This performance work statement defines interim contractor support services required for sustainment of the Air Force's Navigational Aid Family of Systems program. The contractor will provide logistics support for 78 very high frequency omni-directional range, tactical air navigation, and fixed very high frequency omni-directional tactical air navigation systems across the United States and overseas locations to maintain 99% operational availability. Services include 24/7 technical support response within one business day, 24/7 parts requisition submission with goal of 24-hour shipment, and maintenance and updates to system software. The related solicitation seeks these interim contractor support services for a base period of performance from September 2020 to March 2021 totaling approximately 472 months of support, with an optional six-month extension. As the incumbent, Thales USA is considered uniquely qualified due to proprietary data rights; however, all responsible sources may submit a proposal which will be considered for this requirement issued by the Air Force Materiel Command Lifecycle Management Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI FoS ICS 2 Extension.pdf | ||
| DID.pdf | ||
| CDRL.pdf | ||
| FA810220R0007.pdf | ||
| WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS for ICS NAVAIDS FOS Modernization
PERFORMANCE WORK STATEMENT
Interim Contractor Support for the Modernization of the
Air Force Navigational Aid Family of Systems
29 Jul 20
Prepared by:
AFLCMC/HBAAA TINKER AFB OK 73145
1. Description of Services
This Performance Work Statement (PWS) defines the effort required to provide Interim Contractor
Support (ICS) for the sustainment of the modernized Navigational Aid Systems (NAVAIDS)
Family Of Systems (FOS) which includes the modernized Very High Frequency Omni-Directional
Range (VOR), Fixed Tactical Air Navigation (TACAN) and Fixed Very High Frequency Omni-
Directional Tactical Air Navigation (VORTAC). Through a comprehensive logistics support plan, the Contractor is to establish and implement ICS. The Contractor shall provide all qualified personnel, materials, management, technical services, equipment and contractor facilities necessary to support the requirements of this PWS.
1.1. Interim Contractor Support
The USAF has 79 systems (63 TACANs, 15 VORTACs & 1 VOR) currently fielded at various
CONUS & OCONUS location that require ICS support. The ICS program shall provide the
Government with a full range of depot support services throughout the contract. The Contractor shall provide the level of support required to sustain the required Operational Availability (Ao) of
99% for the modernized NAVAIDS FOS. As part of this support, the Contractor shall provide technical troubleshooting and operational support services which the Government can utilize 24 hours a day, 7 days a week with Contractor responses provided no later than the next business day.
1.1.1. Hardware Support
As a part of the ICS program, the Contractor shall develop and implement a plan to provide supply support for failed hardware for the modernized NAVAIDS FOS. The supply plan shall allow for submission of parts requisitions by the Government 24 hours a day, 7 days a week and a goal for
Contractor’s shipment of requested items within 24 hours of requisition. If the part is not available in revolving stock, a new part may have to be removed from a new system in inventory which could take up to one week to process.
1.1.2. System Software Support
As part of the ICS program, the Contractor shall develop and implement a plan to maintain and update the modernized NAVAIDS FOS software. Through this plan, the Contractor shall revise the software as required to resolve issues as may be discovered during and after fielding the
NAVAIDS FOS modernization. This shall include issues that are discovered by the Government as well as those discovered by the Contractor. This provision does not include support for Windows 10
SHB, which is an issue that will be addressed by a separate Government procurement.
1.2. Mission Essential Services
The contractor shall prepare for the continuation of essential Department of Defense (DoD) services during crisis In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement
(DFARS) 252.237-7023. In a state of emergency, if the Government deems necessary, the Contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours. IAW
DFARS 252.237-7023, the Contractor shall develop a contingency plan and furnish a copy to the
Administrated Contracting Officer (ACO) for those tasks identified as essential to provide reasonable assurance of continuation during crisis conditions.
