PWS and Attachment 1 - Reference Map.pdf
PDF 978 KB Posted
- Attached to
- Santa Rosa Vegetation Removal Federal contract opportunity
- Solicitation number
- W912PP25Q0015
About this file
This Performance Work Statement (PWS) details a non-personal services contract for vegetation control at the Santa Rosa Dam in New Mexico, to be executed by the U.S. Army Corps of Engineers Albuquerque District. The project encompasses approximately 25 acres and requires a comprehensive approach involving both herbicide application and mechanical removal of vegetation, including species like Salt Cedar, Kochia, Siberian Elm, and Russian Olive. The primary objectives are to eliminate vegetation from the upstream and downstream dam faces, groins, and abutments to comply with dam safety requirements, with work to be performed twice annually during the growing season between September 1 and June 30.
The contract will be awarded as a firm, fixed-price agreement with a base year and four potential option years, running from the date of award through March 30, 2030. The contractor must be a state-certified pesticide applicator and will be responsible for developing detailed plans including an Accident Prevention Plan, Pesticide Management Plan, and Environmental Protection Plan. Specific requirements include using targeted pesticide treatment methods, avoiding broadcast application, using EPA-approved dyes to mark sprayed areas, and ensuring all herbicides are labeled for use near aquatic resources. Mechanical removal must thoroughly eliminate woody vegetation, including root systems, and involves careful undercut and backfill procedures to maintain dam structural integrity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2- Offeror Price Schedule.xlsx | XLSX spreadsheet | |
| W912PP25Q0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Santa Rosa Dam
Vegetation Control by Pesticide Application and
Mechanical Removal
PART 1
GENERAL INFORMATION
1.0 General:
This is a non-personal services contract to provide a combination of herbicide application and mechanical removal for trees, shrubs and grasses at the Santa Rosa Dam. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the
Government.
1.1 Description of Services/Introduction:
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform vegetation removal by a combination of herbicide application and mechanical removal for the Santa Rosa Dam as defined in this
Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background:
The Santa Rosa Project has vegetation growing on the upstream and downstream faces of the dam, and the stability berm. This vegetation needs to be removed and controlled to prevent degradation of the dam. This project follows the guidelines of the U.S. Army Corps of Engineers – Albuquerque
District “Routine Vegetation Management Plan” (August 2020).
The project areas may contain vegetation that may include, but not be limited to the following:
- Salt Cedar (Tamarix spp.)
- Kochia (Bassia scoparia)
- Siberian Elm (Ulmus pumila)
- Canada Thistle (Cirsium arvense)
- Tree of Heaven (Ailanthus altissima)
- Cottonwood (Populus deltoides subsp. wislizeni)
- Russian Olive (Elaeagnus angustifolia)
- Cocklebur (Xanthium strumarium)
- Ravenna Grass (Saccharum ravennae)
- Sunflower (Helianthus annuus)
- Rubber rabbitbrush or chamisa (Ericameria nauseosa)
- Russian Knapweed (Acroptilon repens)
- Perennial Pepperweed (Lepidium latifolium, L. draba)
- Tumbleweed or Russian thistle (Salsola tragus)
1.3 Objectives:
The objectives of this contract are as follows:
Periodically, the U.S. Army Corps of Engineers (USACE) is required to remove all vegetation from the upstream and downstream dam faces, groins, and abutments of Santa Rosa Dam in order to comply with dam safety requirements in Engineering Technical Letter (“ETL”) 1110-2-583, Guidelines for Landscape Planting and Vegetation Management at Levees, Floodwalls, Embankment Dams, and Appurtenant Structures. The project areas total is approximately 25 acres
(Attachment 1, Reference Map). All vegetation within project area 1 (Upstream and Downstream
Dam face) and project area 2 (Stability Berm) shall be eliminated via a combination of herbicide application and mechanical removal according to contract requirements outlined in Part 5 of this
PWS. The project area shall be treated twice during the growing season (Fall and Spring) between September 1 and June 30. Work needs to be done while vegetation is actively growing so that effects of the herbicide will provide maximum results. Any chemical used shall be labeled for use in proximity to aquatic resources.
1.4 Scope:
Services include treatment of vegetation control via a combination of herbicide application and mechanical removal in the areas depicted in Attachment 1. Specific tasks are described in Part 5 of this PWS. USACE shall mark and provide the coordinates for the boundary areas as well as provide all requirements of the work.
