PWS Cband Radar DPG 01May23.docx

DOCX document 50 KB Posted

Attached to
Doppler Cbad Radar Maintenance and Repair
Solicitation number
W911S623Q0014
Issued by

About this file

This performance work statement outlines the requirements for a firm fixed price contract to provide Doppler C-band radar maintenance and repair services for the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood. The contractor shall provide all necessary personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items to perform annual on-site calibration, maintenance, inspection, evaluation, repairs, remote technical support, and software updates for one C-band fixed site radar located at Dugway Proving Ground. The performance period is for one base year starting in September 2023 with four 12-month option periods. The contractor must meet standards for on-site visits, remote support response times, and software updates to ensure uninterrupted radar operations.

View the file

Other files

File Type Posted
Sources Sought Cband Radar DPG 01May23.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

PERFORMANCE WORK STATEMENT (PWS)

C-band Doppler Radar Maintenance

Part 1 General Information

1. GENERAL: This is a non-personnel services contract to provide C-band Doppler Radar maintenance. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the Meteorology Division FY23 Doppler Weather Radar Sustainment as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: On 20 December 2020, contract W911S6-20-P-0023 was awarded to Enterprise Electronics Corporation (EEC) for the maintenance of C-band (fixed site) and X-band (mobile) doppler radars. In 2022 the decision was made to remove X-band mobile radar from the contract starting with option year 2 (OY2). OY2 will end in September 2023, and a follow-on contract will only include the maintenance and repair of the C-band radar.

On 20 December 2006, contract W911S6-07-0013 was awarded to EEC for the DPG procurement of a fixed-site and mobile radar. Since that initial award, several amendments were applied to the contract to provide for site preparation for the fixed-site radar, optional radar features, additional site visits by the contractor, cost adjustments, delivery delays, and adjustments to other contractual obligations. The radars were delivered to DPG and began operation in 2008.

On 20 September 2011, a single-year contract W911S6-11-P-0200 was awarded to EEC for the on-site maintenance of a fixed-site and mobile radar owned by DPG. On 29 September 2014, contract W911S6-14-P-0101 was awarded to EEC to provide a dual polarization upgrade to both radars.

1.3 Objectives: A maintenance contract will ensure uninterrupted operation of the Dugway Proving Ground (DPG) C-band Doppler radar, which is a critical meteorological asset that provides advanced warning of potential weather hazards to the West Desert Test Center (WDTC) testing operations, as well as the DPG community. The services include but are not limited to evaluation of current radar operations, repairs to defective radar components, and reporting of the status of the radar.

1.4 Scope: The contractor will provide the DPG Meteorology Division with the evaluation, maintenance, repair, and status reporting of one (1) radar systems, the C-Band fixed-site radar. Services beyond the evaluation, repair, and maintenance as outlined in Section 5 (specific tasks) fall outside the scope of the contract. Infrastructure and components related to the infrastructure, such as diesel generators, uninterruptable power supplies (UPS), and DPG network connectivity also fall outside the scope of this contract and are the responsibility of the Government.

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (4) 12-month option years. The Period of Performance reads as follows:

Base Year(4 September 2023 - 3 September 2024)
Option Year I(4 September 2024 - 3 September 2025)
Option Year II(4 September 2025 - 3 September 2026)
Option Year III(4 September 2026 - 3 September 2027)
Option Year IV(4 September 2027- 3 September 2028)

1.6 General Information

1.6.1 Quality Control The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is how he assures himself that his work complies with the requirement of the contract. The finalized QCP will be accepted by the government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the contractor of required modifications to the plan during the period of performance. The contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than ten (10) working days prior to effective date of the change. The QCP shall be subject to the government's review and approval. The government may find the QCP "unacceptable" whenever the contractor's procedures do not accomplish quality control objective(s). The contractor shall revise the QCP within ten (10) working days from receipt of the notice that QCP is found "unacceptable. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: The federal government recognizes 11 holidays in which government activities relating to this contract are curtailed. Contractor's employees are not required to work during the Federal holidays; however, they must adhere to their employer's policies regarding holiday, annual, or sick leave. Furthermore, if a contractor chooses to work on a holiday, interaction with government employees is limited or not possible. Holidays falling on a Sunday shall be observed on the following Monday. Any of the holidays falling on a Friday or Saturday shall be observed on the proceeding Thursday. The federal government holidays follow:

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

Juneteenth

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700 and 1730 Monday thru Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at Dugway Proving Ground. The locations will include Meteorology buildings and the C-band radar site in West Desert.