CDRL. NO. Authority CDRL Title-subtitle
A001 DI-ILSS-80095/T Integrated Logistics Support Plan
1.3. Security
The Contractor shall perform all activities required to meet the security requirements of DoD facilities they are required to access during the performance of this contract. The Contractor, when working in DoD facilities, shall wear identification badges on their outer garment in the chest area and abide by all rules, regulation, etc. of the DoD facility. Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with
Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
1.4. Period of Performance
The period of performance will begin on the date of contract award or expiration of system coverage as denoted below, whichever is later.
1.5. ICS List
BASE Configuration ICS Expires
Ellsworth AFB, SD TACAN 9/28/2020
Elmendorf AFB, AK TACAN 9/28/2020
Minot AFB, ND TACAN 9/28/2020
Eielson AFB, AK TACAN 9/28/2020
Kunsan AB, Korea ** VORTAC 9/28/2020
Mountain Home AFB, ID TACAN 9/28/2020
Fairchild AFB, WA TACAN 9/28/2020
Francis S. Gabreski Airport ANG, NY
TACAN 9/28/2020
Selfridge ANGB, MI TACAN 9/28/2020
MacDill AFB, FL TACAN 9/28/2020
McChord AFB, WA TACAN 9/28/2020
Grissom ARB, IN VORTAC 9/28/2020
Portland ANG, OR** TACAN 9/28/2020
Beale AFB, CA TACAN 9/28/2020
Scott AFB, IL TACAN 9/28/2020
Travis AFB, CA TACAN 9/28/2020
Little Rock AFB, AR TACAN 9/28/2020
McGuire AFB, NJ VORTAC 9/28/2020
Seymour-Johnson, NC TACAN 9/28/2020
Dobbins TACAN 9/28/2020
Vance AFB, OK VORTAC 9/28/2020
Edwards AFB, CA VORTAC 9/28/2020
Moody AFB, GA TACAN 9/28/2020
Maxwell AFB, AL TACAN 9/28/2020
RMC CHOTS - CONUS (Tinker
AFB, OK)
VORTAC 9/28/2020
Nellis AFB, NV TACAN 9/28/2020
Langley AFB, VA TACAN 9/28/2020
Laughlin AFB TX VORTAC 9/28/2020
JGB McEntire ANG, SC VORTAC 9/28/2020
**Creech AFB,Indian Springs AFB, NV
TACAN 9/28/2020
Tinker AFB TACAN 9/28/2020
Westover ARB, MA TACAN 9/28/2020
Randolph AFB, TX TACAN 9/28/2020
Lackland AFB, TX TACAN 9/28/2020
Shaw AFB, SC TACAN 9/28/2020
Homestead ARB, FL TACAN 9/28/2020
McConnell AFB, KS TACAN 9/28/2020
Toledo, Ohio ANG TACAN 9/28/2020
Greenville AFRC ** TACAN 9/28/2020
Soto Cano AB, Honduras VORTAC 9/28/2020
Columbus AFB, MS VORTAC 9/28/2020
Ellington Field ANGB, TX TACAN 9/28/2020
Patrick AFB, FL TACAN 9/28/2020
Tonopah Test Range, NV #1 VORTAC 9/28/2020
Barksdale AFB, LA TACAN 9/28/2020
Lajes Field, AZ VOR 9/28/2020
Offutt AFB, NE TACAN 9/28/2020
Ft Campbell,KY (Army)** TACAN 9/30/2020
**Thule AB, Greenland VORTAC 10/9/2020
Whiteman AFB, MO TACAN 10/14/2020
March ARB, CA TACAN 10/21/2020
Dover AFB, DE TACAN 10/12/2020
Tyndall AFB, FL TACAN 10/14/2020
Pope AFB, NC TACAN 10/19/2020
**Tonopah Test Range, NV #2 VORTAC 9/30/2020
Randolph AFB, TX VORTAC 10/1/2020
Altus AFB, OK VORTAC 10/1/2020
Forbes ANGB, KS TACAN 10/1/2020
Sheppard AFB, TX TACAN 10/1/2020
Eglin AFB, FL TACAN 10/25/2020
Andersen AFB, Guam TACAN 11/12/2020
Misawa AB, Japan TACAN 11/15/2020
Cannon AFB, NM TACAN 11/17/2020
Dyess AFB, TX TACAN 11/18/2020
Ft. Huachuca AAF, AZ** TACAN 12/6/2020
Volk Field ANG, WI TACAN 12/6/2020
Luke AFB, AZ TACAN 12/9/2020
Davis-Monthan AFB, NM TACAN 12/14/2020
Moffett TACAN 12/16/2020
Holloman TACAN 12/21/2020
Vandenberg AFB, CA TACAN 12/23/2020
Keesler AFB, MS TACAN 1/8/2021
**Michael AAF, UT TACAN 1/24/2021
Hurlburt Field AFB, FL TACAN 1/28/2021
Buckley AFB, CO TACAN 2/6/2021
Aviano AB, Italy TACAN 2/12/2021
Keesler Schoolhouse, MS TACAN 2/14/2021
Robins AFB, GA TACAN 2/28/2021
