PWS.pdf
PDF 293 KB Posted
- Attached to
- MITD Hagglund Crane FY23 Recompete
- Solicitation number
- W911S023R0005
About this file
This document contains a statement of work and related federal contract opportunity. The statement of work outlines maintenance requirements for a Hagglund Crane located at Fort Eustis in Virginia. The contractor shall maintain electrical, mechanical, hydraulic, and structural systems to keep the crane in a high state of readiness for training. Specific tasks include inspections, repairs, preventative maintenance, and responding to emergencies within 36 hours. The period of performance is a one-year base period and four one-year options running from 2023 to 2028. The related federal contract opportunity is a recompete to provide the same crane maintenance services. The solicitation was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911S023R0005 - Amendment 1_Conform.pdf | ||
| W911S023R0005 - Amendment 1_Changes.pdf | ||
| W911S023R0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Transportation School (USATSCH) Maritime & Intermodal Training Department (MITD)
Statement of Work MITD – Hagglund Crane Maintenance
AMO 23-617
Purpose:
The Contractor shall provide maintenance for the Hagglund Crane that is located at building 415 the Vissering Landship Training Facility. All work shall be performed by qualified personnel in accordance with applicable laws, regulations, documents, and Government-developed annual and long-range plans. The Hagglund crane is used in multiple Programs of Instruction (POI), for sustainment training and assorted heavy lifts. The Hagglund crane must be maintained in a high state of maintenance readiness to facilitate training and prevent any possible safety of life issues to soldiers.
1.0 Introduction: The Contractor shall maintain and repair the Hagglund Crane by maintenance standards specified in the technical exhibit of this contract. Hagglund Crane components include, but are not limited to, electrical systems, mechanical components, hydraulic lines, gearbox repairs, boom structures, and winches. The Contractor shall coordinate all work with the requester in order to preclude life threatening situations, hardships, and operational problems. All work shall be performed by qualified personnel in accordance with (IAW) applicable laws, regulations, and documents.
2.0 Scope of Services:
2.1 Work Area/System Description: The Contractor shall maintain and repair the Hagglund Crane by maintenance standards specified in the technical exhibit of this contract. Hagglund Crane components include, but are not limited to, electrical systems, mechanical components, hydraulic lines, gearbox repairs, boom structures, and winches. The Contractor shall coordinate all work with the requester in order to preclude life threatening situations, hardships, and operational problems. All work shall be performed by qualified personnel in accordance with (IAW) applicable laws, regulations, and documents.
2.2 Work Management and Control: Reporting Requirements. The contractor shall prepare, submit, and maintain all records and reports as specified herein. Repairs. The Contractor shall accomplish repairs when it is essential to prevent damage to the crane or to minimize the impact to Government operations. The Contractor shall obtain approval from the KO (or designated representative) for the method and materials to be used to accomplish temporary repairs. The COR will work with the contractor to order parts for repairs not covered under the maintenance Inspection.
2.3 Repair: Contractor will upon any finding repairs needed to the Hagglund Crane during scheduled maintenance will be reported to COR. COR will coordinate with contractor to schedule a return trip to Fort Eustis for Emergency Repairs needed.
2.4 Parts/Equipment: Contractor will upon any finding repairs needed to the Hagglund Crane during scheduled maintenance will be reported to COR. Parts/Equipment identified as deficient will be ordered by the company or MITD based on cost and discussion between MITD COR and Contractor.
2.5 Reimbursable Travel: Authorized travel expenses will be reimbursed consistent with generally accepted accounting principles, cost accounting standards, and Federal Acquisition Regulation (FAR) 31.205-46.
3.0 Scheduled Tasks:
The contractor shall ensure the contractors perform the tasks described in the technical exhibit below on a recurring or scheduled basis and record the work under approved Standing Operating Orders. The Contractor shall maintain all Hagglund Crane components during the contract period in a safe, operational, and aesthetically pleasing condition as specified herein or as directed by the Government. Quarterly routine and preventive maintenance tasks shall be performed to a standard that prevents deterioration beyond normal wear and tear. The Contractor shall be responsible for performing and scheduling all inspections and preventive maintenance actions IAW the paragraphs that follow. Emergency Marine Luffing Crane Repair/Trouble Shooting Response Requirement will be issued to the
Contractor requiring a specific diagnosis inspection. Emergency response must be provided within 36 hours include suggested scope of work and a list of materials required to correct the problem(s) found.
