PWS - A3127001 Lease Amendment Survey.docxPWS - A3127001 Lease Amendment Survey.docx

DOCX document 98 KB Posted

Attached to
Lease Amendment Survey
Solicitation number
SRC0000042995
Issued by
Clermont County, Stratton Village, Ohio

About this file

This Performance Work Statement (PWS) is issued by the 178th Civil Engineer Squadron at Springfield-Beckley Air National Guard Base in Ohio for repair and surveying services related to a lease amendment project (Project No. A3127001). The contractor shall survey multiple areas on and around Springfield Air National Guard Base, prepare legal descriptions for an amendment to the existing lease agreement between the City of Springfield and the Department of the Air Force, and submit deliverables to the Clark County Engineer's Office. Specific surveying tasks include the installation perimeter (approximately 12,800 linear feet plus a 3-foot easement), State Route 794 on the installation (approximately 2,500 linear feet), areas south and east of the installation (approximately 32 acres), Parcel E (approximately 1.2 acres), and Parcel 5 (approximately 0.6 acres). An optional site visit is scheduled for November 25, 2026, at 9:00 a.m., with no exceptions made for requests outside this time. The bid submission deadline is December 17, 2026, with proposals to be submitted via OhioBuys. The contract period of performance is four months (120 days) from project initiation.

Pricing shall include all applicable labor, materials, supervision, permits, equipment, overhead, profit, and incidental costs necessary for complete performance. The contractor must obtain all required dig permits and utility locates and is responsible for coordinating access with Springfield-Beckley Municipal Airport and the City of Springfield. All surveys must be stamped by a certified Professional Surveyor licensed in or with reciprocity in Ohio and submitted as georeferenced AutoCAD .dwg files compatible with Air Force NexGen IT (TRIRIGA) and GeoBase systems. The contractor shall provide a one-year warranty on all materials, labor, installed equipment, and work performed. All project components must comply with the Build America, Buy America Act. The contractor is responsible for all safety compliance, security requirements, background checks for base access, daily jobsite cleanup, and final inspection coordination. Invoices may be submitted for progress payments if included in the initial bid submission and should be directed to the Base Civil Engineer, Mr. Blake Melling.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR SERVICES

PERFORMANCE WORK STATEMENT (PWS)

FOR

Survey Lease Parcels Project No.: A3127001 Prepared by 178th Civil Engineer Squadron Springfield-Beckley ANGB, OH, 45502

21 October 2026

Contents

INTRODUCTION……………………………………………………………………………………3

PERSONNEL / SECURITY REQUIREMENTS………………………………………….….……3

SAFETY & CODE COMPLIANCE…………………………………………………………...……4

GENERAL REQUIREMENTS…………………………………………………………..…..…...…4

DETAILED DESRIPTION OF WORK…………………………………………………….………5

GENERAL INFORMATION…………………………………………………………………..……6

DEFINITIONS & ARCONYMS………………………………………………………………….…7

CODE, CRITERIA & STANDARDS……………………………………………………...……..…8

i

PERFORMANCE WORK STATEMENT (PWS)

For Repair Services

1. INTRODUCTION

The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to perform the services for this project, A3127001, Survey Lease Parcels, as defined in this PWS.

Objective: The objective of this project is to survey multiple areas on and around Springfield Air National Guard Base, prepare the legal descriptions for an amendment to the existing lease agreement between the City of Springfield and the Department of the Air Force, and submit to the Clark County Engineer’s office. A copy of the existing lease can be provided upon project award.

Location: The work site for this project is at Springfield-Beckley Air National Guard Base, Springfield, OH, 45502.

Site Visit: A site visit will be held for this project. Please see the “Inquiries” section on OhioBuys for the date/time. Upon arrival, please notify Security Forces that you are here for the site visit, and Civil Engineer personnel will escort you on base. Ensure any attendees have valid driver’s license(s) and be prepared for a vehicle search.

Points of Contact:

Engineering Technician / RPM: Mr. Jordan Deady – (937) 631-1586 Technical Inspector: Mr. Nick Owens – (937) 525-2589 / nicholas.owens.2@us.af.mil Technical Inspector: Mr. Shane Ober -- (937) 327-2163 / shane.ober.1@us.af.mil Base Civil Engineer: Mr. Blake Melling – (937) 327-2352 / blake.melling.1@us.af.mil Dig Permit: OUPS Reporting – 1-800-362-2764

2. PERSONNEL & SECURITY REQUIREMENTS

2.1. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Base Civil Engineer Flight. A security briefing will be conducted prior to the start of the contract. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces office.

