PWS - C-5 CAC Enabled Door Locks 16Oct2024.pdf
PDF 253 KB Posted
- Attached to
- CAC Enabled Door Locks
- Solicitation number
- FA8501_CAC_Enabled_Door_Locks
About this file
This Performance Work Statement (PWS) details a contract for installing CAC-enabled door lock solutions at Building 300, West Wing, Bay A and Bay B at Robins Air Force Base in Georgia. The project requires engineering, furnishing, installing, and testing door lock systems for two specific areas: Bay A with double glass doors for the C-5 front office, and Bay B with 4 interior and 3 exterior doors. The standalone systems will support a minimum of 350 users, include local caching, emergency access for building managers, and operate without WiFi, Bluetooth, or wireless connections.
Key technical requirements include using CAT6A cabling, metal conduit for signal conductors, vandal-resistant equipment enclosures, and electrical power extensions compliant with National Electric Code standards. The contractor must provide a comprehensive installation design package within 30 days of contract award, conduct on-site surveys, perform contractor verification testing, and offer a 3-year warranty. Additional obligations include providing technical support, software updates, system administrator training, and maintaining strict base security protocols. The project requires careful coordination with base personnel, with work to be performed between 7:30 AM and 4:30 PM, Monday through Friday, excluding federal holidays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Atch 1 (1 of 11)
CUI
PERFORMANCE OF WORK STATEMENT (PWS)
FOR
Bldg 300, West Wing, Bay A and Bay B
CAC-enabled Door Lock
Contract/PR Number: XXXX-XX-X
Date Prepared: 16 October 2024
Prepared by:
AFLCMC/WLS (C-5) SPO
DESTRUCTION NOTICE. Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Controlled by: AFLCMC Controlled by: C-5M Super Galaxy Division CUI Category: CUI Basic Distribution/Dissemination Controls: FEDCON POC: Joshua Morris, Joshua.morris.30@us.af.mil mailto:Joshua.morris.30@us.af.mil
Atch 1 (2 of 11)
Table of Contents
1.0 Scope……………………………………………………………………………………
1.0 General……………………………………………………………………………. 3
1.1 Project Description……………………………………………………………….. 3
1.2 Location…………………………………………………………………………... 4
1.3 Working Conditions……………………………………………………………
1.4 Utility Outages and Special Conditions………………………………………….. 4
2.0 Products…………………………………………………………………………………… 4
2.1 Contractor Provided Materials (CPM) and Performance Features………………. 5
2.2 Installation………………………………………………………………………... 5
2.3 System Maintenance……………………………………………………………... 6
2.4 Special Requirements…………………………………………………………….. 7
2.5 Security Requirements…………………………………………………………… 7
3.0 Contract Requirements……………………………………………………………………. 9
3.1 Completion of Work and Training……………………………………………….. 9
3.2 As-Built Technical Exhibits……………………………………………………… 9
4.0 Scheduled Service Interruptions…………………………………………………………... 9
5.0 Contract Data Requirements Lists (CDRL) Table………………………………………... 10
6.0 References………………………………………………………………………………… 10
Atch 1 (3 of 11)
1.0 SCOPE
1.0 GENERAL:
1.0.1 The work to be performed in accordance with this Performance of Work Statement (PWS) shall consist of furnishing all necessary plant, electrical connections, conduit and associated hardware, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work prescribed in this performance of work statement, in accordance with all applicable building codes, regulations, standards, and criteria in effect at the date of solicitation.
1.0.2 This work shall consist of, but not be limited to the following:
a. Engineer, Furnish, Install, and Test (EFIT) all components for a new CAC-enabled door lock
Solution (Building 300 WW) at Robins AFB GA, in accordance with the specifications contained herein, including referenced publications.
1.0.3 Government Points of Contact (POC)
POC Email Phone Primary: Joshua Morris Joshua.morris.30@us.af.mil 478-731-8644 Alternate: Jennifer Bridges Jennifer.bridges.2@us.af.mil 478-472-3259
1.1 PROJECT DESCRIPTION:
1.1.1 Building 300, West Wing, Bay A CAC-enabled door lock Solution:
a. Interior - Double glass doors for C-5 front office
b. Local cache (off-network)
c. Permit common access for minimum of 350 users in addition to emergency access for building managers and emergency response personnel
d. Locally managed, no subscription / service associated with operations
e. All network and power cabling used to install CAC-enabled door lock.