1.5 Period of Performance:
The period of performance shall be one year from receipt of award with additional option years of four years. During both base and option years, spraying will be conducted twice a year, Fall and
Spring. This period of performance is provided with the intent of timing herbicide applications at a time of year when it will be the most effective per the manufacturer’s recommendations. Please reference Section 5.3 Specific Tasks, regarding grow season and application.
Base Year: Date of Award – March 30, 2026
Option Year 1: March 31,2026 – March 30, 2027
Option Year 2: March 31,2027 – March 30, 2028
Option Year 3: March 31,2028 – March 30, 2029
Option Year 4: March 31,2029 – March 30, 2030
1.6 General Information:
1.6.1 Place of Performance: The work is located at and around the Santa Rosa lake Project Office, in
Santa Rosa, NM. Physical address is Louie and Joe Page Road, Santa Rosa, NM 88435.
1.6.2 Type of Contract: The Government will award a firm, fixed-price contract.
1.6.3 Hours of Operation: The Contractor is responsible for conducting business between the hours of
0700 and 1630, Monday thru Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.4 Recognized Holidays: The following holidays are recognized as Federal holidays and
Government offices will not be open.
New Year’s Day Wednesday, January 01, 2025
Martin Luther King Jr.’s Birthday Monday, January 20, 2025
Inauguration Day Monday, January 20, 2025
Washington’s Birthday Monday, February 17, 2025
Memorial Day Monday, May 26, 2025
Juneteenth National Independence Day Thursday, June 19, 2025
Independence Day Friday, July 04, 2025
Labor Day Monday, September 01, 2025
Columbus Day Monday, October 13, 2025
Veteran’s Day Tuesday, November 11, 2025
Thanksgiving Day Thursday, November 27, 2025
Christmas Day Thursday, December 25, 2025
1.6.5 Quality Control: The Contractor shall develop and maintain an effective Quality Control
Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that their work complies with the requirement of the contract. The QCP shall be delivered within 30 days after contract award. Three copies of a comprehensive written QCP shall be submitted to the Contracting Officer (KO) and Contracting Officer Representative (COR) within 5 working days when changes are made thereafter. After acceptance of the quality control plan the
Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. The Contractor will not be required to have a separate Quality Control Manager
(QCM) on-site during all work; while quality control and required reporting remain the sole responsibility of the Contractor, the Government will accept a superintendent or foreman as a representative of, and reporting directly to, the contractor’s QCM at the discretion of the
Contractor, and subject to approval by the COR. The Contractor retains all liability for ensuring reporting accuracy. The QCM shall observe work at the site at a minimum of once per week during work performance.
1.6.6 Quality Assurance: The Government shall evaluate the Contractor’s performance and compliance to the defined requirements within this contract.
1.6.7 Security Requirements:
1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.6.7.2 Antiterrorism (AT) Level I training: All contract personnel requiring routine access to
Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).
1.6.7.3 General Security Requirements and Guidance: Per the guidelines mandated with the implementation of OPORD 2022-03: Integrating Antiterrorism and Operations Security
(OPSEC) into the USACE Acquisition Process, the following OPSEC provisions apply to this requirement:
The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer
Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a
COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the
Contractor shall provide written documentation (e.g., email or memorandum) to the
Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism
Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel.
In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the
Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
1.6.7.4 Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as
“TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
1.6.7.5 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See
Something, Say Something: All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
1.6.7.6 Pre-screen Candidates Using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and
FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
1.6.7.7 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards that may be issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized person. All references to keys include keycards.
No keys issued to the Contactor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control
Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicated key/keycards to the Contracting Officer.
In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.
When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.
The contractor shall prohibit the use of Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.6.7.8 Lock Combinations: The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s Quality Control Plan.
1.6.7.9 Buddy Locks: Government will assist contract with establishing combination and padlock access. Where possible, combination and padlock access will be “buddy locked” with contract provided and controlled combination or padlocks. Contractor will not lock an area in a manner that limits or stops Government access to any government property or facility.
All contractor locks not installed as a deliverable item within the execution of this contract must be removed upon completion of work.
