PWS.pdf
PDF 178 KB Posted
- Solicitation number
- W911QX26QA168
About this file
This is a Performance Work Statement (PWS) for a preventive maintenance service agreement covering EDAX/Gatan ancillary instrument systems at the Army Research Laboratory (ARL), part of DEVCOM Army Research Laboratory.
The contract covers Original Equipment Manufacturer (OEM) authorized maintenance for two Gatan ancillary instrument systems: an Apex Pegasus Integrated X-ray Energy Dispersive Spectrometer (XEDS) and Electron Backscatter Diffraction (EBSD) System (Serial Number 11214), which includes an Octane Elite Super (S/N 21522) and Velocity Super System (S/N 4119), plus Silicon Drift Detector (SDD) Module Coverage. The contract structure consists of one base year plus four optional one-year renewal periods, all at the "Standard Plus" service level. Services must be provided for twelve months per contract period. The contractor shall provide one preventive maintenance visit annually, unlimited telephone support during normal business hours (8:30 A.M. to 5:00 P.M., excluding weekends and federal holidays), onsite repair visits with a targeted response time of less than 48 hours, and priority emergency service with a targeted telephone response time of less than eight hours. Additional requirements include 24-hour availability for initiating service requests by telephone and email with one business day response time, free emergency service and replacement parts (excluding consumables), up to two on-site emergency services at Aberdeen Proving Grounds, Maryland, and adherence to facility access and AT-OPSEC security requirements. All contractor personnel must maintain appropriate personnel security clearances per ARL security authority and comply with NCIC-III and Terrorist Screening Database procedures for facility access. The PWS was signed by Contracting Officer Shanna Dellinger on August 10, 2026, with an effective date of July 31, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) EDAX/Gatan ancillary instrument systems Maintenance Service Agreement
31 July 2026
C.1 Background
In support of its mission and customer programs, the Army Research Directorate (ARD) of DEVCOM Army Research Laboratory (ARL) relies upon electron microscopes to characterize the microstructure and chemistry of materials. There are several electron microscopes owned by DEVCOM ARL of different types, including scanning electron microscopes (SEM), a transmission electron microscope (TEM), and a dual beam focused ion beam (FIB) microscope that are equipped with ancillary equipment manufactured by Gatan/EDAX, Inc. One of these SEMs, the Thermo Fisher NanoSEM 600, has one X-ray energy dispersive spectrometer (XEDS) and one electron backscattered diffraction (EBSD) instrument. These are highly complex instruments whose hardware and software require periodic and routine maintenance, as well as emergency repair to remain fully operational and meet the original performance specifications as defined in their original procurement documents. This contract is for a continuation of services from a previous contract which is set to expire on September 29, 2026. What is requested is to have the above-mentioned instruments placed under a preventive maintenance agreement with one (1) base year and four (4) subsequent option years.
C.2 Objective
The objective is to place the two (2) Gatan ancillary instrument systems under one (1) preventive maintenance service agreement contract so that there is no lapse of coverage from the existing contract. To achieve the objective, a one (1) year preventive maintenance service contract for the base year to cover the two (2) systems and four (4) – one (1) year preventive maintenance service contract options, all at the “Standard Plus” contract level of service.
C.3 Requirement
C.3.1 Period of Coverage The Contractor shall provide Original Equipment Manufacturer (OEM) authorized service for twelve (12) months for the base year and twelve (12) months for each of the four (4) options years.
C.3.2 Equipment Covered The Contractor shall provide routine maintenance on the EDAX ancillary equipment comprised of the following list in the base year:
- Apex Pegasus Integrated X-ray Energy Dispersive Spectrometer (XEDS) and Electron Backscatter Diffraction (EBSD) System Serial Number (S/N) 11214 which includes Octane Elite Super (S/N 21522) and Velocity Super System (S/N 4119.)
Additionally, the XEDS system shall include Silicon Drift Detector (SDD) Module Coverage.
C.3.3 Operation Status Requirement The Contractor shall provide service included in their Standard Plus option described in the GATAN
SERVICE MAINTENANCE AGREEMENT TERMS AND CONDITIONS.
C.3.4 Telephone Support The Contractor shall provide unlimited telephone support during normal business hours, 8:30 A.M. through
5:00 P.M. excluding weekends and Federal holidays.
C.3.5 Preventative Maintenance Visits The Contractor shall provide one (1) Preventive Maintenance (PM) service visit per year.
C.3.6 The Contractor shall provide an onsite repair visit for any field-serviceable products and factory-serviceable products for which a field service upgrade has been purchased with a targeted response time of less than 48 hours.
C.3.7 The Contractor shall provide telephone scheduling for routine preventative maintenance.
C.3.8 The Contractor shall provide priority service for any covered product in need of emergency repair with a targeted telephone response time of less than eight (8) hours for scheduling a service visit.
C.3.9 The Contractor shall provide emergency service for field-serviceable products free-of-charge.
C.3.10 The Contractor shall provide all replacement parts except consumables free-of-charge.
C.3.11 The Contractor shall provide service during normal business hours, 8:30 A.M. through 5:00 P.M. excluding weekends and Federal holidays.
C.3.12 The Contractor shall be available for the initiation of service requests 24 hours a day by telephone. The
Contractor shall also be available by email for the initiation of service requests. The Contractor shall respond within one (1) business day to initiate resolution of the problem with a targeted response time of less than 48 hours.
C.3.13 The Contractor shall include inspection (performance check, alignment and cleaning, as needed) and testing at reasonable intervals as specified for all covered equipment.
C.3.14 The Contractor shall provide up to two (2) On-site Emergency Services at Aberdeen Proving Grounds, MD.
C.3.15 The Contractor shall adhere to U.S. Army Aberdeen Proving Ground and U.S. Army Research Laboratory facilities access requirements.
C.4. Security
All Contractor personnel working on this contract shall have the appropriate personnel security clearance in accordance with (IAW) ARL security authority. The Contractor shall adhere to the following distribution statement with regards to the PWS and information generated under this effort:
C.4.1 Distribution
The Contractor shall adhere to the following distribution statement for all contract award documents and attachments:
DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government agencies (information is not classified but may contain proprietary information) (31JUL2026). Other requests for this document shall be referred to Army Research Laboratory (ARL).
C.5. ANTI-TERRORISM AND OPERATIONS SECURITY (AT-OPSEC) REQUIREMENTS
C.5.1 Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204.9. Personal Identify Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
C.5.2 For contractors that DO NOT require CAC, but require access to a DoD facility or installation Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation facility access and local Security policies and procedures (provided by Government Representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
Contracting Officer:
8/10/2026
X Shanna Dellinger
Contracting Officer (KO) Signed by: DELLINGER.SHANNA.1549883733
File details come from the government source that posted it. Updated .