1.1.2 Building 300, West Wing, Bay B CAC-enabled door lock Solution:
a. 4 interior doors & 3 exterior doors
b. Local cache (off-network)
c. Permit common access for minimum of 350 users in addition to emergency access for building managers and emergency response personnel
d. Locally managed, no subscription / service associated with operations
e. All network and power cabling used to install CAC-enabled door lock.
1.1.3 The Contractor shall develop a solution for CAC-enabled door lock placement and establish efficient cable pathways from the designated equipment sections to the locations placed for building. The solution should also incorporate the system equipment/items and cover the areas described in this section.
1.1.4 Building 300. Includes the following:
West Wing, Bay A – Interior Corridor (Double glass doors for C-5 front office) West Wing, Bay B – Interior Corridor (4 doors) West Wing, Bay B – Exterior Corridor (3 doors) mailto:Joshua.morris.30@us.af.mil mailto:Jennifer.bridges.2@us.af.mil
Atch 1 (4 of 11)
1.1.5 The proposed System will be a standalone and does not require additional USAF certifications. The systems will not contain WiFi, Bluetooth, or other wireless connections.
1.2 LOCATION: Building 300, West Wing, Bay A and Bay B
1.3 WORKING CONDITIONS:
1.3.1 The contractor shall schedule all work to commence between the hours of 7:30 AM and 4:30 PM, Monday through Friday, except on the Federal holidays and days designated as “Family Days” by Air Force Material Command (AFMC) as listed below. Permission to work outside these normal business hours may be granted by the Contracting Officer. Requests to work outside the normal work hours must be submitted in writing to the Contracting Officer at least 3 working days in advance of the date requested. While AFMC Family Days have not been identified past calendar year 2024 it is anticipated that the same number of AFMC Family days will be declared each year.
1.3.2 Any Holiday falling on a Saturday will be observed the preceding Friday. Any Holiday falling on a Sunday will be observed the following Monday.
1.3.3 The base could be closed because of security problems, adverse weather, or other events.
Unless otherwise notified by the Government, the Contractor should monitor local television stations, radio stations, or Robins’ Facebook page for notification of a possible base closure or late opening. The Contractor may not receive any other form of notification of a base closure from the Government, unless contacted by the Contracting Officer. The Contractor is responsible for notifying his/her employees. The Contractors do not report when the base is closed.
1.3.4 All disruptions/disturbances due to all proposed work must be minimized in order to ensure the continued ongoing/day to day training mission remains operational.
1.4 UTILITY OUTAGES AND SPECIAL CONDITIONS:
1.4.1 BASE CIVIL ENGINEER WORK REQUEST (DIGGING PERMIT): Any necessary trenching requirement will be procured and accomplished by the Contractor. The Contractor shall obtain and process AF Form 103 for approval prior to commencement of work for this project. Due to the requirement for multiple agencies to coordinate on digging permit requests, it takes approximately 7 days for processing of the paperwork. Contractor requests should be submitted at the earliest possible date to preclude delays.
1.4.2 UTILITY OUTAGES: When a utility outage is necessary to perform the contract work in an occupied facility, regardless of whether the work area is occupied, the outage shall be performed by the Contractor during non-duty hours at no additional cost to the Government, unless otherwise approved by the Contracting Officer. The Contractor shall notify 78th Civil Engineer Squadron (CES) Service Call (478-926-5657) and the 78th Communication Squadron help desk (478-926-4357) of outage requirements to include buildings affected; length of outage; and reasons for the outage. The Contractor shall allow affected occupants a minimum of seven (7) calendar days’ notice prior to outage. The Contractor is also required to provide the Contracting Officer a written notification of the requested outage.
2.0 PRODUCTS:
Atch 1 (5 of 11)
2.1 CONTRACTOR PROVIDED MATERIALS (CPM) AND PERFORMANCE FEATURES:
2.1.1 The Contractor shall Engineer, Furnish, Install, and Test (EFIT) all CAC-enabled door lock solutions and supporting or ancillary components, including all systems, necessary sub-systems, and infrastructure components. Contractor shall also provide storage space/staging area for materials and operating space for the installer or installation team. No Government provided storage is available.