1.6.8 Special Qualifications: The Contractor is responsible for ensuring that all employees possess the required certifications, safety equipment, etc. Herbicide shall be applied under the supervision of or by a State Certified Herbicide Applicator.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, and other
Government personnel, as appropriate, may meet periodically with the Contractor to review the
Contractor's performance. At these meetings the Contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the
Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10 Key Personnel: The follow personnel are considered key personnel by the Government:
Contracting Officer: The Contracting Officer (KO) has the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The contracting officer may assign certain authorized representatives of the contracting officer to act within the limits of their authority as delegated by the contracting officer. See contract documentation for KO information.
Contracting Officer’s Representative (COR): A COR will not be assigned to this contract.
Instead, Lake Manager will coordinate with the KO in place of a COR.
Government Representative(s): The Government Representative(s) monitor(s) all technical aspects of the contract and assist(s) in contract administration and will perform the following:
assure(s) that the Contractor executes the technical requirements of the contract, perform(s) inspections necessary in connection with contract performance; maintain(s) written and oral communications with the Contractor concerning aspects of the contract (issue written interpretations of technical requirements including Government drawings, designs, specifications), monitors Contractor’s performance, notifies both the Contracting Officer and
Contractor of any deficiencies, coordinates availability of Government furnished property, and coordinate site entry of Contractor personnel. The Government Representative(s) is/are not authorized to change any of the terms and conditions of the contract. The Government
Representatives located at the Santa Rosa Dam Project Office are:
Project Manager: The Project Manager (PM) is not authorized to change any of the terms and conditions of the resulting contract. The Project Manager administers all aspects of the contract for the Contracting Officer including: the initiation, planning, execution, control, and closure of the contract in accordance with USACE Project Delivery Business Process. The Project Manager is not authorized to change any of the terms and conditions of the contract.
Gary Cordova
Gary.L.Cordova@usace.army.mil
(575) 472-3115
Operations Project Manager, Pecos/Canadian River Basin: The Operations Project Manager
(OPM) is responsible for regional USACE project sites, including the Santa Rosa Dam project location and may visit the work area to observe operations. The Operations Project Manager is not authorized to change any of the terms and conditions of the contract.
Martina Suazo maria.m.suazo@usace.army.mil
(505) 203-6391
Technical POC: The technical POC serves as the primary contact for the Lake and may visit the work area to observe operations. The Technical POC is not authorized to change any of the terms and conditions of the contract.
David Andrade
David.W.Andrade@usace.army.mil
(575) 472-3115
1.6.11 Identification of Contractor Employees: The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The mailto:Gary.L.Cordova@usace.army.mil mailto:maria.m.suazo@usace.army.mil mailto:David.W.Andrade@usace.army.mil
Contract Manager or alternate shall be available between 0730 and 1600 Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.
Qualifications for all key personnel are listed below.
All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.12 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the
Contracting Officer. All materials supplied to the Government shall be the sole property of the
Government and may not be used for any other purpose. This right does not abrogate any other
Government rights.
1.6.13 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.14 Safety:
1.6.14.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-1-
1 and OSHA Requirements: The Contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health
Requirements Manual, EM 385-1-1 in effect on the date of the contract award. EM 385-1-1 and its changes are available at https://www.publications.usace.army.mil/USACE-
Publications/Engineer-Manuals/. The Contractor must also comply with Occupational
Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the
Contractor's responsibility to maintain familiarity with current OSHA standards.
1.6.14.2 Zero Accident Goal: The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero accidents. To attain this goal, it will be necessary for contractor management to set the expectation that worker injury is unacceptable and to create a culture where employees at all levels accept ownership of their safety performance.
1.6.14.3 Hazardous or Toxic Conditions: If the Contractor encounters any possible hazardous or toxic conditions, the Government Representative must be notified immediately.
1.6.14.4 Contractor Accident Prevention Plan: Submit the Accident Prevention Plan (APP) for https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ review and acceptance by the Government. A competent person must prepare the written site-specific APP. Prepare the APP in accordance with the EM 385-1-1 and the ENG Form
6293. The APP is a written site-specific Safety and Occupational Health (SOH) plan that documents project, contract, and job-specific potential hazards in the workplace, and the company policies, controls, and work practices that will be used to minimize those hazards.
Upon contractor approval, the plan must be submitted to the KO for review and acceptance prior to the performance of any work. No contract work can begin without a KO accepted
APP.
