PWS_C-207 Videoconference_Final.pdf

PDF 161 KB Posted

Attached to
Notice of Intent to Sole Source for AKARNG C-207 SIPR Connections
Solicitation number
W91ZRU26PA004
Issued by

About this file

This is a Performance Work Statement (PWS) for videoconferencing services at Building 49000, Room C-207 for the Alaska National Guard (AKNG). The contractor must install and program videoconferencing equipment to enable secure SIPR videoconferencing capabilities within a 180-day period of performance. Services shall be provided Monday through Friday, 0730-1630 hours, excluding recognized U.S. federal holidays, with contractor personnel maintaining adequate workforce continuity. The contractor is not permitted to telework except during Continuity of Operations Planning emergencies at no additional cost to the Government.

The contractor must furnish all personnel, equipment, tools, materials, supervision, and quality control except for Government-provided installation and programming of audio/visual switches. Key technical requirements include: installing a Vaddio EasyIP Mixer at the workstation location with connectivity to existing Vaddio camera and Biamp audio processor; providing HDMI connectivity for Government laptop dock with digital HDMI twisted pair transmitter/receiver to an Extron video switcher; installing an Extron NBP 50 button panel for source selection and volume control; and ensuring all wiring and mounting hardware meet manufacturer specifications. The contractor must also provide one one-hour end-user training session within 30 days of system acceptance. Security and compliance requirements include AT Level 1 awareness training, iWATCH training, OPSEC training, and compliance with installation security policies and procedures within 30 calendar days of contract start and for all new employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

Building 49000, C-207 Videoconference Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform installation of videoconferencing equipment and programing Services, as defined in this PWS.

1.1.1 Objectives

1.2 Background: The AKNG lacks the ability to conduct SIPR (secure) videoconferencing capabilities to participate and host secure videoconferences and briefings. This conference room has existing equipment requiring additional programming and hardware to gain this capability.

1.3 Period of Performance (PoP): The Period of Performance shall be 180 days.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0830-1630 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Building 49000, Room C-207 (Conference Room).

The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1630 on Monday through Friday, except on recognized US holidays. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): Not Applicable.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 Not Applicable

1.4.5.2 Not Applicable

1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website:

https://jko.jten.mil/courses/atl1/launch.html.

1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations https://jko.jten.mil/courses/atl1/launch.html concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Not Applicable

1.4.5.7 Not Applicable

1.4.5.8 Not Applicable

1.4.5.9 Not Applicable.

1.4.5.10 Not Applicable

1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.

1.4.5.12 Not Applicable

1.4.5.13 Not Applicable

1.4.5.14 Not Applicable

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Key Control. Not Applicable

1.4.6.2 Lock Combinations: Not Applicable

1.4.7 Special Qualifications: Not Applicable

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): Not Applicable

1.4.10 Identification of Contractor Employees: Not Applicable

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Contractor Travel Not Applicable

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Phase In / Phase Out Periods Not Applicable

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation

GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: Not Applicable

3.2 Materials: Not Applicable

3.3 Equipment: Not Applicable

3.4 Services: Installation and programming of audio and visual switches and equipment

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Secret Facility Clearance: Not Applicable

4.3 Contractor Security Clearance: Not Applicable

5.0 Requirements: The contractor shall:

5.1 This section defines the materials to be provided and services to be performed for the proposed system.

5.1.1 Display System and Connectivity

The existing display system consists of a Planar MGP 1.2mm LED video wall and two

(2) large format LCD displays. The configuration and function of this system shall remain unchanged with the exception of the added connectivity listed below.

1. The Contractor shall provide connectivity for the following AV sources:

a. Workstation location

i. One (1) HDMI Male – Laptop dock (Government provided) *

ii. One (1) USB A Male – USB connectivity from Government provided Vaddio EasyIP Mixer dedicated to laptop dock for room peripherals i.e.

camera and microphones

iii. One (1) RJ45 Male – network connection for newly installed Extron network button panel (connected to AV network)

* To reduce signal loss, the Contractor shall provide a digital HDMI twisted pair transmitter and receiver between the laptop dock and a designated Extron video switcher.

2. Signaling Components

The Contractor shall install one (1) Government provided Vaddio EasyIP Mixer at the workstation location.

The EasyIP Mixer shall provide connectivity to the existing Vaddio camera and Biamp audio digital signal processor.

3. The Contractor shall provide for the adjustment, alignment, and functional testing of the system.

5.2 Audio System

The existing audio system consists of a distributed audio system, ceiling-mounted Audix microphones, and a Biamp audio digital signal processor. The configuration and function of this system shall remain unchanged with the exception of adding connectivity for the new laptop dock for presentation and conferencing purposes.

5.3 Conference System

The existing conferencing system consists of a Vaddio pan/tilt/zoom camera and the audio system components mentioned above. The Contractor shall install one (1) additional Government provided Vaddio EasyIP Mixer to provide connectivity for the room peripherals for the SIPR computer. The software installed on the Government’s computer (Microsoft Teams, Zoom, etc.) shall provide control for all conferencing capabilities.