2.1.2 All equipment rack enclosures installed inside each building shall be vandal-resistant, locking enclosures.
2.1.3 All signal conductors outside component enclosures shall be enclosed in metal conduit coated for corrosion resistance. Electrical Power cable from the Control Unit Head and the equipment Cabinet to their respective junction boxes shall be in outdoor conduit with water and corrosion resistant coatings. Conduits shall be routed so that they are concealed within walls or ceilings when possible. Flexible conduit will only be permitted where rigid conduit cannot be installed.
2.1.4 ELECTRICAL POWER: Contractor shall provide electric power to all locations. Work shall include circuit breakers, conductors, conduit, conduit fittings, enclosures, surge protection, converters, receptacles and all other materials, devices and equipment required to extend electric power from an existing breaker panel located within the building location. All work shall comply with the latest edition of the National Electric Code and power requirements as specified by manufacturer.
Conductors shall be stranded copper with Thermoplastic High Heat-resistant Nylon-coated (THHN) insulation. All conduit connectors, exterior enclosures and receptacles shall be weather-tight. Exposed conduit shall be painted as required to blend into the architectural features of the building. All components including mounting hardware exposed on the exterior of the building shall be watertight and corrosion resistant. Conductors will be a minimum of #12 AWG. All exposed components including mounting hardware, boxes, and connectors shall be painted as required to blend into the architectural features of the building.
2.2 INSTALLATION:
2.2.1 The Contractor shall conduct an Engineering on-site survey of building listed under this PWS to obtain all information necessary for the requirements according to commercial and government standards to include drawings and Test Plan. The Contractor shall submit the proposed design package for approval before starting the installation. A design package shall be submitted within 30 days following award of the contract. The Contractor shall make all revisions to the proposal until government (Contracting Officer) approval is obtained. (CDRL A002, Installation Design Package, DI-FACR-82278)
2.2.1.1 The Contractor shall deliver the status report with a distribution statement of “D”. Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only.
2.2.1.2 Each submittal shall be delivered electronically to the Government via LMA EDCS. The contractor shall provide the email letter of transmittal with a hyper link of the LMA EDCS digital environment/media location of the data on the EDCS for Government approved format for final submittal.
2.2.2 All components and installation required for extension of electrical power to locations shall be provided by Contractor in accordance with the latest edition of the National Electric Code. Contractor shall submit route for electric power extension to Contracting Officer for approval prior to installation.
Atch 1 (6 of 11)
Contractor shall submit a list of all components to be utilized in the extension of electric power, complete with manufacturer’s data to the Contracting Officer for approval prior to acquisition.
Electronic files of as-built drawings for the buildings will be provided by the Government to the Contractor for determining routing of electrical conduit. Any cable unable to be concealed above ceilings or in walls shall be installed in rigid conduit unless otherwise specified. No penetrations shall be made through roofs, building super structure members, such as columns, beams and or joists. All penetrations in walls and ceilings are to be sealed with approved fire rated sealants.
2.2.3 Contractor shall furnish, install, and terminate all wiring end-to-end from the control box to the end equipment. All wire, cable and conduit installed in Plenum areas shall be plenum rated per the National Fire Protection Association (NFPA) Publication 72, “National Electrical Code Standard.”
2.2.4 Contractor shall provide necessary cabling to support CAC-enabled Door Locks as described in this PWS; CAT6A is the minimum cabling requirement.
2.2.5 Contractor shall furnish and install switches suitable for traffic at designated buildings where it is necessary and IAW this PWS.
2.2.6 Contractor shall perform a Contractor Verification Test (CVT) immediately upon completion of building. Both the contractor and Requiring Activity shall witness this test. The test shall be performed per the written testing procedures. Existing equipment/system found to be inoperative during the test or at any time during the installation period shall be brought to the attention of the Contracting Officer in the form of an immediate email and a monthly progress report or in person on site. All deficient work shall be corrected by the contractor. (CDRL A001, Status Report, DI-
MGMT-80368A)
2.2.6.1 The Contractor shall deliver the status report with a distribution statement of “D”. Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only.