1.6.15 Cultural and Environmental Compliance
1.6.15.1 Protection of Natural Resources: The Contractor shall describe measures to protect and mitigate impacts to land resources, landscape features, stream crossings, fish and wildlife resources, wetlands, and waterways.
1.6.15.2 National Environmental Policy Act (NEPA): The proposed action is considered a categorical exclusion from the National Environmental Policy Act of 1969, as amended
[NEPA; 42 U.S.C. 4321, et seq.]. Pertinent categorical exclusions, as noted in Engineer
Regulation 200-2-2 (33 CFR 230), Environmental Quality Procedures for Implementing
NEPA, Section 9 are:
• Activities at completed Corps projects which carry out the authorized project purposes.
• Minor maintenance dredging using existing disposal sites.
The proposed project is needed to maintain dam function. No conditions exist that would warrant preparation of an Environmental Assessment or an Environmental
Impact Statement. The proposed activities, include measures to minimize impacts to minimal or no adverse effect on the natural resources of the area and should include neither individual nor cumulative impacts to the quality of the human environment.
1.6.15.3 Pesticide Management Plan: The Contractor shall develop and submit a Pesticide
Management Plan prior to receiving Notice to Proceed. An updated Pesticide Management
Plan shall be resubmitted annually by 15 January of each calendar year, in accordance with
Technical Exhibit 2 of this PWS.
1.6.15.4 Environmental Protection Plan (EPP): Prior to initiating any onsite work, the Contractor shall submit an Environmental Protection Plan within 60 days after the contract award date and not less than 30 days before the Pre-Service Meeting. The purpose of the EPP is to present an overview of known or potential environmental issues that must be considered and addressed during the performance of the requirements of this PWS.
The Contractor shall revise the EPP throughout the Project to include any reporting requirements, changes in site conditions, or contract modifications that change the project scope of work in a way that could have an environmental impact. No requirement in this section will relieve the Contractor of any applicable Federal, State, and Local environmental protection laws and regulations. During the performance of the requirements of this PWS, the Contractor shall identify, implement, and submit for approval any additional requirements to be included in the EPP. A current version of the EPP shall be readily available onsite during the performance of the requirements of this PWS.
The EPP shall include, but is not limited to, the following elements:
A) General Overview and Purpose: A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as stormwater pollution prevention plan, spill control plan, solid waste management plan, wastewater management plan, air pollution control plan, contaminant prevention plan, pesticide management plan, traffic control plan, etc.
B) Duties: The duties and level of authority assigned to the person(s) on the job site who will oversee environmental compliance, such as who is responsible for adherence to the
EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the site
(if applicable), and who is responsible for training the Contractor’s environmental protection personnel.
C) Procedures: Standard and project-specific operating procedures that will be used to effectively manage and protect the environment on the project site.
D) Communication: Describe the communication and training procedures that will be used to convey environmental management requirements to Contractor employees and subcontractors.
E) Contact Information: Emergency contact information (office phone number, cell phone number, and email address) for responsible Contractor personnel.
F) Maps and Plans: Develop maps and plans that document the locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess oil or other hazardous material, if applicable. Delineation of all activities in each portion of the area and identify the areas of limited use or nonuse.
G) Stormwater Management and Control: The Contractor shall describe the current ground cover and erodibility of soils onsite. Temporary and permanent measures and structural practices to minimize surface water runoff and the subsequent mobilization of sediment during and following performance of the requirements of this PWS. The description should include effective selection, implementation, and maintenance of Best Management Practices
(BMPs).
H) Protection of the Environment from Waste Derived from Contractor Operations:
Describe practices to control and the disposal of solid, sanitary, and hazardous waste. At a minimum, include the following: list of the types of hazardous wastes expected to be generated, procedures to ensure a written waste determination is made for appropriate wastes that are to be generated; sampling/analysis plan, including laboratory method(s) that will be used for waste determinations and copies of relevant laboratory certifications;
methods and proposed locations for hazardous waste accumulation/storage (that is, in tanks or containers); management procedures for storage, labeling, transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted); management procedures and regulatory documentation ensuring disposal of hazardous waste complies with Land
Disposal Restrictions; management procedures for recyclable hazardous materials such as lead-acid batteries, used oil, and similar; used oil management procedures in accordance with 40 CFR 279; hazardous waste minimizing procedures; plans for the disposal of hazardous waste by permitted facilities; and procedures to be employed to ensure required employee training records are maintained.
