Text version

PWS Attachment 5 of Cooling Water Equipment and Systems Repair and Maintenance Contract 25 October 2022

PWS Performance Requirements

Performance Objective
Standard
Method of Surveillance
Acceptable Threshold

Preventative Maintenance (PM) Services, Reference Section 3.4.1 3.4.2 and 3.4.3

All Cooling Water equipment fully operational at all times, unless otherwise scheduled and approved by the COR. Provide a detailed report/checklist within forty-eight (48) hours of completion.
100% Inspection

Cooling Water equipment PMs are completed for each building. 97% completed upon initial inspection and 100% are completed upon final inspection. Reports are submitted within forty-eight (48) hours 95% of the time. Reports are timely and accurate.

Timely and responsive to all Diagnostic service requests, and Corrective Maintenance Level I calls, Reference Sections 3.4.1.2 through 3.4.1.8

Repairs, general and emergency, are made in a timely manner; the contractor shall respond on the same day for requests submitted before 1200 (noon) and the next day for requests received after 1200; customers are informed of the expected repair time. Response and repairs are made within the specified time of twenty four (24) hours.
100% Inspection

Service calls are responded to on-time 90% of the time. Repairs are completed and Cooling Water equipment is returned to service on-time 95% of the time.

Submission of timely and accurate maintenance and repair reports, Reference Sections 3.4.1.8
Accurate and complete reports are delivered on schedule.

100% Inspection

100% of reports are timely and accurate.

Service Interruptions, Reference Section 3.3.5

Contractor shall schedule and perform service to the Cooling Water equipment in a manner that minimally disrupts building occupants and government business. Contractor notifies COR prior to taking equipment out of service.
100% Inspection

Cooling Water equipment downtime is not to exceed one time per piece of equipment per quarter. Downtime shall not exceed two (2) consecutive days.

Corrective Maintenance Level II Repairs, Reference Sections 3.4.4
Work is accomplished in accordance with the requirements of the scope of work. The Cooling Water equipment is operational and does not present a danger to personnel or equipment.
100% Inspection
95% of the work is completed upon initial inspection and 100% of work is completed upon final inspection.

PWS Attachment 5, Page 2 of 2