PWS and PRS Medical Monitoring.docx
DOCX document 76 KB Posted
- Attached to
- Medical Monitoring
- Solicitation number
- W911YN-26-Q-A005
About this file
This is a Performance Work Statement (PWS) for Medical Surveillance Examination Services supporting the Florida Army National Guard (FLARNG) Occupational Medical Surveillance Examination Program. The contractor shall provide Board Certified Occupational Health Physicians or Physician's Assistants, supervision, labor, tools, materials, equipment, HIPAA and privacy statements, and all incidentals required to conduct medical surveillance examinations and occupational health services using mobile medical units (vans, trailers). Services will be provided to 30-60 estimated personnel across three locations during one of two performance periods: April 6-10, 2026, or April 20-24, 2026. Hours of operation are 0700-1700, with services performed in accordance with OSHA, NIOSH, American Board of Occupational and Environmental Medicine (ABOEM), and American Association of Occupational Health Nurses (AAOHN) standards. COVID protocol and CDC regulations must be maintained during all testing.
The contractor must conduct comprehensive medical examinations including vital signs, job functional analysis, bloodwork (CBC, chemistry panel, chromium, cadmium, lead, and ZPP levels), urine chemistry, and pulmonary function tests performed by licensed or certified personnel in accordance with 29 CFR 1910.1001. All clinical laboratory services must be performed by a DHHS-licensed laboratory. The contractor shall provide daily test site status reports to the Contracting Officer's Representative (COR) and conduct a comprehensive review meeting within 30 days of test completion. Personnel eligible for examinations include FLARNG full-time support and temporary personnel working in aviation and ground heavy equipment maintenance, mechanics, painting, welding, and other hazardous work environments. The contractor must maintain medical liability insurance acceptable to the Contracting Officer, comply with all installation security and access requirements, complete required antiterrorism and OPSEC training, and ensure all contractor employees are properly identified and comply with installation regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis-Solicitation-W911YN26QA005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
MEDICAL SURVEILLANCE EXAMINATION SERVICES
1.0 General: The Performance Work Statement (PWS) supports the Florida Army National Guard (FLARNG) for Occupational Medical Surveillance Examination Program in accordance with the Occupation Safety and Health Association (OSHA) and other regulations. There are 3 locations that require this service. The estimated number of personnel to be examined is 30-60. The Government has the right to increase and/or decrease the number of employees/military personnel and the locations for service. The hours of operation will be based on the shops in that area, being tested due to time zone and traffic issues. MUST ENSURE COVID PROTOCAL/CDC REGULATIONS
1.1 Scope: The Contractor will provide Board Certified Occupational Health Physician(s) / Physician’s Assistant, supervision, all labor, tools, materials, equipment, to include HIPPA and privacy statements and incidentals required to conduct the Medical Surveillance Examination / Occupational Health Services for the FLARNG. The contractor must be capable of conducting the Technician Occupational Medical Surveillance Examinations using mobile medical units (vans, trailers etc.)
1.1.1 Objectives MUST ENSURE COVID PROTOCAL/CDC REGULATIONS WHILE PREFORMING ALL NEEDED TESTING FOR TECHICIANS IN HAZARDOUS WORK ENVIRONMENTS.
1.2 Background: The purpose of the Occupational Medical Surveillance Examination Program is to provide job-related Medical Surveillance Examinations and Occupational Health Services to the technicians FLARNG full-time support (FTS) and/or temporary personnel who are or could potentially be exposed to health hazards in the work environment. The physicals will be given to technicians working in aviation and ground heavy equipment maintenance, mechanics, painters, welders, and any other employee exposed to a workplace hazard. The examination shall include personnel assigned to positions requiring specific standards of physical fitness. Personnel not included under these examinations are State Employees, civilian contractors, and the part-time traditional Soldiers.
1.3 Period of Performance (PoP): The Period of Performance shall be for a two (2) week period or 9 days performed during either one of the following periods based on the Government and Contractor availability.