I) Prevention of Releases to the Environment: Describe procedures to prevent releases to the environment. Include a process of notifications in the event of a release to the environment.
J) Regulatory Notification and Permits: List what notifications and permit applications must be made. Some permits require many days to obtain. Demonstrate that those permits have been obtained or applied for by including copies of applicable environmental permits. The
EPP will not be approved until the permits have been obtained.
K) Air Pollution/Engineering Processes: Identify planned air pollution-generating processes and management control measures (including, but not limited to, spray painting, abrasive blasting, demolition, material handling, fugitive dust, and fugitive remissions). Log hours of operations and track quantities of materials used.
L) Compliant Materials: Provide the Government a list of and SDSs for all hazardous materials proposed for use onsite. Materials must be compliant with all Clean Air Act regulations for emissions including solvent and volatile organic compound contents, and applicable National Emission Standards for Hazardous Air Pollutants requirements. The
Government may alter or limit use of specific materials as need to meet installation permit requirements for emissions.
M) Spill Control Plan: The Contractor shall provide a Spill Control Plan, which shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM-385-1-1. This plan shall include as a minimum:
a) Name of Reporting Individual: The name of the individual who will report any spills or hazardous substance releases and who will follow-up with complete documentation.
This individual shall immediately notify the Contracting Officer and Government
Representative(s) in addition to the legally required Federal, State, and Local reporting channels (including National Response Center 1-800-424-8802) if a reportable quantity is released to the environment. The plan shall contain a list of the required reporting channels and telephone numbers.
b) Name and Qualifications of Responsible Individual: The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
c) Training Requirements: Training requirements for Contractor’s personnel and methods of accomplishing the training.
d) List of Materials and Equipment: A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
All materials used on this project shall be new, of proper type and grade, of USA manufacture, as herein specified and shall be subject to approval. Rejected materials shall be promptly removed by the Contractor from the project site, properly disposed of, and replaced in a timely manner with acceptable materials at no additional expense to the Government.
e) List of Suppliers: The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
f) Disposal Process: Disposal of all project waste shall be off-site and in accordance with all Federal, State, Regional, and Local laws and regulations.
1.6.15.5 Detailed Management Practices: Best Management Practices (BMPs) shall be incorporated into plans and implanted throughout the project, as follows:
A) All service materials shall be recycled to the extent possible. Solid waste generation shall be minimized throughout the duration of this project.
B) Treat all vegetation located within the areas shown on the vegetation free zones. Apply pesticide approved for riparian or aquatic use to vegetation within 50 ft of standing water or within the OHWM.
C) Any leftover materials shall be managed in accordance with the Safety Data Sheet (SDS).
Empty containers shall be disposed of as solid waste in accordance with Federal, State, Regional, and Local laws and regulations.
D) All wastewaters shall be managed in accordance with Federal, State, Regional, and Local laws and regulations.
E) In the case that any non-native soils, discolored soil, soil with an odor, or any debris are discovered, stop work immediately and notify the POC immediately for notification of the
District Environmental Engineering Section of Albuquerque District. If the material is determined to be free of contamination and unregulated, work will proceed without change.
F) If any material, not indicated, that may be hazardous to human health upon disturbance during work activities is encountered, stop that portion of work and notify the POC immediately for notification to the Contracting Officer. Within 14 calendar days, the
District Office Environmental Engineering Section with determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the
Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification purchase to
“FAR 52.243-4, Changes” and “FAR 52.236-2, Differing Site Conditions”.
G) All equipment that shall be used at the site shall be inspected prior to being mobilized to the site to ensure that there are no leaks or drips. There shall be no fueling of the equipment or maintenance work performed at the Project site. The equipment operator shall keep a fuel and flued spill kit on board including absorbent pads that can be used to contain any drips or spills that may result from operating the equipment. Any equipment in disrepair shall be removed from the site immediately.
H) Storage, fueling, and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and contamination of the environment. Manage and store fuel, lubricants, and oil in accordance with all Federal, State, Regional, and Local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed of off-site in accordance with State, Regional, and Local laws and regulations.