5.4 Control System

The existing control system is comprised of an Extron IPCP Pro control processor and an Extron button panel. The Contractor shall provide and install one (1) Extron NBP 50mbutton panel at the workstation location and it shall provide for the following features:

1) SIPR laptop dock source selection

2) Volume control The existing Vaddio handheld remote shall provide control for the existing camera.

5.5 Additional Components

The Contractor shall provide all necessary wiring and mounting hardware.

5.6 Training

End user training shall consist of one (1) one-hour session to be completed within thirty

(30) days of the final acceptance of the system at the Government’s location.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publicatio n

Mandator y or

Advisory

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/c urrent/index.html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/trave lreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/201

(Change 1:

07/28/202 0) http://www.esd.whs.mil/Directives/issuance s/dodm

Federal Information Processing Standards (FIPS) Publication

201-2

August http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.

FIPS.201-2.pdf https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9)

DoDM 5200.2 Procedures for the DoD Personnel Security

Program (PSP)

04/03/201 https://www.esd.whs.mil/Directives/issuanc es/dodm/

DoDI 5200.46

DoD Investigative and Adjudicative Guidance for

Issuing the Common Access Card (CAC)

09/09/14 (Change

1:

05/04/201

8) es/dodi/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common

Identification Standard for Federal Employees and

Contractors

08/27/200 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs

01/29/201 es/dodi/

DoD 5400.11-R

Department of Defense Privacy Program

05/14/200

DoDD 8140.01

Cyberspace Workforce Management

10/05/202 es/dodd/

DoD 8570.01-M

Information Assurance Workforce Improvement

Program

12/19/200 5 (Change

4:

11/10/201

5)

DoD 5220.22-M National Industrial Security Program Operating Manual

(NISPOM)

02/28/200

(Change 2:

05/18/201 6)

Army Directive 2014-05 Policy and Implementation Procedures for Common

Access Card Credentialing and Installation Access for Uncleared Contractors

03/07/201 https://armypubs.army.mil/ProductMaps/Pu bForm/ArmyDir.aspx

AR 25-2

Information Assurance

04/04/201 http://armypubs.army.mil/ProductMaps/Pub Form/AR.aspx https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 530-1

Operations Security 09/26/201 http://armypubs.army.mil/ProductMaps/Pub

Form/AR.aspx

AR 525-13

Antiterrorism 12/09/201 http://armypubs.army.mil/ProductMaps/Pub

Form/AR.aspx

AR 381-12

Threat Awareness and Reporting Program (TARP)

(Section II, ¶ 2-4.b)

06/01/201 http://armypubs.army.mil/ProductMaps/Pub Form/AR.aspx

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility

Verification

10/21/201 https://www.uscis.gov/sites/default/files/files/form/i- 9.pdf

DD 441

Department of Defense Security Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms 0001-0499.htm

DD 250

Material Inspection and

Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0 499/ http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance Method /

By Whom 5.1

Display System and Connectivity

The contractor shall install one (1)

Government provided Vaddio EasyIP Mixer at the workstation location.

The EasyIP Mixer shall provide connectivity to the existing Vaddio camera and Biamp audio digital signal processor.

Functionality of synched Video and

Audio from Government provided computer.

Functional Test and Inspection / COR

5.2 Audio System

The existing audio system consists of a distributed audio system, ceiling-mounted Audix microphones, and a Biamp audio digital signal processor. The configuration and function of this system shall remain unchanged with the exception of adding connectivity for the new laptop dock for presentation and conferencing purposes.

Functionality of synched Video and

Audio from Government provided computer.

Functional Test and Inspection / COR

5.3 Conference

System

The software installed on the Government’s computer (Microsoft Teams, Zoom, etc.) shall provide control for all conferencing capabilities

Functionality for conferencing capabilities

Functional Test and Inspection / COR

5.4 Control System

The existing control system is comprised of an Extron IPCP Pro control processor and an Extron button panel.

The Contractor shall provide and install one

(1) Extron NBP 50 button panel at the workstation location and it shall provide for the following features:

1) SIPR/NIPR laptop dock source selection

2) Volume control The existing Vaddio handheld remote shall provide control for the existing camera.

All audio and visual functions operate appropriately between SIPR and

NIPR networks.

Functional Test and Inspection / COR

5.5 Additional

Components

The Contractor shall provide all necessary wiring and mounting hardware. To reduce signal loss, the Contractor shall provide a digital HDMI twisted pair transmitter and receiver between the laptop dock and a designated Extron video switcher.

Components are wired and mounted according to manufacture specifications.

Visual Inspection / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS

Reference /

Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.3 AT Level

1 Awareness

Training Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.5.4 iWATCH Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.5.11

OPSEC

Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

File details come from the government source that posted it. Updated .