is for related or relevant remarks. Row15 (fifteen) print name and date of audit. Row17 (seventeen) COR signature and date.

6. SURVEILANCE DOCUMENTATION:

Documenting surveillance is of major importance. The KO cannot properly administer the contract without documentation of actual surveillance. All documentation resulting from surveillance becomes a permanent part of the contract file. COR/ACOR personnel must provide all surveillance documentation each month for the month prior for inclusion in the official contract file. All surveillance documentation must be reviewed, signed and dated by the COR/ACOR prior to submission. On a monthly basis, the COR/ACOR personnel are required to provide a summary report and the PRS inspection checklist to the KO detailing the results of contract surveillance and any process audits. The 409th CSB approved checklists and process audit forms will be used to inspect required services.

7. UNACCEPTABLE PERFORMANCE:

If the number of defects/discrepancies exceeds the performance threshold for any item in the PRS, approved Government representatives will determine the possible cause of this unacceptable performance. Government-caused defects/discrepancies shall not be counted against the contractor. The same applies to any other requirement of the contract when Government-caused defects/discrepancies are the cause of unacceptable contractor performance. If the contractor’s performance is judged unacceptable on the PRS items or any other requirement of the contract by the appointed COR personnel, the COR/ACOR will inform the contractor’s on-site representative, and request his or her signature and date of surveillance on approved Non Conformance Report (NCR) form acknowledging notification. If the on-site contractor representative refuses to sign, COR/ACOR personnel shall annotate on the documentation the date and time of notification and name of representative and his/her refusal to acknowledge. If the contractor disputes the results of surveillance, COR/ACOR personnel must refer the contractor to the KO for resolution. The COR shall notify the KO for appropriate action in accordance with FAR 52.212.4, or the appropriate Inspection of services clause.

8. REVISIONS:

Revisions to this QASP are the joint responsibility of the requiring activity and the 409th CSB Quality Assurance Office. However the 409th CSB Quality Assurance Office must approve the revisions in writing, and the contractor shall be given a copy of the revised QASP and PRS Inspection Checklist and KO Summary Report before being used by COR personnel for contractor surveillance.

9. CUSTOMER COMPLAINTS:

This record is used to document customer complaints of unsatisfactory performance, the validity of the complaint, time and date the responsible official was notified, and the actions taken to correct the problem. Customer complaints shall be handled in the following manner: When a complaint is received, COR personnel will complete appropriate documentation to record the complaint on a DA Form 5477-R. The COR shall investigate the complaint to determine contract nonconformance. If after investigation the COR personnel determines the complaint as valid, COR personnel will inform the Contractor’s Quality Manager. The Contractor’s Quality Manager will be given 4 (Four) hours to correct the unacceptable performance. If the Contractor’s Quality Manager disagrees with the complaint after investigation and challenges the validity of the complaint, the Contractor’s Quality Manager shall

QASP – Bulgarian Local National Engineer Support Services Page 5 of 12 Rev 2 notify the COR personnel within 24 (twenty four) hours. If COR personnel determine the complaint as invalid, the COR shall document their findings and notify the customer. COR personnel will retain the annotated copy of the written complaint for their file. All customer complaints received, valid and invalid, will be documented.

10. GOVERNMENT NON-CONFORMANCE REPORT:

NCRs are used in evaluating the contractor’s corrective action and determining if an appropriate root cause has been assigned and effective timely corrective action has been taken by the contractor to prevent or reduce recurrence in the same or other similar services or products and to assure that adequate remedial action has been taken to remove existing faults. There are three types of NCRs which are used and issued by CORs to the contractors. NCRs must be submitted to the contractor after non-compliance has been identified.

NCR Level I – Minor effects on product/service, issued for nonconformity that can be corrected on the spot and where no further corrective action response is necessary. Level I NCRs shall be documented and issued to the contractor management level responsible for taking corrective actions.

NCR Level II – Major effects on product/service, issued when contractual nonconformity cannot be corrected on the spot. Level II NCRs should be directed to the contractor management level responsible for initiating corrective actions.

NCR Level III – Critical effect on product/service (Potential Health Hazard or Safety Hazard), Issued to the contractors’ top management to call attention to serious contractual nonconformity. Repeat nonconformities found within one year for the same single point failure, Safety of Flight (SOF) characteristics shall be issued as a level III NCR. A level III NCR may be coupled with contractual remedies such as reductions of progress payments, cost disallowances, or business management systems disapprovals, etc. A level I or II NCR need not be issued before a level III NCR is generated. All level III NCRs shall be coordinated with the KO.

11. DOCUMENTATION OF DEFICIENCIES:

The Government will use NCRs to document deficiencies when the contractor’s quality control system is found to be inadequate or the contractor’s non-compliance has led to substandard performance requiring corrective action.

NCR’s will reflect CRITICAL, MAJOR or MINOR non-conformances.