I) It is required that land scarring during these activities be kept at a minimum. Any wheel ruts or land damage caused by vehicles used during these activities shall be leveled and repaired immediately or after vegetation removal activities are complete.
J) Migratory birds, their eggs, nests, and chicks are protected under the Migratory Bird Treaty
Act (MBTA). If any active nests are encountered, the Contractor shall stop working and immediately notify the POC. Activities that would directly impact the nest or that that would encroach close enough to cause adult birds to abandon the nest during the breeding season, are strictly prohibited, and all work must be stopped/suspended until the chicks have fully fledged from the nests.
K) The Contractor shall notify the POC immediately of any damage to Government or private property and injury to any person resulting from Contractor operations. The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of Contractor operations. Reasonable care shall be taken to avoid damage to existing structures and equipment. Any such damage shall be repaired or replaced as directed by the
Contracting Officer, or their authorized representative, at no cost to the Government. If the
Contractor does not make such repair or replacement, the cost thereof will be deducted from payments made to the Contractor. The Contractor shall advise the POC of any damage to the facilities due to vandalism or other causes on the day such damage is noticed. Upon completion of the work, the Contractor shall leave existing works in a condition equal to that which existed when work started.
PART 2
DEFINITIONS & ACRONYMS
2.1 Definitions:
Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the
Government. The term used in this contract refers to the prime.
Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the
Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Defective Service: A service output that does not meet the standard of performance associated with the
Performance Work Statement.
Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Government: The term Government is used in this PWS to describe the U.S. Army Corps of Engineers
Project and District Offices.
Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security: Actions that prevent the loss or damage of Government property.
Quality Assurance (QA): The Government procedures to verify that services being performed by the
Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
Quality Control (QC): All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privacy of contract with the subcontractor.
Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
Work Week: Monday through Friday, unless specified otherwise.
Site Safety and Health Officer (SSHO): This contract will allow the Contractor to utilize the foreman or superintendent to act as the Site Safety and Health Officer provided he or she meets all requirements laid out in the EM 385 1-1 Safety and Health Manual, Section 01.A.17. This person and all qualifications shall be established through submittal and approval by the USACE Safety Office. The manual is available free online through USACE.
2.2 Acronyms:
ACOR: Alternate Contracting Officer's Representative AFARS, Army Federal Acquisition Regulation
Supplement AR Army Regulation
CCE: Contracting Center of Excellence
CFR: Code of Federal Regulations
CONUS: Continental United States (excludes Alaska and Hawaii) COR Contracting Officer
Representative
COTR: Contracting Officer's Technical Representative
COTS: Commercial-Off-the-Shelf
DA: Department of the Army
DD250: Department of Defense Form 250 (Receiving Report) DD254 Department of Defense
Contract Security Requirement List DFARS (Defense Federal Acquisition Regulation Supplement)
DMDC: Defense Manpower Data Center
DOD: Department of Defense
ETL: Engineering Technical Letter
FAR: Federal Acquisition Regulation
HIPAA : Health Insurance Portability and Accountability Act of 1996
NTP: Notice to Proceed
KO: Contracting Officer
OCI: Organizational Conflict of Interest
OCONUS: Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct
Costs
PIPO: Phase In/Phase Out
POC: Point of Contact
PRS: Performance Requirements Summary
PWS: Performance Work Statement
SDS: Safety Data Sheet
QA: Quality Assurance
QAP: Quality Assurance Program
QASP: Quality Assurance Surveillance Plan
QC: Quality Control
QCP: Quality Control Program
TE: Technical Exhibit
USACE: U.S. Army Corps of Engineers
PART 3
GOVERNMENT FURNISHED ITEMS AND SERVICES
3.0 Government Furnished Items and Services:
3.1 Services: The Government will provide a site visit at the time listed below. The Government will also provide guidance and progress meetings, as necessary.
WHO: Contractors interested in the FY 2025 Santa Rosa Vegetation Removal Contract.
WHAT: Site visit of the facility, RSVP to Technical POC David Andrade, at david.w.andrade@usace.army.mil or (575) 472-3115.
WHEN: 30-APR-2025 at 1300 MDT.
WHERE: Santa Rosa Dam USACE Project Office, 2528 Joe and Louie Page Road, Santa Rosa, NM
88435; building on the right hill side just after crossing the dam heading north.