1.6.6 Type of Contract: The government will award a Firm Fixed Price (FFP) contract.

1.6.7 Security Requirements: The security requirements are in accordance with the attached DD254, contractor personnel will have to complete required documentation in order to have access to the range.

1.6.7.1 PHYSICAL Security: The Contractor shall safeguard all Government information and property provided for Contractor use. At the close of each work period, Government facilities shall be secured. The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes IAW facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services. The Contractor shall return all issued US Government Common Access Cards (CAC), Installation badges, and/or access passes to the COR when the contract is completed or when a Contractor employee no longer requires access to the Installation or facility. The Contractor shall demonstrate compliance with all personnel identity verification procedures. If the COR determines that the Contractor is not ensuring all access cards, badges, etc., are being returned as required under this section, the KO may act against the Contractor to the extent allowed under the FAR and applicable supplements. Actions taken against the Contractor for their failure to comply with this requirement shall not relieve them of their duties associated with this contract. Force Protection Condition (FPCON) impact on work levels: During FPCONs Charlie and Delta, services are discontinued. Services shall resume when the FPCON level is reduced to level Bravo or lower. Procedures for complying with requirements addressed herein shall be included in the CQCP.

1.6.7.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.2.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.9 Anti-Terrorism (AT) and Operations Security (OPSEC): The following sections provide applicable AT / OPSEC requirements, unless otherwise noted.

1.6.9.1 AT Level I Training: This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil

1.6.9.2 Access and General Protection/Security Policy and Procedures: This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.9.3 AT Awareness Training for Contractor Personnel Traveling Overseas: This standard language required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

1.6.9.4 iWATCH Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within calendar days of contract award and within calendar days of new employees commencing performance with the results reported to the COR NLT calendar days after contract award.

1.6.9.5 Contractor Access to Government Information Systems: All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

1.6.9.6 Contracts That Require a Formal OPSEC Program: The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.

1.6.9.7 Contracts that Require OPSEC Training: Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

1.6.9.8 Threat Awareness Reporting Program: For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

1.6.10 Contractor Access to DPG: Access to DPG requires that Contractor employees voluntarily submit personal data (e.g. Name, social security number) when applying for a DPG Identification Card or Temporary Access Pass. This information is routinely used by DPG Law Enforcement and Security personnel to conduct driver's license and criminal history/background checks. Adverse information revealed by such checks (e.g. Outstanding criminal warrants, criminal history indicating a potential risk to DPG Installation security, or similar negative information indicating a potential security and/or law enforcement risk to DPG) may result in denial of access and/or re-entry to DPG. Delays caused by any adverse employee information does not constitute a basis for claim by the Contractor. It is the Contractor's responsibility to assure all personnel scheduled to work on the installation have acceptable background checks completed and on file.

1.6.10.1 Personnel Security: Some of the work required by this contract may require access to restricted areas. Occasional delays in obtaining authorization for access to these areas or escort to a work site may be anticipated. The Contractor's personnel requiring unescorted entry to restricted or other sensitive areas designated by the Installation Commander shall comply with AR 25-2 and AR 380-67 Personnel Security Program.

1.6.10.2 Security Badge Requirements: The Contractor is responsible for security badges issued to their employees and/or employees of their subcontractors. A designated representative (being an officer or supervisor of the Contractor) shall co-sign for each individual when obtaining the required item(s). Additionally, the Contractor shall provide to the KO a list of employees needing badges under the awarded contract prior to initiation of work. The Contractor shall submit to the KO with his monthly billing, a "certificate of return for all badges from the cognizant office(s) before approval for payment will be considered. The replacement cost badges are as follows (NOTE: Prices are subject to change.):

Non-Proximity DPG ID Card $2.97 Proximity DPG ID Card $6.91 The above indicated replacement cost for lost items will be deducted from the Contractor's monthly billing (during the month of discovery) for item(s) not returned or lost, or the Contractor will be billed in cases where the replacement cost of lost items exceeds the amount due the Contractor. The Contractor shall be required to have security badges issued to their personnel by DPG Visitor Control Center Bldg 5910. DPG IDs shall be visible at all times while West of Access Control Point 2. The Government will be responsible for the issuance of security badges required by DoD 5220.22-R Industrial Security Regulation. Additionally, all Contractor employees shall obtain and maintain a Government issued Common Access Card prior to being granted unrestricted access authorization.