Niagara ARB, NY TACAN 3/13/2021
2. Contractor Manpower Reporting
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via a secure data collection site. The contractor is required to completely fill in all required data fields at https://www.ecmra.mil/Default.aspx. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30
September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
3. Service Summary
Contractor performance shall be measured and assessed, using the Performance Objectives listed in the Service Summary Table. The Contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the ACO will take appropriate measures.
The absence of any contract requirement from the Service Summary shall not detract from this enforceability nor limit the rights or remedies of the Government under any other provision of the contract.
The Contractor shall address all deficiencies noted by the Government while performing the surveillance of this service delivery. The Contractor shall prepare and maintain a numbered list of deficiencies, the repair of the deficiency, the root cause(s) for the deficiencies and changes they will implement to prevent the mishap in the future. The Government shall be able to review an up-to-date list at all times.
Performance Objectives PWS Paragraph
Performance Threshold https://www.ecmra.mil/Default.aspx
For those components and software installed to support this modernization effort, the Contractor shall provide the level of support required to sustain the required
Operational Availability (Ao) of
99% for the modernized NAVAIDS
FOS.
1.1 Each modernized NAVAIDS
FOS meets 99%
Ao through the life of this contract.
The Contractor shall provide technical troubleshooting and operational support services which the Government can utilize 24 hours a day, 7 days a week with
Contractor responses provided no later than the next business day.
1.1 No more than 1 incident of
support services not being available in a month. No more than 1 incident per month of
Contractor responses later than the next business day and not more than 24 hours late.
Submission of parts requisitions by the Government 24 hours a day, 7 days a week and Contractor shipment of requested items within
24 hours of requisition.
1.1.1 No more than 1 incident of
requisition support not being available in a month. No more than 1 incident per month of late shipment and not more than 24 hours late. (Except when required replacement must be pulled from complete system which could take up to 1 week)
4. Government Furnished Property
The ICS program shall not utilize Government resources (manpower, Government furnished equipment/material, facilities, etc.) as support for the program.
5. Integrated Logistics Support Plan
Notwithstanding anything set forth in this PWS to the contrary, Thales may satisfy the requirement to submit an Integrated Logistics Support Plan as CDRL A001 (“ILS Plan”) to the Government by submitting the same Integrated Logistics Support Plan that Thales previously submitted to the
Government under FA8102-13-D-0001. The sole change that Thales shall be required to make to the
ILS Plan prior to submission is an update to the equipment turn-around time in accordance with the verbiage set forth in Section 1.1.1 of this PWS.
6. Over & Above
As required by the Government, the Contractor shall provide additional personnel support or other resources for the NAVAIDS FOS Modernization as an over and above effort. Upon request by the