1.3.1 Period 1: 6 April 2026 – 10 April 2026
1.3.1 Period 2: 20 April 2026 – 24 April 2026
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services per Technical Exhibit 3, between the hours of __0700 – 1700_ except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be per Technical Exhibit 3. The contractor shall always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.1.1 Telework:
The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: N/A
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): N/A
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and general protection/security policy and procedures. This language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.4.5.1 For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.4.5.1.1 N/A
1.4.5.1.2 N/A
1.4.5.1.3 N/A
1.4.5.1.4 N/A
1.4.5.1.5 N/A
1.4.5.1.5.1 N/A
1.4.5.1.6 N/A
1.4.5.2 N/A).
1.4.5.2
1.4.5.3 AT Level I Awareness training. This language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.
1.4.5.4 iWATCH Training: This language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 15 calendar days after contract award.
1.4.5.5 N/A
1.4.5.6 N/A
1.4.5.6.1 N/A
1.4.5.6.2 N/A
1.4.5.6.3 N/A
1.4.5.6.4 N/A
1.4.5.6.5 N/A
1.4.5.7 N/A
1.4.5.8 N/A
1.4.5.9 N/A
1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
1.4.5.11 OPSEC Training: Per AR 530‐1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
1.4.5.12 OPSEC SOP/Plan. N/A.
1.4.5.13 N/A
1.4.5.14 N/A
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control. N/A
1.4.6.2 Lock Combinations: N/A
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating _equipment_ used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles pass) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel
The contractor shall travel to each location during the performance of this contract to complete the exams at the pre-set sites in technical exhibit 3.
The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made.
The contractor may be required to travel to off-site training locations and to ship training aids to these locations in the performance of this contract. The cost of shipping training aids shall be borne by the contractor. The contractor will not be reimbursed for the costs of shipping training aids in accordance with the JTR and limitation of funds in this contract.
1.4.13 Data Rights the Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Phase In / Phase Out Periods To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor shall have personnel on board, during the 6 April 2026 – 10 April 2026 or 20 April 2026 – 24 April 2026 phase in/ phase out periods. During the phase in period, the contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
| AEI | Army Enterprise Infostructure | |
| AR | Army Regulation | |
| AT/OPSEC | Antiterrorism/Operational Security | |
| BI | Background Investigation | |
| CM | Contract Manager | |
| COR | Contracting Officer Representative | |
| DA | Department of the Army | |
| DD254 | Department of Defense Contract Security Classification Specification | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DoD | Department of Defense | |
| DSCA | Defense Counterintelligence and Security Agency | |
| FAR | Federal Acquisition Regulation | |
| GFP/M/E/S | Government Furnished Property/Material/Equipment/Services | |
| HQDA | Headquarters, Department of the Army | |
| HSPD | Homeland Security Presidential Directive | |
| IA | Information Assurance | |
| IS | Information System(s) | |
| KO | Contracting Officer | |
| NGB | National Guard Bureau | |
| OCI | Organizational Conflict of Interest | |
| PII | Personally Identifiable Information | |
| PIPO | Phase In/Phase Out | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program | |
| SCR | Service Contract Reporting | |
| SSN | Social Security Number | |
| TE | Technical Exhibit | |
| USD(I) | Under Secretary of Defense for Intelligence |
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.
3.2 Materials: N/A
3.3 Equipment: N/A
3.4 Services: N/A
3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): N/A
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: N/A
4.3 Contractor Security Clearance: N/A
5.0 Requirements: The contractor shall:
5.1 This contract is for “Non-Personal” Health Care “Services”, as defined in 37.101. In accordance with FAR Part 37.4 the Government may enter into a non-personal health care services contract with physicians, dentists and other health care providers under authority of 10 U.S.C. 2304 and 41 U.S.C. 253. The Government shall evaluate the quality of professional and administrative services provided, while the Government retains no control over the medical, professional aspects of services rendered. The Contractor will indemnify the Government for any liability producing act or omission by the Contractor, its employees and agents occurring during contract performance. The Contractor will maintain medical liability insurance, in a coverage amount acceptable to the Contracting Officer, which is not less than the amount normally prevailing within the local community for the medical specialty concerned. The Contractor is required to ensure that its subcontractors, if any, for provisions of health care services, contain the requirements of the clause at 52.237-7, Indemnification and Medical Liability Insurance, including the maintenance of medical liability insurance.