1.6.10.3 Entry Procedures to Controlled / Restricted Areas: The Contractor shall coordinate with Range Control for access to DPG Range Areas. The Contractors personnel requiring unescorted entry to restricted or other sensitive areas designated by the Installation Commander shall comply with AR 380-67 and AR 25-2.

1.6.10.4 Foreign Nationals: All foreign national personnel (including guests) require escorts on DPG. If a sensitive test or visit is scheduled during the dates provided, the COR will inform the Contractor whether the work/visit may take place. The COR will forward the list to the DPG Foreign Disclosure Officer within the Counterintelligence Office for verification. Foreign nationals will not be allowed on DPG until verification process is complete. Once verification has been received, the COR is responsible to provide the Protocol Office the following information for badge preparation:

Name Company Name Point of Contact (POC) The COR is also responsible to pick up the badges and badge holders, issue them to the visitor, and return them at the end of the visit.

Refer to paragraphs 1.6.7.3.2 and 6.7 for issuance, return, and cost associated with badges.

1.6.10.5 Reporting Requirements: The Contractor shall immediately report any known or suspected breaks or violations of security to the DPG Security and remain at the scene until authorities arrive. Additional or other conditions or situations are reportable under DoD 5220.22-M National Industrial Security Program Operating Manual Supplement. The Contractor shall comply with AR 381-12 Threat Awareness and Reporting Program (TARP). The Contractor’s personnel shall report to DPG Security, any information, or circumstances that they are aware that may pose a threat to the security of US Government, DoD, DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. The Contractor shall brief their employees of reporting requirements upon arrival to the site.

1.6.10.6 Drivers: Drivers must be appropriately licensed by the State of Utah or other appropriate jurisdiction to operate vehicles used in the performance of this contract on Federal, State of Utah, and local highway systems. Violations of law off post may result in the employee being barred from driving on the Installation or barred from the Installation. These incidents shall not relieve the Contractor from performing the functions in this contract.

1.6.10.7 Additional Security Requirements: IAW DoDM 5200.01 Information Security Program (Volumes 1 through 4), the Contractor shall comply with Army Systems Security Instruction (ASI) requirements such as Communications Security (COMSEC); COMPUSEC for Operational Systems; Security Awareness, Training, and Education (SATE) Program; and Emanations Security (TEMPEST) IAW AR 530-1. The contractor, in coordination with the AOR, shall ensure all contractor employees return photographic security identification badges and Common Access Cards/Identification Cards and all permits issued by the government at the completion of their employment. The turn of these items will be completed no later than 24 hours of their departure. In addition to any AOR contractor departing procedures, the contractor will develop and implement an employment/installation clearance procedure and checklist to ensure that an employee has turned in all badges, government property, and keys before leaving employment on the installation and access to the Local Area Network (LAN)/email has been cancelled. This checklist will contain a signature block for the ATEC Security and Intelligence Division to initial to ensure all contract employees have cleared all aspects of employment at ATEC. Security badges will be returned to the ATEC Security and Intelligence Division on the employees last day of employment with the government. If departure is after normal business hours, the AOR will collect the badge on the last day of employment and turn the badge in to ATEC Security and Intelligence Division the next business day. Keys will be returned to the issuing key custodian prior to the employee departing ATEC. In addition, contractor personnel briefed on SAPs shall contact ATEC Security personnel to complete a termination briefing prior to termination of employment. The contractor shall ensure that their departing employee has turned over all files (digitally or paper), records, hand-outs, pictures, drawings, charts, diagrams, notes, briefings, slides or any other related information or material prior to their departure to the AOR.

1.6.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.12 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.13 Key Personnel: The following personnel are considered key personnel by the government: Will be determined at a later date. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available during the regular working hours except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:

1.6.14 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.16 Information Assurance: This contract does not require a security clearance, however, strict adherence to information assurance is required, as explained in the following paragraphs.

1.6.16.1 Contract Security Classification: The Contractor is not required to establish and/or maintain any level of security clearance.

1.6.16.2 National Agency Check: All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).

1.6.16.3 Computer Usage: For activities related to this contract, controlled unclassified information (CUI) computers shall be used. No classified level computers will be used.

1.6.16.4 Access to Government Information Systems: All contractor employees with access to a government information system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter.