2.2. Unscheduled gate closures by Security Forces may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This sometimes cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

2.3. Contractor employees should only enter restricted areas when required to do so. They must gain prior approval and be always escorted by base personnel in these areas.

2.4. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

2.5. The contractor shall obtain base passes for all contractor personnel who will require access to the installation(s) cited in the contract. All contractors entering the base must possess a REAL ID or Government-issued CAC. Contractors shall provide appropriate personal information for the Visitor Request Form two weeks prior to start of work.

2.6. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.

2.7. The contractor shall ensure compliance with all personal identity verification requirements as directed by Security Forces and/or local policy. All Contractor personnel shall have a minimum of one (1) form of photo identification with them at all times. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

2.8. The Contractor shall recover base passes upon job completion and return to Government within five (5) days of Final Inspection, if physical passes provided.

3. SAFETY & CODE COMPLIANCE

3.1. The Government is not liable for any injury incurred by Contractor, Contractor personnel, or other persons while they are on site. Contractor shall take full responsibility for the safety of all personnel within the project site, including base personnel.

3.2. The Contractor shall ensure that employees are supplied with and use proper safety equipment (i.e. gloves, safety boots) described in OSHA, EM 385 & EM 304 and follow safe work procedures, which protect Contractor employees and personnel in the vicinity of the job site in accordance with all current OSHA requirements. The Contractor shall assume any liability for any injury incurred by Contractor personnel while working on site.

3.3. The Contractor shall always adhere to model building codes (NEC, IBC, IPC, NFPA etc.), Ohio Building Codes, Unified Facilities Criteria (UFCs) and Manufacturer installation requirements/recommendations. The Contractor is to stop work and immediately inform the Government if they believe any requirements deviate from code.

4. GENERAL REQUIREMENTS

4.1. A full-time Superintendent must be appointed and always present during work. The superintendent will be responsible for all onsite activities. Submit name(s) of Superintendent, and any identified alternates, to the Base Civil Engineer or Deputy Base Civil Engineer prior to starting the project.

4.2. The Contractor shall perform a job site cleanup each day and remove all debris and refuse from the site. Unoccupied areas to be broom swept daily. Occupied areas shall be kept free of dust and debris at all times.

4.3. The Base Civil Engineer or Deputy Base Civil Engineer must approve all Material Submittals prior to procurement. See the attached required Material Submittals list for this project.

4.4. The Contractor is required to submit a Project Schedule with project milestones. This schedule must be approved by the Base Civil Engineer or Deputy Base Civil Engineer prior to starting any work. If any changes to the original schedule should occur, the Contractor must resubmit a schedule within 7 days.

4.5. The Contactor is responsible for obtaining any required dig permits, utility locates, and all other permits as needed to complete the work described in this SOW.

4.6. The Contractor shall schedule a final inspection with the Base Civil Engineer or Deputy Base Civil Engineer to verify quality and completeness of the work. Only upon verification of quality and completion shall the project be considered complete and ownership be taken by the Government

4.7. The Contractor shall provide a 1-year warranty on all material, labor, installed equipment, and work performed in this SOW in addition to any manufacturer’s warranties. Warranties shall be submitted using the submittal process within 30 days of project completion.

4.8. All components of this project must comply with the Build America, Buy America ("BABA") Act. Pub. L. No. 117-58, §§ 70901-52.

5.

BID AND INVOICE REQUIREMENTS

5.1. All bids shall be submitted on OhioBuys.

5.2. Contractor may opt to include a brief synopsis of the services provided in their bid. Information provided in this manner will only be treated as situational awareness that the contractor understands the scope of work included in the PWS. Any discrepancies between the information provided in bid submissions and the requirements in the PWS shall defer to the PWS as the governing document of the true requirement of the project. Failure to include an item from the PWS in a bid submission does not excuse the contractor from being responsible for performing the work.

5.3. Pricing shall include all applicable labor, materials, supervision, permits, equipment, overhead, profit, and incidental costs necessary for a complete installation.

5.4. If a Contractor wishes to invoice for progress payments, they must include this information with their bid submission so that the information can be included in the contract prior to award. Failure to include this information could result in the inability of the Government to pay progress payments.

5.5. Invoices can be sent to Mr. Blake Melling at blake.melling.1@us.af.mil.

6. DETAILED DESCRIPTION OF WORK

6.1. The Contractor shall survey the installation perimeter, which is comprised of the perimeter fence, plus a 3-foot easement (approximately 12,800 LF). The installation perimeter is not to be explicitly included as a legal description in the lease agreement; this information is solely required for the Base Engineering office’s records.