5.1.1 Contractor shall ensure all procedures are conducted in accordance with applicable American Board of Occupational and Environmental Medicine (ABOEM), American Association of Occupational Health Nurses (AAOHN), U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and the National Institute for Occupational Safety and Health (NIOSH) Standards
5.1.2 Contractor shall ensure all clinical laboratory services are performed by a laboratory licensed through the U.S. Department of Health and Human Services (DHHS), Health Care Financing Administration pursuant to the terms of the Clinical Laboratories Improvement Act of 1967 (42 U.S.C. 263a) and the College of American Pathologies.
5.1.3 Contractor shall provide a Board eligible or Certified Occupational Medicine Physician to conduct job-related medical surveillance physical examinations and occupational health consultation services.
5.1.4 Contractor shall arrange for the opportunity to consult with the COR/POC by telephone to coordinate or resolve issues that might arise before, during, and after the testing period. The appointed COR/POC is the only one allowed to give authorization for testing and each individual will be accompanied by an authorization form prior to any testing.
5.1.5 Contractor shall conduct a daily test site status report updated by telephone or in person to the COR/POC. This report will cover total number of tests conducted, total number of no-shows, the total number of uploaded hearing tests, and any other pertinent information regarding the performance of the testing.
5.1.6 Contractor shall perform a comprehensive review and evaluation within 30-days following the conclusion of testing. The COR/POC will contact and schedule a follow-up review and evaluation meeting to discuss positive and negative aspects of testing.
5.1.7 Contractor shall ensure instrumentation must meet or exceed appropriate performance standards, and accuracy must be verified in accordance with current Occupational Medicine Certification standards.
5.2 General Exam: Contractor will provide vital signs to include height, weight, blood pressure, pulse and respirations.
5.2.1 Contractors will provide a Job Functional Analysis or Kraus-Weber that includes back strength and flexibility. Note any pain or recommended lifting limitations if less than 50 lbs.
5.2.2 Contractor shall ensure the lab work that is requested is sent out daily and results are reported as quickly as possible. This is a base line report for each soldier in a hazardous work area for future use if an exposure occurs during the employment period.
1. Bloodwork will consist of CBC, Chem, Chromium, cadmium, lead, and ZPP.
2. Urine Chemistry will consist of BUN and Creatinine
5.2.3 Contractor shall ensure Pulmonary Function Tests (PFTs) Performed by a licensed physician, Certified Pulmonary Function Technologist, or Registered Respiratory Therapist in accordance with 29 CFR 1910.1001.
1. Screenings will only be conducted on employees exposed to respiratory hazards that will require a respirator to mitigate their hazards that are above the action level.
2. Test will include as a minimum Forced Expiratory Volume in one second (FEV1), Forced Vital Capacity (FVC), comparison with recognized normal’ s for the individual's height and weight, sex, race, age and a documented interpretation by a pulmonologist or certified Occupational Health physician.
1. Follow NIOSH and ATS-ERS standard requirements:
a. Continue testing individual when the patient is improving until improvement is <30ml.
b. Test results are acceptable with a minimum of three acceptable maneuvers that are free from a leak, obstructed mouthpiece, hesitation, false starts, cough, glottis closure, early termination, and have a good curve of at least 6 seconds duration.
c. Test results are reproducible in that they have the same result from the individual (two largest FVCs are within 0.150 L of each other and two largest FEV1's are within 0.150 L of each other) when the test is repeated several times. Testing is continued until criteria are met or 8 trials are attempted, or the employee being tested cannot or should not continue.
d. If three (3) acceptable and two (2) repeatable tests cannot be obtained, the technician performing the PFT must document the reason the standard could not be met.
e. Always use measured height not reported height by the nearest half inch without footwear.
f. Always indicate source of reference value on reports for adjusted predicted value.
g. No smoking within 1 hour prior.
h. No cold, flu or allergies within two weeks.
i. No inhaler use prior to test that would still be in the patient’s system.
j. Specifications regarding equipment guidelines and calibration, test administration, and test interpretation must meet applicable OSHA and ANSI standards. Supporting documentation will be provided to this office daily or annually depending on manufacturing guidelines of spirometer.
k. Respirator clearance documented, and a copy given to employee at time of visit.