CORs will complete NCR’s and coordinate them with the appropriate KO, QAS and contractor representative.

Once the contractors Quality Manager or representative has issued a corrective action for the NCR it will be forwarded to the KO, COR and QAS for review, and determination of the need for further correction action. The COR shall notify the contractor representative of the determination within 5 (five) business days. NCR’s will be accumulated and analyzed by the KO, COR and QAS to determine when further corrective action is needed. Further corrective action requests will be documented and submitted to the KO for coordination with the contractor. The COR will discuss all minor deficiencies with cognizant contractor counterparts to resolve issues identified prior to requiring corrective action. All reports, complete with recommendations, will be forwarded to the KO, COR and QAS for review and action. The COR will transmit all NCRs directly to the contractor’s Quality Manager or representative for tracking coordination and investigation.

NOTE: The COR will review, approve and coordinate the NCR with the KO and QAS

The KO, COR and QAS shall review the NCR, coordinate any observations/comments and submit the NCR to the contractors Quality Manager QM or contractor’s representative for investigation and corrective action. The KO, COR and QAS shall review the contractors corrective action for approval or other appropriate action. During the course of monitoring the contractor’s activity, the COR may become aware of conditions that are not in accordance with the contract. The COR shall determine the level of corrective action required. (i.e.: verbal notification or written notification, documented on a NCR). If a verbal corrective action method is selected, the contractors Quality Manager or representative will be briefed by the COR and a written record made and filed in the COR files. When a verbal notification is selected, the contractor’s supervisor will be advised that he is required to coordinate the

QASP – Bulgarian Local National Engineer Support Services Page 6 of 12 Rev 2 problem with the contractor’s Quality Manager. If a written NCR is selected the contractors Quality Manager or Representative will be briefed by the COR. A written NCR will be coordinated with the KO and QAS. A written NCR will also be issued when a verbal NCR has been previously given and the contractor has failed to respond adequately. The COR, after review by the KO and QAS, will forward the NCR to the contractor’s Quality Manager or representative and will monitor the suspense status. Suspense of 10 (Ten) calendar days is required. The QAS shall receive a copy of all completed NCRs returned from the contractor and after review of proposed corrective actions will perform a follow-up inspection with the COR to close the NCR after the completed document has been returned. Disagreements between contractor personnel and government personnel on deficiencies and corrective action will be resolved by the KO. When a review of NCR or NCR history indicates a trend that appears to be systemic or management related, and the contractor has failed to correct, all objective evidence will be collected by the COR and submitted to the KO and QAS for review. Upon determination by the KO and QAS, corrective action will be escalated, in the form of a letter to the Contractor’s Project Director.

12. COMBATING TRAFFICKING IN PERSONS (CTIP)

If CTP is checked "Yes" on the COR Appointment Letter, the COR shall perform the following: Read and understand the CTIP FAR clause 52.222-50 in the basic contract or at http://farsite.hill.af.mil/ Describe how you will monitor the contractor's performance regarding trafficking in persons. For FAR 52.222-50 (February 2009), verify paragraph (c) and (f) of the clause are being complied with. For FAR 52.222-50 (March 2015), verify paragraph (c), (h), and (i) are being complied with. Document surveillance results on either the PWS Standard Inspection Checklist & KO Summary Report or on the Surveillance Process Audit Form. (Bring any potential issue in this area to the immediate attention of the KO before engaging the contractor in reference to these activities).

Document any validated non-compliance on the NCR IAW paragraphs 12, 13 and 14 of this QASP.

13. BACKGROUND:

In order for United States Army to comply with US Construction and Host Nation Construction Standards, local Engineers are required to assist USG in following local construction standards and practices. Local Engineers must be able to educationally qualified and have relevant work experience in the host nation. Contract will be to provide five (5) qualified support personnel (one (1) Lead General Engineer, one (1) General Engineer, one (1) Environmental Engineer, one (1) Land Surveyor/GIS/AutoCAD Specialist, and one (1) Property Manager) to support the Army Support Activity Black Sea’s (ASA-BS) Directorate of Public Works (DPW) with duty in the Novo Selo Training Area, Bulgaria.

QASP – Bulgarian Local National Engineer Support Services Page 7 of 12 Rev 2

CONTRACTOR PRS INSPECTION CHECKLIST & KO SUMMARY REPORT

Method of Surveillance

100% Inspection

Contractor Name:

Contract Number:

Configuration Number: Revision Date:

Contracting Officer Name:

COR Name:

Supervisor Name:

Meeting Contract

Requirements

Service Provided:

Command:

Directorate:

Military Unit:

Date:

PART 1 General SAT UNSAT

1.10. Contractor Responsiveness: The Project Manager or designated alternate shall be available for telephone communication or site attendance, with the COR, as required by the COR, 24 hours a day, 7 days a week. 1

COMMENTS:

1.8. Meetings, Conferences, and Briefings: The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information.

COMMENTS:

1.5.4.3. Contractor Support Hours: The contractor is responsible for conducting business, between the hours of 8 AM to 5 PM, Monday thru Friday

COMMENTS:

1.21.1. AT Level I Training: The contractor will submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after training is completed by all employees and subcontractor personnel.

