This is a Performance Work Statement (PWS) for the repair of an Altec Pole truck/Mid-Pro high reach bucket truck operated by the 272nd EIS vehicle maintenance flight at the 147th Attack Wing in Houston, Texas.

The government requires a contractor to perform comprehensive repairs on a specific International 7400 6x4 chassis (VIN: 1HTWGAAT96J340273) with an Altec derrick attachment (Model D3060 B R, Serial Number: 0106CA0742). The contractor must furnish all labor, parts, tools, equipment, appliances, transportation, and materials necessary to complete repairs in compliance with international, federal, state, and local codes. Work shall be performed in the vendor's local shop once contracting approval is granted. The 272nd EIS vehicle maintenance flight is responsible for maintaining over 40 vehicles to support mission operations, and this truck must be fully operational to meet mission requirements. Key performance objectives include verifying and repairing pole guide functions; replacing inoperable pressure relief and tool flow divider valves; replacing corroded power package sense signal valve solenoid and valve; replacing worn lower boom and pole guide hydraulic hoses; replacing leaking pole guide tilt and open/close cylinders; replacing corroded platform swivel pin; repairing fiberglass and gelcoat damage to platform and boom tip; replacing worn quick disconnect dust covers; replacing missing tip pin and damaged placards; diagnosing inoperable digger, winch, and rotate functions at upper controls; replacing rotation bearing and hardware; and performing a level surface stability and structural load test following bearing replacement. The contractor must provide complete repair and replacement of identified items with verification through inspection and testing by both vendor and government personnel, and provide warranty coverage for all parts and labor.

View the file

Other files

File Type Posted
Combo W50S77-26-Q-0005.pdf PDF
SCA WD - ALTEC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

for

EIS Vehicle Maintenance Mid-Pro Repair

147th Attack Wing 14657 Sneider Street Houston, TX 77034

20 MARCH 2026

PERFORMANCE WORK STATEMENT

REPAIR OF HIGH REACH BUCKET TRUCK/MID-PRO 20 MAR 2026

1. Purpose: It is the government’s intent for the contractor to perform a complete repair of all items identified for Altec Pole truck/Mid Pro.

2. Scope: The contractor shall furnish all labor, parts, tools, equipment, appliances, transportation and materials necessary to complete all repairs identified. All work shall be performed in accordance with this Performance Work Statement. All work shall also be performed in accordance with international, federal, state, and local codes.

3. Period and Place of Performance: Contractor shall perform all work once approval from contracting has been granted and in vendor local shop.

4. Background: The 272nd EIS vehicle maintenance flight is responsible for the care and maintenance of over 40 vehicles to support and ensure its mission is completed. Our Altec Pole truck/Mid Pro must be fully operational to complete mission requirements.

5. Altec Asset Details:

5.1. Chassie:

• Make: International

• Vin: 1HTWGAAT96J340273

• Model: 7400 6x4

5.2. ALTEC:

• Vin Number: 47-5025658

5.3. ALTEC Derrick:

• Model Number: D3060 B R

• Serial Number: 0106CA0742

6. Performance Objectives: The contractor shall provide the following results:

6.1. Verify and repair issues with Pole Guide functions.

6.2. Replace inoperable pressure relief valve on auger release/pole guide/tool control valve.

6.3. Replace inoperable tool flow divider valve on auger release/pole guide/tool control.

6.4. Replace Corroded power package sense signal valve solenoid.

6.5. Replace Corroded power package sense signal valve.

6.6. Replace worn lower boom hydraulic hoses.

6.7. Replace worn pole guide hydraulic hoses.

6.8. Replace leaking pole guide tilt cylinder.

6.9. Replace leaking pole guide open/close cylinder

6.10. Replace Corroded platform swivel pin.

6.11. Repair fiberglass/gelcoat damage to platform (all locations).

6.12. Replace worn quick disconnect dust covers (all).

6.13. Repair gelcoat/fiberglass damage to boom tip, major.

6.14. Replace missing transferable tip pin.

6.15. Diagnose inoperable digger/winch/rotate functions at upper controls.

6.16. Replace rotation bearing and hardware.

6.17. Replace all missing or damaged placards.

6.18. Perform level surface stability test (derrick structural load test required after rotation bearing or bearing fastener replacement

7. Deliverables: The contractor shall provide the following:

7.1. Complete repair/replacement of items identified.

7.2. fix will be verified by vendor and government personnel through inspection/testing.

7.3. Warranty will be given to parts and labor for any repairs.

8. Operating Constraints: NA

To review a full clause, FAR (Federal Acquisition Regulation) References can be found at the FAR website http://acquisition.gov.

End Performance Work Statement http://acquisition.gov/