PWS - Dorm Campus Install Key Card Door Locks.docx

DOCX document 27 KB Posted

Attached to
Install Key Card Door Lock System, RAFB Federal contract opportunity
Solicitation number
FA850122R0007
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Install Key Card Door Lock System, RAFB, newest first.
File Type Posted
Solicitation - FA850122R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Dorm Campus Install Key Card Door Lock System Work Task 31 March 2022

1.0 DESCRIPTION OF SERVICES/GENERAL INFORMATION.

1.1. The contractor shall provide all material and labor to install an Magnetic Strip key card lock system at B756, B758, B759, B780, B781, B795, B796, B797 to include the following:

1. OnPortal Encoding System

2. OnPortal License

3. Mag Stripe Motorized Encoder

4. Qty. 1500 HiCo Magnetic Key Cards

5. Qty. 276 Trillium, Mag Stripe Reader Door Locks LH

6. Qty. 276 Trillium, Mag Stripe Reader Door Locks RH

7. Qty. 5 Spare Trillium, Mag Stripe Reader Door Locks LH

8. Qty. 5 Spare Trillium, Mag Stripe Reader Door Locks RH

9. Qty. 562 Weather Kits (Moisture Boot)

10. Set up and training for key card system

Note: All new components must be compatible with existing Onity key card system.

2.0 SERVICES SUMMARY:

Performance Objectives
Reference Para.
Performance Threshold
B756, B758, B759, B780, B781, B795, B796, B797 Install Key Card Door Lock System
1
No deficiencies

3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES: The contracting officer’s representative (COR) will provide the contractor access to the dormitory building. The government will require the contractor to restore the work areas back to the as – received conditions prior to cleaning upon completion of cleaning tasks. The government will provide the contractor access to power requirements.

4.0 WARRANTY AND TECHNICAL SUPPORT REQUIREMENTS: Manufacturer’s warranties apply on all parts and labor. The warranty and technical support period commences no earlier than April 2022. Installation must be performed by a manufacturer-certified installer with an active manufacturer contract.

5.0 PERIOD OF PERFORMANCE: Contract performance shall be completed by 1 June 2022.

6.0 APPENDICES: N/A

File details come from the government source that posted it. Updated .