5.2.4 Contractor shall ensure dermatological examinations are performed by a physician and include an inspection of the entire integumentary system with emphasis on areas most likely to be affected by the employee's occupational (i.e. radiation) exposures. Documentation will include the presence of any dermatomes or lesions of the skin.
5.2.5 Contractor shall ensure instrumentation must meet or exceed appropriate performance standards, and accuracy must be verified in accordance with current Occupational Medicine Certification standards
5.2.6 Contractor shall provide the Contracting Officer’s Representative with a Quality Assurance Medical Surveillance Plan listing the procedures or processes, which shall be utilized to meet the requirements discussed in the PWS.
5.2.7 In the event of a Contractor equipment failure, specific testing and/or parts of examinations that are not completed during the testing period shall be completed at a scheduled time mutually convenient for the Contractor, COR/POC and the Facility(ies). Unfinished testing/examinations will be completed at no additional cost to the Government. The option to schedule physicals not completed due to equipment failure, through a local occupational medical facility shall be done at no cost to the Government. The Contractor shall be directly responsible to cover costs for completing these make-up screenings.
5.3 Personal Protective Equipment (PPE): Contractor shall furnish and assure healthcare workers are provided with the appropriate PPE such as, but not limited to: gloves, protective eyewear, and etc., where there is a potential for exposure to blood or other potentially infectious materials.
5.3.1 Contractor shall ensure each healthcare worker complies with the requirements of 29 CFR 1910.1030 Blood borne Pathogens Standard.
5.4 Infectious Waste Disposal: Disposal of all infectious waste shall be in accordance with local, state, and federal regulation and disposed of by the contractor unless other accommodations have been coordinated in writing.
5.4.1 Contractor shall ensure puncture resistant sharps containers are readily accessible to healthcare workers and located in all treatment areas where sharps could potentially be used.
5.5 Mobile Unit Configuration: Medical Surveillance screening shall be accomplished via mobile unit designed to ensure complete individual privacy. Features of the unit shall include, but are not limed to, a climate-controlled atmosphere, patient waiting / holding area for registration, changing room, on board restroom, testing / phlebotomy station, individual audiometric testing booth, and physical examination area.
5.5.1 Mobile units shall be equipped with a self-contained power source. The Government shall not provide power to the contractor’s mobile unit unless other accommodations have been coordinated in writing.
5.6 Medical Reports and Recordkeeping: Contractor shall immediately contact the COR by telephone if results of medical surveillance screening(s), which are questionable and/or of critical significance and/or require follow-up. Contractor shall send all results to include all diagnostic tests, graphs, charts, reports, questionnaires, waivers, employee consent forms, physical findings, and examination results to the Occupational Health Manager within 30 working days of completion of testing to:
Florida Army National Guard ATTN: OHS Manager Tammy Peters 5629 St Rd 16 W Building 2127 Starke, FL 32091
5.6.1 Contractor shall identify all medical records with the employee’s full name, social security number, date of birth, job code, and the name of the employee’s workplace or facility at a minimum. The contractor shall ensure work / health history forms and medical reports are complete and legible (typed / printed).
5.6.2 Contractor shall ensure that each employee signs the Privacy Act Statement (DD Form 2005) during the registration process.
5.6.3 Summary Report: The Contractor will provide a comprehensive data processed analytical end report in both electronic and hardcopy format. Electronic format shall be on CD-R and hardcopy shall be placed in an Acco Presstex Grip Punchless Binder (Blue) or equal product, with tabs containing the below data:
1. Tab # 1 - Classification Summary to include:
Colum # 1 - Employee Name, Colum # 2 – SSN, Colum # 3 - D.O.B., Colum # 4 –Blood Pressure (B/P) - N = normal, A = abnormal, Colum # 5 – PFT - N = normal, A = abnormal,
2. Tab # 2 – Employee Listing with Bloodwork results – Colum # 1 Employee Names, Colum # 2 – Date test conducted, and Colum # 3 - Classification – results of all bloodwork
3. Tab # 3 – Employee Listing with Most Recent PFT – Colum # 1 Employee Names, Colum # 2 – Date test conducted, and Colum # 3 - Classification – Normal, Mild Obstructive, Borderline Obstructive, Moderate Obstructive and Significant Obstructive as the test indicates
4. Tab # 4 – Employee Listing with most Recent PFT Results – Colum # 1 Employee Names, Colum # 2 Date test conducted, Colum # 3 – FVC, Colum # 4 - FEV1, Colum # 5 – FEV1/FVC and other information as tested.