2.2.6.2 Each submittal shall be delivered electronically to the Government via LMA EDCS. The contractor shall provide the email letter of transmittal with a hyper link of the LMA EDCS digital environment/media location of the data on the EDCS for Government approved format for final submittal.
2.2.7 As-built drawings and wiring diagrams will be completed and submitted to the Contracting Officer as soon as feasible, but not later than prior to final payment. All hardcopy contractor engineered site-specific design specifications and install drawings will be collected into a system information binder. Per USAF guidance, completion of the install will be annotated on an AFTO 747, Communications and Information Systems Certification, to signify completion of the project and acceptance of the installed system by the user, it has been tested and accepted as installed, and all noted exceptions are corrected by the responsible party to the satisfaction of the signee.
2.2.8 Product data sheets. All hardcopy Commercial Off the Shelf (COTS) supplied equipment literature (manuals, warranties, etc.) shall be collected into a system information binder. All softcopy product data sheets shall be submitted in PDF format.
2.2.10 Monthly progress report. A report shall be generated and submitted monthly to the Contracting Office detailing the progress of the installation by the 15th day of each month. (CDRL A001, Status Report, DI-MGMT-80368A)
Atch 1 (7 of 11)
2.2.10.1 The Contractor shall deliver the status report with a distribution statement of “D”. Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only.
2.2.10.2 Each submittal shall be delivered electronically to the Government via LMA EDCS. The contractor shall provide the email letter of transmittal with a hyper link of the LMA EDCS digital environment/media location of the data on the EDCS for Government approved format for final submittal.
2.2.11 Contractor verification test reports. A report shall be generated and submitted monthly detailing the results of each CVT performed on completed facilities. These reports shall be submitted with the monthly progress reports. (CDRL A001, Status Report, DI-MGMT-80368A)
2.2.11.1 The Contractor shall deliver the status report with a distribution statement of “D”.
Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only.
2.2.11.2 Each submittal shall be delivered electronically to the Government via LMA EDCS. The contractor shall provide the email letter of transmittal with a hyper link of the LMA EDCS digital environment/media location of the data on the EDCS for Government approved format for final submittal.
2.2.12 Due to product lead times, scheduling and installation resources, installation of the above equipment cannot take place prior to 30 days after award and approval of the contract.
2.3 SYSTEM MAINTENANCE:
2.3.1 Contractor shall provide Technical Support to assist during outages and/or maintenance during warranty period. System support may be provided over the phone or on-site assistance, depending on issue severity.
2.3.2 Software Updates. Contractor shall provide software updates for one year to the system administrator for any software supporting this network.
2.3.3 Replacements of damaged and/or faulty parts may be shipped standard air freight.
2.3.4 Warranty work shall be performed by the contractor as needed during the warranty period. The warranty period shall cover 3 years from the date of government acceptance.
2.3.5 Maintenance shall be scheduled in advance with the base. The contractor shall schedule all work to commence between the hours of 7:30 AM and 4:30 PM, Monday through Friday, except on the Federal holidays and days designated as “Family Days” by Air Force Material Command (AFMC) as listed above. Permission to work outside these normal business hours may be granted by the Contracting Officer. Requests to work outside the normal work hours must be submitted in writing to the Contracting Officer at least 3 working days in advance of the date requested.
Contractor personnel shall be granted reasonable access to all equipment during these hours for the purpose of providing maintenance service and shall be accompanied by the owning, using organization.
2.3.6 Government system owners shall be trained by the contractor to perform initial troubleshooting, response, and scheduled/unscheduled maintenance procedures; to include replacement, adjustment, and configuration of system components. (CDRL A003, Training Materials, DI-ILSS-80872)
Atch 1 (8 of 11)
2.3.6.1 The Contractor shall deliver the status report with a distribution statement of “D”.
Distribution authorized to the Department of Defense (DoD) and U.S. DoD Contractors only.
2.3.6.2 Each submittal shall be delivered electronically to the Government via LMA EDCS. The contractor shall provide the email letter of transmittal with a hyper link of the LMA EDCS digital environment/media location of the data on the EDCS for Government approved format for final submittal.