1.6.16.5 Information Technology Training: All contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working in IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 85700. 1-M, and AR 25-2 within six months of employment. Information Assurance/Information Technology Training Certification: Per DoD 8570.01-M, DFARS 252.239.7001, and AR 25-2, the contractor employees' supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

1.6.16.6 Information Assurance (IA) Technology Training: The Contractor is required to complete DoD IA awareness training as described in the previous paragraph (3.4.5 Information Technology Training).

1.6.16.7 Data Protection: The contractor shall ensure technical data/FOUO is protected in accordance with DODD 5230.24, AR 380-5 and DA Pam 70-3 using a contractor OPSEC plan IAW AR 530-1.

1.6.16 .8 Privacy Act: All information obtained, generated, or maintained by the contractor or their subcontractors under this contract will be the property of the U.S. government and subject to the requirements of the Privacy Act of 1974 as amended and all local, site, DISA and DOD security regulations.

1.6.16.9 Safeguarding Government Information and Property: The contractor shall be responsible for safeguarding all government information and property provided for contractor use. The contractor shall safeguard information and material designated as unclassified sensitive, For Official Use Only (FOUO), Operations Security (OPSEC) sensitive, Personally Identifiable information (PII) and Privacy Act Information in accordance with applicable directives.

1.6.16.10 Public Release of Data: No test data, reports or documents shall be released to other organizations unless authorized in writing by the Contracting Officer, through the designated ATEC/AEC Directorate, and the ATEC OPSEC Coordinator. Any information (classified or unclassified) pertaining to this contract shall not be released for public dissemination. Proposed public releases shall be submitted for approval prior to release to: Army Test and Evaluation Command, ATTN: Security Office, Dugway Proving Ground, UT 84022.

1.6.16.11 Disclosure of Information: The contractor may be required to access data and information of such a nature that its dissemination or use other than as specified would be adverse to the government's interest. The contractor or contractor employees shall not divulge, or release data or information developed or obtained under this contract except to authorize government personnel or upon written approval of the AOR. The contractor shall not use, disclose, or reproduce proprietary data that bears a restrictive legend. The contractor shall obtain written permission of the originator prior to releasing any information. Under Title 18, Sections 793 and 798, the contractor and the contractor employees are liable for any improper release. The contractor shall direct to the AOR all inquiries, comments, or complaints arising from matters observed, experienced, or learned because of, or in connection with the performance of the contract, the resolution of which may require the dissemination of official information. Inquiries the contractor receives for information relative to the Freedom of Information Act (FOIA) shall be directed to the AOR for evaluation. The government retains the authority to release or deny access to the information. The contractor shall be responsible for search and submission of records under the contractor’s control upon government request. All work including but not limited to intellectual property and data rights produced under this contract is the sole property of the government.

PART 2

Radar Sustainment Performance Standards

2.0 Specific Radar Performance Standards / Performance Work Statement(PWS): The contractor shall perform all the tasks outlined in this section to the satisfaction of the DPG Contracting Officer (KO), Contracting Officer’s Representative (COR) and the Meteorology Division technical Point of Contact (POC).

2.1 Basic Services: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the Meteorology Division FY23 Doppler Weather Radar Sustainment as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

2.1.1 Annual On-Site Calibration & Maintenance Service Visit: The contractor shall provide one maintenance and calibration site visit annually to DPG for service of the one (1) weather surveillance Doppler radar, the fixed-site C-Band. Labor and travel costs are the responsibility of the contractor. Multiple tasks, as outlined in this contract, can be accomplished during this single site visit.

AQL: 100% Compliance.

2.2.2 Additional Onsite Maintenance Service Visit: The contractor shall provide one additional onsite visit for inspection and evaluation of one (1) DPG weather surveillance Doppler radar, fixed-site C-Band. The evaluation will provide the current state of the radar systems, including testing all major components including, but not limited to, transmitter, receiver, antenna, waveguide, radar control and display software, and communications. System performance reports will be provided to the DPG KO, COR, and Meteorology Division technical POC.

AQL: 100% Compliance.

2.2.3 Standard, Remote Tech Support and Software Updates: The contractor shall provide telephone and/or email support from engineers and/or meteorologists, with response to routine inquiries not to exceed 24 hours. This contract also covers emergency services, such as response to radar outage during critical operations. In the event of a catastrophic failure of one (1) of the DPG radars, repairs must be accomplished in no more than one (1) week from the time of the initial outage. In many cases, repairs can be accomplished with no cost RMA factory priority replacement components installed by an employee of the DPG Meteorology Division, with instructions and/or procedures provided by the contractor.