WHY: To better understand requirements of contract before quote submission deadline.
3.2 Facilities: The Government will provide the Contractor with any necessary keys or combinations to locks to access Santa Rosa Dam. Keys and lock combinations must be returned to the POC upon completion of the work described in this PWS. Bathroom facilities are accessible and available on-site to the Contractor.
3.3 Utilities: The Government will not provide any utilities for the performance of this contract requirement.
3.4 Equipment: The Government will not provide any equipment for performance of this contract requirement.
3.5 Materials: The Government will provide water, maps to the area, office and work cell phone numbers for key personnel on the project, and work email addresses for all personnel for this contract.
mailto:david.w.andrade@usace.army.mil
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.0 Contractor Furnished Items and Services:
4.1 General: The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Security Facility Clearance: A security Facility Clearance is not necessary for this requirement.
4.3 Materials: The Contractor shall furnish all supplies, equipment, materials, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.4 Equipment: The Contractor shall furnish all tools, equipment necessary to fulfill the requirements of this PWS.
4.5 Government Safety Requirements: The contractor shall submit their written Accident Prevention
Plan and Pesticide Management Plan to the Contracting Officer for evaluation and acceptance. The plan must be submitted and approved before any on-site work begins.
4.6 Service Contract Reporting (SCR): Not Required.
PART 5
SPECIFIC TASKS
5.0 Specific Tasks: The Contractor shall furnish all personnel, equipment, supplies, services, transportation, tools, materials, supervision, and other items (personal and non-personal) for services required to meet the requirements in Part 1 General portion of this PWS.
5.1 Base Task 1: Project Management and the Development of Project-Specific Plans
5.1.1 Pre-Service Meeting: The Contractor shall coordinate and conduct a Pre-Service Meeting with the Project Office/POC prior to commencing onsite activities. Project boundaries shall be reviewed with the onsite POC at the time of the Pre-Service Meeting. An environmental briefing shall be included in the Pre-Service Meeting. Provide the following information at the Pre-
Service Meeting: types, quantities, and use of hazardous materials that will be brought onto the installation and all types and quantities of wastes/wastewater that may be generated during the performance of the Contract.
Prior to the start of any onsite performance requirements of this PWS, the Contractor must perform a Pre-Service Survey of the project site with the POC and take photographs depicting existing environmental conditions in and adjacent to the site and submit a report for the record.
Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs, and grassed areas immediately adjacent to the site of work and adjacent to the Contractor’s assigned storage area and access route(s), as applicable. The Contractor and the Contracting Officer will sign this survey report upon mutual agreement regarding its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference that their preservation may cause to the work under this Contract.
5.1.2 Pre-Service Submittals: The Contractor shall submit a Treatment Plan and submit the plan to the
Contracting Officer, POC, and ECG-E staff member of the Environmental Engineering section for approval (see Technical Exhibit 3). Included in the plan: sequence of treatment, dates, times, locations, pesticide trade name, EPA registration numbers, acreage, types and quantities of pesticides used during each calendar year (due annually on or before January 15 of each calendar year), authorized uses, chemical composition, formulation, original and anticipated concentrations, application rates of active ingredient (i.e. pounds or volume of active ingredient applied), equipment used for application, locations for pesticide mixing and storage, Safety Data
Sheets (SDS), pollution prevention and spill response plans, calibration of equipment, and departures form the manufacturer’s specifications. Federal, State, and Local pest management record keeping and reporting requirements, as well as any additional Project Office specific requirements shall be fulfilled. The plan shall be developed by a State Certified Pesticide
Applicator and include a copy of their current certification in the State of New Mexico.
Contractor must supply the agency with a list of pesticides to be applied at least 30 days prior to the scheduled pesticide application.
Comply with 40 CFR 152-189, state, regional, and local pesticide management record-keeping, and reporting requirements, as well as with any additional Project Office specific requirements in conformance with Section 5-4 “Program Requirements” for data required to be reported to the
Installation is required.
5.1.3 Post-Service Submittals: Prior to the contract close-out, the Contractor shall provide/submit the following submittals:
Quantity (volume/weight) of pesticide applied by calendar year. For applications that require authorization under the National Pollutant Discharge Elimination…
This is the start of the file's text. The full file is on GovTribe.