2.3.7 Contractor shall identify response rules with the government for any maintenance that can’t be completed by the government technicians while the system is covered under warranty.
2.4 SPECIAL REQUIREMENTS:
2.4.1 All wiring connections shall be secured using standard security connectors that meet standard fire codes for security systems. All shielded wiring must be clearly identified and labeled upon install.
Five sets of Schematic Visio diagrams of the network annotated with labeled cable and equipment identifications will be provided to the Contracting Officer.
2.4.2 During the installation, upon a discovery of any communication problems the contractor shall notify the contracting officer as soon as possible with proposed corrective action.
2.4.3 The contractor shall assign employees who possess certifications to handle all required material handling, transportation, loading, unloading and product installation tasks to meet the Occupational Safety and Health Administration (OSHA), base safety requirements and annunciator certification standards. The contractor shall ensure product meets required safety standards at the time the project is finished and accepted by the customer. Contractor shall provide the standard commercial product warranty certificate specifying warranty period for the system.
2.4.4 All Contractor personnel will be OSHA confined space qualified prior to working within manholes or similar confined spaces on the installation.
2.4.5 All wires that shall be exposed or not run through drop ceilings shall be routed through Electrical Metal Tubing (EMT) conduit. If cabling is run through the drop ceiling it must be plenum rated.
2.4.6 All exposed wiring, conduits, boxes, accessories etc. outside the building shall be suitable for weather tight construction fully meeting the Industry Standards and National Electric Code (NEC), latest edition.
2.5 SECURITY REQUIREMENTS:
2.5.1 The contractors shall comply at all times with base security requirements to include base pass requirements and personnel security clearance.
2.5.2 Before arrival, the contractor shall email Joshua Morris (joshua.morris.30@us.af.mil) and Jennifer Bridges (jennifer.bridges.2@us.af.mil) a visit authorization letter for Base Contracting listing the name, date of birth and place of birth of the individuals who shall be working on the base. Contractor shall be responsible for obtaining written permission/signature from each person’s name submitted for a background check to be completed. Background checks will be completed by AFLCMC/WLS (C-5) Marvin Mann mailto:joshua.morris.30@us.af.mil mailto:jennifer.bridges.2@us.af.mil
Atch 1 (9 of 11)
(marvin.mann.1.ctr@us.af.mil). If a background check cannot be completed, entry onto the installation cannot be granted. The Contractor shall obtain base access passes to be used on Robins AFB (RAFB) during the performance period. Please email Joshua Morris to coordinate where to gather if you need base access. Any workers not cleared will be identified, and not permitted to work on RAFB. The required information Joshua Morris will need to grant base access is below for security screening:
Last Name:
First Name:
Last 4 SSN:
Birthdate:
Driver’s License Number:
State Driver’s License was issued from:
2.5.3 Traffic Laws. Contractor and employees shall comply with base traffic regulations.
2.5.4 Weapons, Firearms, Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within their contractor-owned vehicle or privately-owned vehicles while on base.
2.5.5 Physical Security. The contractor shall be responsible for safeguarding all government property, and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
2.5.6 OPERATIONS SECURITY (OPSEC) REQUIREMENTS: The purpose of OPSEC is to reduce the vulnerability of Air Force missions by eliminating or reducing successful adversary collection and exploitation of critical or sensitive information. OPSEC applies to all activities that prepare, sustain, or employ forces during all phases of operations. OPSEC is a process of identifying, analyzing and controlling critical and sensitive information indicating friendly actions associated with military operations and other activities to: 1) identify those actions that can be observed by adversary intelligence systems; 2) determine what specific indications could be collected, analyzed, and interpreted to derive critical or sensitive information in time to be useful to adversaries; 3) select and execute measures that eliminate or reduce to an acceptable level the vulnerabilities of friendly actions to adversary exploitation. Organizations and personnel supporting the 78th Air Wing have OPSEC requirements associated with their activities and support. The contractor will comply with the 78th Air Wing OPSEC Program and the 78 CES OPSEC Program. The basis for the OPSEC program is AFI 10-701.
2.5.7 TOBACCO USE IN AFMC FACILITIES: Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AFMC facilities. AFI 40-102, Tobacco Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities.