COMMENTS:

1.6.3. Access and General Protection/Security Policy and Procedures: The contractor and all associated subcontractor employees will comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative).

COMMENTS:

1.22.3. iWATCH/iSALUTE Training: This training will be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar days after the contract is awarded.

COMMENTS:

QASP – Bulgarian Local National Engineer Support Services Page 8 of 12 Rev 2

1.22.4.1. Contractor Employees Who Require Access to Government Information Systems: All contractor employees with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete DOD information assurance awareness training before access to the information system and then annually thereafter.

COMMENTS:

1.22.2. For Contracts That Require OPSEC Training: According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training

COMMENTS:

1.22.4. For Information Assurance (IA)/Information Technology (IT) Training: All contractor employees and associated subcontractor employees must complete DOD information assurance awareness training before issuance of network access and annually thereafter.

COMMENTS:

1.6.5. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. 1

COMMENTS:

1.7. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. 1

COMMENTS:

1.10. Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer and COR 5 work days after start of contract.

COMMENTS:

1.20. Safety Plan and Program: Contractor personnel shall comply with US Army Europe, and all Army Support Activity Black Sea Safety Rules and Regulations. The contractor shall forward one completed copy of accident reports (local contractors submit copy of locally required accident report; American contractors submit copy of DA Form 285, Feb 09, (Technical Report of United States Army Ground Accident) to the Contracting Officer NLT 3 workdays after occurrence for all personal injury accidents.

COMMENTS:

PART 3 Government Furnished Property, Equipment and Services SAT UNSAT

3.4. Equipment: The Government will provide access to government computers, monitors, scanners, copiers, printers, and telephones. The contractor shall instruct employees on maintaining proper care of all government furnished equipment. 1

PART 4 Contractor Furnished Items and Services SAT UNSAT

4.3. Materials: The Contractor shall provide engineer contractor employees with releveant engineering design references, local material and labor pricing guides, and other engineering technical manuals to assist contract employees, in service requirements of this contract.

Reference materials shall not exceed $500 USD, per employee, for each option year.

QASP – Bulgarian Local National Engineer Support Services Page 9 of 12 Rev 2

PART 5 Specific Tasks SAT UNSAT

5.2.1. Utility Meter Reading: Read meters, on site, with the local utility representatives in order to verify base meter readings for water, natural gas, and electrical on the Main Base and Airfield. Provide meter reading results to DPW monthly. 1

COMMENTS:

5.2.2. Utilities Invoices: Translate utility invoices into English for DPW representatives to review and certify. Invoices requiring translation are electrical, natural gas, and water/sewer invoices provided monthly by the local service providers. 1

COMMENTS:

5.2.3. Demand Maintenance Order (DMO) Processing: Process and record DMO’s received by DPW, prioritize, number, and submit to DPW representatives for approval. 1

COMMENTS:

5.2.4. Plotting of Drawings and Maps: Plot AutoCAD and PDF file utility, facility drawings, and base/range maps for Army units upon demand. 1

COMMENTS:

5.2.5 Facility Services and Design Reviews: Provide technical review services and comments on designs to verify that the Civil, Architectural, Fire/Life Safety, Structure, Mechanical, Electrical, Water, Wastewater, Roads and Grounds, Custodial Services, Refuse Removal, Pest Control, Housing/Billeting, Work Control, Demolition, and Environmental requirements meet Bulgarian codes and design standards.

COMMENTS:

5.2.6. Electrical Support: Provide technical assistance on facilities power, generators, and power transmission requirements with repairs and installation of mechanical, electrical, and HVAC systems (Deliverable # 30). Assist DPW project engineers in their development of designs for renovations, new facilities, and utility systems as required by project tasks, and ensure compliance and procedures are within U.S. and Host Nation facilities engineering standards.

COMMENTS:

5.2.7. Facility Inspections: Provide facility inspection assistance, complete written inspection reports to the Government itemizing deficiencies found and provide local technical solutions in order to program and perform repairs. 1

COMMENTS:

5.2.8. Survey Support: Provide a qualified surveying services. Using survey equipment, GIS, and AutoCAD software that will provide survey measurements and layout drawing support to the DPW project engineers upon request. 1

COMMENTS:

5.2.9. AutoCAD Drawing Support: Provide AutoCAD technical guidance and assistance to DPW project engineers in developing construction AutoCAD drawings, and development of drawing/slide presentations. 1

COMMENTS:

5.2.10. Property Management: Provide property management services developing databases and spreadsheets to assist in the management of a DPW equipment/materials inventorying, tracking of base furniture, and locating equipment assets. Develop detailed facility interior inventory lists and create detailed interior facility maps identifying equipment and furniture locations. Develop Assets will require tagging, numbering, and input into a tracking spreadsheet to determine location and inventory numbers to track logistical movements of equipment and materials and the turn in of damaged property/equipment.