5.Tab # 5- Pulmonary Summary Report – Analytical Breakdown to include – Total number of employees, Number of Employee Tested, Number with Normal Screening.
6. Number with Mild Restriction, Number with Moderate Restriction, Number with Severe Restriction, Number with Borderline Obstruction, Number with Mild Obstruction, Number with Moderate Obstruction, Number with Severe Obstruction, and Number with Superimposed Restriction.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
| Date of Publication |
| Mandatory or Advisory |
| Website |
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars
Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 01/23/2014 (Change 1: 07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf
| DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP) |
| 04/03/2017 |
https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC) 09/09/14 (Change 1: 05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors 08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy Program 05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce Improvement Program 12/19/2005 (Change 4: 11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM) 02/28/2006 (Change 2: 05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors 03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx
AR 25-2
Information Assurance 04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 530-1
Operations Security 09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 525-13
Antiterrorism 12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
AR 381-12
Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b) 06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
| Form |
| Date |
| Website |
DD 1172-2
Application for Identification Card/DEERS Enrollment
| Mar 2017 |
| http://www.dtic.mil/whs/directives/forms/index.htm |
I-9 Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security Agreement Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving Report
| Aug 2000 |
| https://www.esd.whs.mil/Directives/forms/dd0001_0499/ |
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
5.2.2 PRS # 1:
Labs
| Contractor shall ensure Labs are Performed by a licensed physician, Certified Physician Assistant, or Registered Nurse in accordance with DoDI 6055.05m |
| Zero deviation from standard |
| Periodic inspection by COR/POC |
5.2.3 PRS # 2:
Spirometry
| Contractor shall ensure Pulmonary Function Tests (PFTs) Performed by a licensed physician, Certified Pulmonary Function Technologist, or Registered Respiratory Therapist in accordance with 29 CFR 1910.1001. measure the following primary visual skills. |
| Zero deviation from standard |
| Periodic inspection by COR/POC |
5.6 PRS # 4:
The contractor shall perform required tests each day
| All technicians who did not attend the event will be removed by the Contractor so there are no inconsistencies in the rosters or reports ran after the event. |
| Zero deviation from standard |
| Periodic inspection by COR/POC |
5.2.8 - 5.2.9 PRS # 5:
Daily Status Report
| Contractor contacts COR/POC daily either by telephone or in person. |
| Zero deviation from standard |
| Periodic inspection by COR/POC |
TECHNICAL EXHIBIT 2
Deliverables Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
| 5.6.3 Contractor will provide at the conclusion of the services a summary report of medical records. |
| Completed reports will be generated the conclusion of all testing sites and after all services have been reviewed by a DR/PA. |
| 1 copy of the report will be created for the Occupational Health Specialist. |
| Both Digital and Paper Copy (Binder) |
| All copies and records will be sent to the COR/POC |
| 5.6.3 Contractor will provide; at the conclusion of the services a report summary of all services provided on each individual |
| Completed reports will be generated the conclusion of all testing sites and after all services have been reviewed by a DR/PA. |
| 2 hardcopies of the report will be created. One for the individuals tested and one for each medical record on the technician |
| Paper Copies |
| Mailed to the FLARNG Occupational Health Specialist office within 30 calendar days of completion of testing. |
| 1.4.5.3 AT Level 1 Awareness Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.3 AT Level 1 Awareness Training Certificates. |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.11 OPSEC
Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
TECHNICAL EXHIBIT 3
Estimated Workload Data
Ver. October 2022 image1.emf
File details come from the government source that posted it. Updated .