Contractor employees and visitors are subject to the same restrictions as government personnel.
Smoking is permitted only in designated smoking areas. Additional information, to include locations of designated smoking areas, will be provided to the contractor at the pre-performance conference.
2.5.8 UTILITY CONSERVATION: The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor. Long distance and Defense Switched Network (DSN) telephone services will not be provided.
3.0 CONTRACT REQUIREMENTS:
mailto:marvin.mann.1.ctr@us.af.mil
Atch 1 (10 of 11)
3.1 COMPLETION OF WORK AND TRAINING:
3.1.1 78th Contracting Squadron shall perform Acceptance inspection/testing via AFTO 747, Communications and Information Systems Certification.
3.1.2 Contractor shall demonstrate and conduct onsite training in conjunction with installation for operational use of the CAC-enabled door lock. Contractor shall provide training and training materials to include books and training media (slide shows etc.). The contractor shall provide training on the addition/removal of organizational personnel. The government shall provide space and resources for classroom atmosphere. The training shall include the CAC-enabled door lock operation process, system programming options, and other system administration duties.
3.1.3 Contractor shall furnish initial system administrator training on the system to configure the equipment for site-specific conditions and allow minor maintenance and troubleshooting with onsite training. This shall include recording and transferring data to PDF format.
3.1.4 Contractor shall furnish COTS operator/maintenance/installation manuals for all installed systems and terminal end devices. All hardcopy COTS supplied equipment literature will be collected into a system information binder.
3.1.5 Contractor shall furnish administrator and operator training of equipment use and programming functions. Contractor shall furnish hands-on maintenance training, and upgrade capabilities for the CAC-enabled door lock as a whole.
3.1.6 Contractor shall also take all steps necessary to facilitate full certification and accreditation for the system; this cost shall be included in the price of the contract.
3.1.7 Software Updates. Contractor shall provide software updates for the system software in accordance with the original purchased configuration.
3.2 AS-BUILT TECHINCAL EXHIBITS, Contractor shall provide as-built Technical Exhibits on a single in PDF format for Government approval. Quality reproducible as-built schematic drawings (wiring, layout, rack-face, etc.) will be provided in PDF format for Government approval.
4.0 SCHEDULED SERVICE INTERRUPTIONS:
4.1 The CAC-enabled door lock shall be operational 24-hours-per-day, 7-days-per-week, and 365-days-a-year. When the contractor shall schedule an interruption, the work shall be done at a time that causes the least inconvenience for AFLCMC/WLS personnel. The contractor shall notify and obtain approval from the 78 CONS, 78 CS, and the WLS Building Manager one (1) Working day in advance of any scheduled interruption. The contractor shall specify the starting time and duration of the interruption.
The contractor shall provide verbal notification to the WLS and Contracting Officer and 78 CS immediately after service has been restored. Equipment evaluation shall be conducted prior to contractor departure.
5.0 CONTRACT DATA REQUIREMENTS LIST(S) (CDRL)
Data Item
DID Title PWS Reference(s)
A001 DI-MGMT-80368A Status Report 2.2.6, 2.2.10, 2.2.11
Atch 1 (11 of 11)
A002 DI-FACR-82278 Installation Design Package 2.2.1 A003 DI-ILSS-80872 Training Materials 2.3.6
6.0 REFERENCES, This is not a comprehensive or exclusive list. When any of these publications is superseded, the most current version on the day of solicitation shall prevail.
• TRADOC Regulation 350-6 C1 “Training Enlisted Initial Entry Training Policies and
Administration,” 30 January 2018.
• DoD 5200.08-R, “Physical Security Program,” April 9, 2007
• USAF Force Protection Command and Control Systems Program Office (ESC/FD), “Integrated Base Defense Security Systems (IBDSS) Capability Document.”
• USAF ESE-SIT-00001, “Standardized Electronic Security Equipment; Siting and Design
Guidance for Permanent Installations.”
• USACE Unified Facilities Criteria (UFC), UFC 4-020-04FA, “Electronic Security Systems:
Security Engineering.”
• AFI 31-101, “Air Force Physical Security Program.”
• “U.S. Air Force Entry Control Facilities Design Guide,” 18 February 2003.