The contractor shall provide no cost radar software updates to include the visualization and control system. If the contractor determines a need for a change to the current visualization and control software, the contractor shall provide an estimate of the cost of the software change to the KO, COR, and Meteorology Division technical POC. The government shall then decide if the software change is justifiable and make arrangements for purchase. Software charges not covered by this maintenance contract are not authorized. The Contracting Officer is the sole person responsible for committing the government to costs not explicitly outlined in this requirement.

AQL: 100% Compliance

2.2.3 Annual On-Site Repairs Service Visit: The contractor shall provide one annual onsite visit for repairs of one (1) DPG weather surveillance Doppler radar, fixed-site C-Band. Approval of the repairs shall be only completed with the approval of the Contracting Officer. The total cost will include but not limited to travel, shipping of equipment and tools, field work, etc.

AQL: 100% compliance

2.3 CONTRACTOR MANAGEMENT REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.

PART 3

ATTACHMENT/TECHNICAL EXHIBIT LISTING

3.0 Attachment/Technical Exhibit List:

3.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard
Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

Annual On-Site Calibration & Maintenance Service Visit
The contractor shall provide one maintenance and calibration site visit annually to DPG for service of the one (1) weather surveillance Doppler radar, the fixed-site C-Band. Labor and travel costs are the responsibility of the contractor. Multiple tasks, as outlined in this contract, can be accomplished during this single site visit.
100% Compliance
100% Compliance
Additional On-Site Maintenance Service Visit
The contractor shall provide one additional onsite visit for inspection and evaluation of one (1) DPG weather surveillance Doppler radar, fixed-site C-Band. The evaluation will provide the current state of the radar systems, including testing all major components including, but not limited to, transmitter, receiver, antenna, waveguide, radar control and display software, and communications. System performance reports will be provided to the DPG KO, COR, and Meteorology Division technical POC.
100% Compliance
100% Compliance
Standard, Remote Tech Support and Software Updates
The contractor shall provide telephone and/or email support from engineers and/or meteorologists, with response to routine inquiries not to exceed 24 hours. This contract also covers emergency services, such as response to radar outage during critical operations. In the event of a catastrophic failure of one (1) of the DPG radars, repairs must be accomplished in no more than one (1) week from the time of the initial outage. In many cases, repairs can be accomplished with no cost RMA factory priority replacement components installed by an employee of the DPG Meteorology Division, with instructions and/or procedures provided by the contractor. The contractor shall provide no cost radar software updates to include the visualization and control system. If the contractor determines a need for a change to the current visualization and control software, the contractor shall provide an estimate of the cost of the software change to the KO, COR, and Meteorology Division technical POC. The government shall then decide if the software change is justifiable and make arrangements for purchase. Software charges not covered by this maintenance contract are not authorized. The Contracting Officer is the sole person responsible for committing the government to costs not explicitly outlined in this requirement.
100% Compliance
100% Compliance
2.2.3 Annual On-Site Repairs Service Visit
The contractor shall provide one annual onsite visit for repairs of one (1) DPG weather surveillance Doppler radar, fixed-site C-Band. Approval of the repairs shall be only completed with the approval of the Contracting Officer. The total cost will include but not limited to travel, shipping of equipment and tools, field work, etc.
100% Compliance
100% Compliance

PART 4

DEFINITIONS & ACRONYMS

4 DEFINITIONS AND ACRONYMS:

4.1 DEFINITIONS:

4.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

4.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

4.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

4.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

4.1.5 DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

4.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

4.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

4.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

4.1.9 QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

4.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

4.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

4.1.12 WORKDAY. The number of hours per day the Contractor provides services in accordance with the contract.

4.1.12 WORK WEEK. Monday through Friday, unless specified otherwise.

4.2 ACRONYMS:

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
ARArmy Regulation
CCEContracting Center of Excellence
CFRCode of Federal Regulations
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTRContracting Officer's Technical Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DD250Department of Defense Form 250 (Receiving Report)
DD254Department of Defense Contract Security Requirement List
DFARSDefense Federal Acquisition Regulation Supplement
DMDCDefense Manpower Data Center
DODDepartment of Defense
DPGDugway Proving Ground
EECEnterprise Electronics Corporation
FARFederal Acquisition Regulation
HIPAAHealth Insurance Portability and Accountability Act of 1996
KOContracting Officer
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
PIPOPhase In/Phase Out
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
TETechnical Exhibit

File details come from the government source that posted it. Updated .