3.1 General Criteria. The contractor complies that the Hagglund Crane is free of missing components or defects that would affect the safety or use of the crane, or would prevent any electrical, mechanical, and/or structural system from functioning according to design. Scheduled service will be requested by MITD representative. During each scheduled inspection, the contractor shall contact the crane coordinator, Mr. Kurt Murphy, 757-878-6412, kurt.murphy.civ@mail.mil, to determine if any issues exist with the crane and operational status.
3.2 Specific Tasks. See exhibit 1, Maintenance Inspection Specification and Record for Macgregor Cranes.
4.0 Government Furnished Items and Services. N/A.
5.0 Contractor Furnished Items and Responsibilities. The Contractor shall furnish all labor, supplies, equipment, tools, clean-up services required to perform work under this contract.
6.0 Period of Performance.
Base Year: 1 July 2023 – 30 June 2024 OY1: 1 July 2024 - 30 June 2025 OY2: 1 July 2025 - 30 June 2026 OY3: 1 July 2026 - 30 June 2027 OY4: 1 July 2027 - 30 June 2028
7.0 Payment Instructions. Wide Area Work Flow (WAWF) will be utilized to process payments. Invoices will be submitted upon completion of the rendering of each service provided. Submit in WAWF as a “combo”/2 and 1 Invoice. Submissions must be accurate and timely.
8.0 Technical Exhibit.
Technical Exhibit 1 Maintenance Inspection
Specification and Record for Macgregor Cranes
Sheet of
Crane Type Manu factor
Capacity
Prior inspection Current Inspection
Date/Hours Type Date/Hours Type
Item
Inspection Type Items to be inspected Maintenance inspection
Specification System inspected Condition
A B C S U C NA
1 Condition inside electric boxes Electrical
2 Controls and indicators in cabin Electrical
3 Alarm siren / bell Electrical
4 Lights Electrical
5 Wiper Electrical
6 Timing feed pump to main pump start Electrical
7 Timing star/delta Electrical
8 Valve 4149 function Electrical
9 Oil cooler motor with thermostat Electrical
10 Valve 4149 function Electrical
11 Emergency stop in bottom / inside of crane
Electrical
12 Heater for main electric motor Electrical
13 X Condition of slip-ring unit Open and check slip-ring unit Electrical
14 Setting of thermal relays Electrical
15 Crane house ventilation Electrical
16 Check fuse size Electrical
17 Condition inside box B / MB / CT2 Electronic
18 Input voltage 24 VDC Electronic
19 Input voltage 2 x20 VDC or 1x 8 VDC Electronic
20 Indication display (B-box) Electronic
21 Heater in box MB / CT2 Electronic
22 Check settings according 625/1484 Electronic
23 Function, Hoisting Brake System
24 Function, Luffing Brake System
25 Function, Slewing Brake System
26 Adjustment, Hoisting Brake System
27 Adjustment, Luffing Brake System
28 Brake cylinder condition, Hoisting Brake System
29 Brake cylinder condition, Luffing Brake System
30 Brake band condition, Hoisting Brake System
31 Brake band condition, Luffing Brake System
32 Links & eccentric shafts, Hoisting Brake System
33 Links & eccentric shafts, Luffing Brake System
34 Bolt connections and securing plate, Hoisting
Brake System
35 Bolt connections and securing plate, Luffing
Brake System
36 Parking brake Brake System
37 Backlash slewing rim / pinion Brake System
38 X Full drum Function test, Open and check limit switch box condition Limits
39 X Speed reduce to full drum Function test, Open and check limit switch box condition Limits
40 X Empty drum Function test, Open and check limit switch box condition Limits
41 X Speed reduce to empty drum Function test, Open and check limit switch box condition Limits
42 X Slack wire function Function test, Open and check limit switch box condition Limits
Maintenance Inspection Specification and Record for Macgregor Cranes
Sheet of
Crane Type Manu factor
Capacity
Prior inspection Current Inspection
Date/Hours Type Date/Hours Type
Item
Inspection Type Items to be inspected Maintenance inspection
Specification System inspected
43 X Wire guide condition Function test, Open and check limit switch box condition Limits
44 X Min outreach Function test, Open and check limit switch box condition Limits
45 X Speed reduce to min outreach Function test, Open and check limit switch box condition Limits
46 X Max outreach Function test, Open and check limit switch box condition Limits
47 X Speed reduce to max outreach Function test, Open and check limit switch box condition Limits