QASP – Bulgarian Local National Engineer Support Services Page 10 of 12 Rev 2

5.2.11. Base Real Property Inventory: Input and maintain databases and spreadsheets of Real Property inventory in the GFEBS software.

5.2.12. Record Keeping Control: Maintain project drawing files and records, compile historical data files, electronic correspondence files, permits, and maintain organized electronic file storage while providing continuous improvement of project documents, forms, templates, design drawing formats, and general task process improvements.

COMMENTS:

5.2.13. Translation Service: Provide technical assessment and translation services on construction authorization related permits, translation of documents from Bulgarian to English or English to Bulgarian for correspondents between Host Nation Military Officials, Bulgarian MoD, local vendors, and technical translation of correspondence from local environmental compliance agencies.

COMMENTS:

5.2.14 Operation and Maintenance: Assist DPW with daily tasks providing facilities repair coordination with Host Nation Military Officials; ensures facilities work requests are processed, scheduled, and performed within the timeframe listed on the DMO’s.

5.2.15. Estimating Local Construction and Material Costs: Provide technical services to assist DPW engineers with finding materials equivalent to products used in typical construction found in the United States. Service may include online searches for Bulgarian or EU products that meet the U.S. specifications required, and gathering local vendor quotes for materials and labor costs to install to assist the DPW engineers with development of construction costs for the local area.

COMMENTS:

5.2.16.1. Environmental Project Reviews: Provide review services to ensure projects, and DMOs, are designed and constructed/repaired in accordance with U.S. and Host Nation environmental laws and regulations. N/A N/A

COMMENTS:

5.2.16.2. Environmental Services Hazardous Material/Waste Storage: Assist the DPW Environmental Engineer with hazardous material storage monitoring and disposal procedures, environmental inspections, updating environmental records and reports, and assist in monitoring facility environmental programs to ensure compliance and procedures are within U.S., EU and Host Nation Hazardous Facilities Management standards.

N/A N/A

COMMENTS:

5.2.16.3. Environmental Water Quality: Provide technical translation assistance interpreting the results of third party contracted water quality tests.

N/A N/A

COMMENTS:

5.2.16.4. Environmental Local Coordination: Assist in the coordination with local environmental agencies for project requirements and permitting needs.

N/A N/A

QASP – Bulgarian Local National Engineer Support Services Page 11 of 12 Rev 2

5.2.16.5. Environmental Standards: Assist with written environmental assessments (technical reports) of utility systems, buildings, and other facilities and make recommendations for repair and/or upgrades. N/A N/A

COMMENTS:

5.2.16.6. Environmental Design: Provide technical guidance and assistance to DPW in developing plans and projects. Assist with field surveys accompanying DPW engineers on site visits, design concepts, assistance on technical drawings, cost estimates, and reviewing design documents for accuracy with Bulgarian and EU environmental requirements. N/A N/A

COMMENTS:

5.2.16.7. Environmental Compliance: Provide technical advice on contractor or government furnished environmental reports with emphasis on construction, waste storage, pest control, domestic water supply, and land usage, in order for DPW to conduct environmental baseline and/or follow-up surveys. N/A N/A

COMMENTS:

5.2.16.8. Permit Processing: Provide technical assessment and translation services on HAZWASTE removal transactions, environmental related permits, real estate transactions, construction related permits; to include assisting the Government with the local real estate and environmental processes. N/A N/A

COMMENTS:

5.2.17. Facility Key Control: Manage the key control program for US buildings on MK (non-high security rooms, buildings) IAW AR 190-51, Security of Unclassified Army Property (Sensitive and Non-sensitive). Provide checkin/checkout key inventory control records for tracking who has been authorized facility keys and access. 1

PART 6 Applicable Publications SAT UNSAT

6.2. Is the contractor adhering to the required publications, forms, etc.?

COMMENTS:

PART 7 Attachment/Technical Exhibit Listing SAT UNSAT

TE-2. Is Contractor submitting required deliverables as required?

QASP – Bulgarian Local National Engineer Support Services Page 12 of 12 Rev 2

TOTALS 41 0

95.00% - 100.00% Found Acceptable 100.00%

0.0% - 94.99% Found Unacceptable

All tasks have been inspected in accordance with this checklist per method of surveillance

KO Summary Report (Required):

Signature and Date of COR:

NAME: DATE:

Signature and Date of Contractor Representative:

NAME: DATE:

File details come from the government source that posted it. Updated .