• MIL-HDBK-1013/10. “Military Handbook Design Guidelines for Security Fencing, Gates, Barriers, and Gu a r d Facilities,” 14 May 1993.
• “Security Equipment and Resources Guide,” DOD Physical Security Equipment Action Group
(PSEAG).
• TM 5-853-2/AFMAN 32-1071 Vol. 2. “Security Engineering Concept Design,” 12 May 1994.
• TM 5-853 Vol 4, “Security Engineering, Electronic Security Systems,” 12 May 1994
• UFC 4-010-01. “DoD Minimum Antiterrorism Standards for Buildings,” 8 October 2003.
• UFC 4-010-02. “DoD Minimum Antiterrorism Standoff Distances for Buildings,” 8 October 2003.
• UFC 4-022-01. “Security Engineering: Entry Control Facilities/ Access Control Points,” 25 May 2005.
• UG-2031-SHR. “User’s Guide on Protection against Terrorist Vehicle Bombs,” May 1998.
• HSPD-12 Directive, “Policy for a Common Identification Standard for Federal
Employees and Contractors,” 27 Aug 2004.
• DHS-M-05-04, “Implementation of HSPD-12,” 5 Aug. 2005.
• NIST FIPS-201, “Personal Identify Verification (PIV) of Federal Employees and Contractors,” Mar
2006.
• NIST Special Publication 800-59, “Guideline for Identifying an Information System as a National
Security Systems ,” Aug 2003.
• NIST Special Publication 800-73, “Information Security: Interfaces for Personal Identity
Verification,” March 2006.
• NIST Special Publication 800-76, “Information Security: Codes for the Identification of
Federal and Federally Assisted Organizations,” March 2007.
• EIA ANSI/TIA/EIA-568-A, “Commercial Building Telecommunications Cabling Standard.”
• EIA ANSI/TIA/EIA-569-A, “Commercial Building Standard for Telecommunications
Pathways and Spaces.”
• EIA ANSI/TIA/EIA-606, “Administration Standard for the Telecommunications
Infrastructure of Commercial Buildings.”
• EIA ANSI/TIA/EIA-607, “Commercial Building Grounding and Bonding
Requirements for Telecommunications.”
• EIA TIA/EIA-TSB-67, “Transmission Performance Specifications for Field Testing of
Unshielded Twisted-Pair Cabling Systems.”
• IBM GA27-3773-0, “Cabling System Technical Interface Specifications.”
• ICEA S-83-596, “Fiber Optic Premises Distribution Cable.”
• ICEA S-102-700, “Category 6 Individually Unshielded Twisted Pair Indoor Cable for Use in
Atch 1 (12 of 11)
General Purpose and LAN Communications Wiring Systems.”
• NFPA 70, “National Electrical Code (NEC).”
• NFPA 72, “National Fire Alarm Code.”
• NFPA 101, “Life Safety Code.”
• UNDERWRITERS LABORATORIES (UL), UL 50, “Enclosures for Electrical Equipment.”
• UL 2050, “National Industrial Security Systems Program.”
• UFC 3-580-01, Telecommunications Interior Infrastructure Planning and Design (Ch. 1 & 2)
• ANSI/TIA/EIA-758, Customer Owned Outside Plant Telecommunications Cabling Standard (If running cabling between buildings)
| 1.1 PROJECT DESCRIPTION: |
| 1.1.2 Building 300, West Wing, Bay B CAC-enabled door lock Solution: |
| 1.1.3 The Contractor shall develop a solution for CAC-enabled door lock placement and establish efficient cable pathways from the designated equipment sections to the locations placed for building. The solution should also incorporate the... |
| 1.1.4 Building 300. Includes the following: |
| 1.1.5 The proposed System will be a standalone and does not require additional USAF certifications. The systems will not contain WiFi, Bluetooth, or other wireless connections. |
| 1.4 UTILITY OUTAGES AND SPECIAL CONDITIONS: |
| 2.0 PRODUCTS: |
| 2.2 INSTALLATION: |
| 2.3 SYSTEM MAINTENANCE: |
| 3.0 CONTRACT REQUIREMENTS: |
| 4.0 SCHEDULED SERVICE INTERRUPTIONS: |