48 X Overriding of function max outreach Function test Limits
49 X Jib parking position Function test, Open and check limit switch box condition Limits
50 X Slack wire Function test Limits
51 X Wire guide condition Inspection condition Limits
52 X Slewing right Function test, check limit switch condition Limits
53 X Speed reduce to slewing right Function test, check limit switch condition Limits
54 X Override limit slewing right Function test, Limits
55 X Slewing left Function test, check limit switch condition Limits
56 X Speed reduce to slewing left Function test, check limit switch condition Limits
57 X Override limit slewing left Function test, Limits
58 Feed pressure in, gauge outlet 1 Pressure
59 Feed pressure out, gauge outlet 16 Pressure
60 Control pressure, gauge outlet 2 Pressure
61 Accumulator pressure Pressure
62 Lubrication pressure, gauge outlet 13 Pressure
63 Overload switches Pressure
64 Feed pressure switch 1381 and 2481 Pressure
65 Any abnormal noise from pumps Pumps and motors
66 Any abnormal noise from motors Pumps and motors
67 Servo valves working normally Pumps and motors
68 Any abnormal noise from gearbox Pumps and motors
X
Lubrication of gearbox
1st 200 hour change out oil in 15 gearbox’s, Check all oil levels and add oil as needed
Pumps and motors
70 Check filter indicator Filters and Tanks
71 Last filter change Change out filter elements Filters and Tanks
72 Last air breather change Filters and Tanks
73 Last tank cleaning Filters and Tanks
74 Last oil change Filters and Tanks
75 Last oil analyses Take samples of 2 main hydraulic oil tanks Filters and Tanks
76 Couplings and hoses Oil Leakage
77 Valves and valve seals Oil Leakage
78 Pumps Oil Leakage
79 Motors Oil Leakage
80 Luffing cylinder Oil Leakage factor
Capacity
Prior inspection Current Inspection
Date/Hours Type Date/Hours Type
Item
Inspection Type Items to be inspected Maintenance inspection
Specification System inspected
81 Gearboxes Oil Leakage
82 Oil cooler Oil Leakage
83 Accumulator Oil Leakage
84 Are recommended lubricant used Lubrication
85 Oil levels, tank and gearboxes Lubrication
86 Check all grease points Lubrication
87 Is the crane house free from oil / grease
Lubrication
88 Crane lubrication Lubrication
89 Hoisting plussing Speeds
90 Hoisting without load Speeds
91 Hoisting with load = ton
Speeds
92 Luffing plussing Speeds
93 Luffing without load Speeds
94 Luffing with load = ton
Speeds
95 Slewing without load Speeds
96 Slewing with load = ton
Speeds
97 X RBTS wire ropes Inspect for damage, Slush cables
Wires, Sheaves block and hook
98 X RBTS wire clamps and bolts Wires, Sheaves
99 X RBTS wire locking of thimbles Wires, Sheaves
100 X Hoisting wire Inspect for damage, Slush
101 X Hoisting wire clamps and bolts Wires, Sheaves
102 X Hoisting wire locking of thimble Wires, Sheaves
103 X Luffing wire Inspect for damage, Slush
104 X Luffing wire clamps and bolts Wires, Sheaves
105 X Luffing wire locking of thimble Wires, Sheaves
106 X Hoisting wire sheaves Wires, Sheaves
107 X Luffing wire sheaves Wires, Sheaves
108 X Lifting block with hook Wires, Sheaves
109 X Lubrication Grease at all fitting points, Grease slewing gears Slewing Bearing
110 X Inner studs / bolts check Slewing Bearing
111 X Outer studs / bolts check Slewing Bearing
112 X Play measurements according to
Service Information 625/1579 Take rocking test measurements Slewing Bearing
113 Painting Condition
114 Jib and crane housing Condition
115 Windows with seal Condition factor
Capacity
Prior inspection Current Inspection
Date/Hours Type Date/Hours Type
Item
Inspection Type Items to be inspected Maintenance inspection
Specification System inspected
116 Foundation and pedestal Condition
117 Condition of Encoders Twin Platform
118 Condition inside BA box Twin Platform
119 Synchronizing, Hoisting Twin Platform
120 Synchronizing, Luffing Twin Platform
121 Brake function, twin platform Twin Platform
122 Adjustment of brakes, twin platform Twin Platform
123 Brake cylinder condition, twin platform Twin Platform
124 Brake band condition, twin platform Twin Platform
125 Links & eccentric shafts, twin platform Twin Platform
126 Backlash slewing rim / pinion, twin platform
Twin Platform
127 Twin beam with hook and links Twin Platform
File details come from the government source that posted it. Updated .