6.1.1. The area surrounding the perimeter is controlled by Springfield-Beckley Municipal Airport and the City of Springfield. The Contractor is responsible for coordinating a date and time for access with these entities. Points of Contact for coordination can be provided to the contractor upon project award.

6.2. The Contractor shall survey the portion of State Route 794 that is on the installation (approximately 1.3 acres / 2,500 LF in length). This area is to be included as an in-grant in the forthcoming lease amendment.

6.3. The Contractor shall survey the area to the south and east of the installation (approximately 32 acres). A 3-foot easement shall be accounted for where this area abuts the installation perimeter fence. This area encompasses much of Parcels C, D, F G and H in the existing lease agreement. This area will be included as an out-grant on the forthcoming lease amendment.

6.4. The Contractor shall survey Parcel E (approximately 1.2 acres). This area is to be included as an out-grant in the forthcoming lease amendment.

6.5. The Contractor shall survey Parcel 5 (approximately 0.6 acres). This area is to be included as an out-grant in the forthcoming lease amendment.

6.6. Dimensions provided in this PWS are approximations and are for reference only. Contractor is responsible for surveying the entirety of the specified areas regardless of a discrepancy in these approximations.

6.7. Survey(s) must be stamped by a certified Professional Surveyor who is licensed in or has reciprocity in Ohio.

6.8. Contractor shall submit survey(s) as a georeferenced AutoCAD .dwg file to the Base Engineering team.

6.9. The Contractor shall prepare and submit the legal boundary descriptions for the lease amendment to Clark County Engineer’s Office and coordinate the acceptance by the Clark County Auditor’s Office and Clark County Recorder’s Office. If any additional documentation or maps are required by these offices (parcel maps, tract maps, easement maps, physical plats etc.), the Contractor is responsible for preparing and submitting these as well.

6.9.1. All deliverables must be compatible with the installation's Real Property records. The Contractor shall format all geospatial data to be directly importable into the Air Force NexGen IT (TRIRIGA) and GeoBase systems without requiring additional modification by the Government.

6.10. The Contractor shall attend a meeting with Base Engineering staff prior to performing any work to ensure the scope of the project is fully understood.

Period of Performance: The Period of Performance shall be 4 months (or 120 Days).

7. GENERAL INFORMATION

7.1. Data Rights: The Government has unlimited rights to all data deliverables under this contract.

7.2. Location and Facility Information: The primary work site is Springfield-Beckley ANG Base, Springfield, OH. Work may be completed at various buildings across the installation, as needed.

7.3. The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

7.4. Equipment: The government will not furnish any equipment for the duration of this project.

7.5. Property: Existing utilities, and facilities are all on government property and will be furnished to work on as part of the project.

7.6. Access and General Protection/Security Policy and Procedures:

7.7. The contractor may access the base between the hours of 0730 – 1600 Monday through Friday, except for recognized U.S. holidays (see below) or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.

Federal Holidays New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day

8. DEFINITIONS & ACRONYMS

Definitions Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime contractor.

Defective Service: A service output that does not meet the standard of performance associated with the PWS.

Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

Physical Security: Actions that prevent the loss or damage of Government property.

Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

Acronyms

A-EArchitect-Engineer
ANGETLAir National Guard Engineering Technical Letter ANGIAir National Guard Instruction
COACourse of Action
CORContracting Officer Representative DDDepartment of Defense (Form)
DoDDepartment of Defense
ECFEntry Control Facility FPSONForce Protection Condition
GFP/M/E/S Government Furnished Property/Material/Equipment/Services IDIdentification
KOContracting Officer MILCONMilitary Construction NGBNational Guard Bureau
PCRPlanning Charrette Report
POLPetroleum, Oils, and Lubricants
PWSPerformance Work Statement QAQuality Assurance
QASPQuality Assurance Surveillance Plan UFCUnified Facility Criteria
UMMCUnspecified Minor Military Construction

9. CODES, CRITERIA, & STANDARDS

The contractor shall follow all applicable Department of Defense (DoD), U.S. Air Force, federal, state, local codes, regulations, and design standards. These will also be provided electronically to the A-E upon selection and award of contract. They shall include, but are not limited to:

ANGETL 15-01-04, Mechanical Engineering.

ANGETL 15-01-05, Electrical and Communications.

UFC 1-200-01, DOD Building Code.

UFC 1-200-02, High Performance and Sustainable Building Requirements.

UFC 3-501-01, Electrical Engineering, with Change 1.

UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, with Change 2.

All other applicable UFCs, Federal, State, and Local codes and regulations.