PWS.pdf
PDF 91 KB Posted
- Attached to
- Feedlot Shades Maintenance - Clay Center, NE
- Solicitation number
- 12805B24Q0194
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to extend, inspect, and retract NetPro Protective Canopy shade systems covering feedlot and sheep pens at the USDA's U.S. Meat Animal Research Center in Clay Center, Nebraska.
The PWS outlines the technical requirements, which include extending all shade structures over specified livestock pens during May 2024, performing a mid-season inspection between June-September 2024 to provide a quote for any necessary repairs, and rolling up and securing all shade structures during October 2024. The period of performance is from May 1, 2024 to April 1, 2025, with an option year for 2025. The solicitation number is 12805B24Q0194, and the associated NAICS code is 238990 with a small business size standard of $19.0M. Quotes are due by 5:00 PM Central Time on April 22, 2024, and the Government intends to award a firm fixed price purchase order to the responsible offeror whose quote conforms to the specifications and is the most advantageous based on technical acceptance, past performance, and price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule of Items Fillable.xlsx | XLSX spreadsheet | |
| 12805B24Q0194.pdf | ||
| 2015-5357 Wage Rates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Feedlot Shade Cloth Extend/Roll-up
Feedlot 700 Series, 600 Series, Sorting pens, Sheep 100 Series
a. Scope
The USDA, ARS, U.S. Meat Animal Research Center (USMARC) has a requirement to extend, inspect, and retract NetPro Protective Canopy shade systems covering feedlot pens and sheep pens. There are 5 of these over the 700 series pens, 5 over the 600 series pens, one-12’ x 290’ (approx.) over one group of sorting pens, and one 12’ x 342’(approx.) over anther group of sorting pens. There are 48 of these over the 100 series sheep pens.
Contractor shall identify pens where tears in shade cloth exist during extension and retraction of shades.
Prior to the extension of shade canopies, contractor shall identify any shade materials missing which are needed to complete the extension. Contractor shall use tools and methods recommended by U.S.
NetPro representative including the proper tension of the wires during extension which attach to the cables.
b. Background
All shade systems must be extended during the month of May. All shade systems must be retracted during the month of October. Contractor will be expected to perform one inspection of the system between these months and provide a quote to the U.S. Meat Animal Research Center to repair tears in shade cloth.
c. Technical Requirements line items:
1. Extend Shade Cloths – Period of Performance 05/01/2024 to 05/31/2024
Contractor must extend, stretch, and secure all shade structures over specified livestock pens at the U.S. Meat Animal Research Center. Work must be performed in the month of May 2024 and be completed no later than 05/31/2024. See shade structure drawings.
2. Mid-Season Inspection – Period of Performance 06/01/2024 – 09/30/2024
Contractor must perform one visit to the U.S. Meat Animal Research Center Feedlot to inspect the shades and provide the location a quote for any repairs in needed.
3. Roll-up Shade Cloths – Period of Performance 10/01/2024 – 10/31/2024
Contractor must roll-up and secure all shade structures over specified livestock pens at the U.S.
Meat Animal Research Center. Work must be performed in the month of October and be completed no later than 10/31/2024. See shade structure drawings.
d. Place of Performance
U.S. Meat Animal Research Center, Clay Center, NE 68933
Performance Work Statement
e. Period of Performance
The expected period of performance for this work will be 05/01/2024 – 04/01/2025.
f. Option Year
It is required that a price be provided for an option to perform this work for year 2025 in addition to the price being requested for this work done in 2024.
File details come from the government source that posted it. Updated .