PWS_26Q0074.pdf
PDF 482 KB Posted
- Attached to
- Shipping Container Storage - Guam
- Solicitation number
- N5523626Q0074
About this file
This is a Statement of Work (SOW) for container storage services in Guam to support the Southwest Regional Maintenance Center (SWRMC), which provides maintenance, modernization, and repair services for U.S. Navy vessels. The contractor shall provide and maintain a secure storage facility with all necessary personnel and services to safeguard Government-owned shipping containers from theft and damage while ensuring full accountability and accessibility to authorized Government personnel.
The facility must accommodate a minimum of thirty (30) 20-foot ISO shipping containers in unstacked outdoor storage and implement comprehensive security measures including perimeter fencing, electronic access gates, continuous 24/7 video surveillance monitoring all access points and container storage areas, and incident reporting within two hours of discovery with formal written reports within 24 hours. The contractor is prohibited from accessing locked containers, as the Government will place its own locks. An Integrated Pest Management (IPM) plan is required to mitigate Brown Tree Snake presence through vegetation management, barrier maintenance with screened air ducts, and active trapping along facility boundaries. The contractor must provide 24/7 access for entry and full unimpeded access during normal business hours for Government-led quarterly sustainment maintenance and corrosion control activities. All property management, inventory functions, and container handling are performed exclusively by Government personnel. The contractor shall comply with all local, state, and federal safety and fire codes and maintain commercial property insurance of not less than $1,000,000 covering stored Government property against loss, damage, or destruction from fire, theft, and other insurable hazards, with a Certificate of Insurance provided prior to work commencement. The contract period consists of one 12-month base year (06/01/2026–05/31/2027) and four 12-month option years, with performance to be conducted in the unincorporated territory of Guam, United States.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_00003_COMSS_26Q0074.pdf | ||
| PWS_26Q0074-Rev-3.pdf | ||
| PWS_26Q0074-Rev-2.pdf | ||
| Amendment_0002_COMSS_26Q0074.pdf | ||
| Amendment_0001_COMSS_26Q0074.pdf | ||
| Itemized_Pricing_Sheet_26Q0074-Rev-1.xlsx | XLSX spreadsheet | |
| RFC_26Q0074.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTHWEST REGIONAL MAINTENANCE CENTER
STATEMENT OF WORK (SOW)
CONTAINER STORAGE IN GUAM TO SUPPORT EXRAV
1.0 Background
This Performance Work Statement (PWS) outlines the requirements for a contractor to provide secure, continuously accessible storage services for Government-owned, mission-essential shipping containers in Guam. This facility will serve as a strategic hub for the Southwest Regional Maintenance Center (SWRMC), which provides critical maintenance, modernization, and repair for U.S. Navy vessels. The services are essential for secure and reliable service, thereby ensuring operational readiness.
2.0 Scope of Work
The Contractor shall provide and maintain a secure storage facility and furnish all necessary personnel, supervision, and services to ensure Government property is safeguarded from theft and damage. The property must be fully accountable and accessible to authorized Government personnel without delay.
3.0 Facility Requirements
3.1 Storage Capacity
The facilities outside storage area must accommodate a minimum of thirty (30) 20-foot ISO shipping containers, unstacked.
3.2 Security
The Contractor shall meet the following security standards:
Perimeter and Access Control: The storage area must be secured by a perimeter fence and an electronic access gate.
Video Surveillance: The facility must be equipped with a video surveillance system that provides continuous (24/7) recording. Cameras must monitor all access gates and the specific areas where Government containers are stored.
Container Security: The Government will place its own locks on the shipping containers. The Contractor is prohibited from having access to or methods of entering the locked units.
Incident Reporting: The Contractor shall report any suspected security breaches, theft, loss, or damage to Government assets to the designated Government official within two (2) hours of discovery. A formal written report detailing the incident must be submitted within 24 hours of discovery.
3.3 Pest Control (Brown Tree Snake Mitigation)
The facility must implement an Integrated Pest Management (IPM) plan to mitigate the presence of Brown Tree Snakes (BTS). This plan shall include:
Vegetation Management: Keeping the storage area and perimeter clear of dense vegetation and debris that could serve as snake or prey habitats.
Barrier Maintenance: Maintaining the integrity of the perimeter fencing to prevent entry.
All facility buildings on the premises must have screens on air ducts and other openings.
Active Trapping: Placing and maintaining snake traps along facility boundaries as required by military installation standards.
4.0 Operational Requirements
4.1 Government Access for Maintenance
While 24/7 access is required for entry, the Contractor shall also provide full and unimpeded access to the storage units during normal business hours to allow for Government-led quarterly sustainment maintenance and corrosion control activities.
4.2 Property and Inventory Management
All property management, inventory functions, and handling of items within the containers will be performed exclusively by Government personnel. The Contractor is not responsible for these duties.
4.3 Hazardous Materials (HazMat)
In the event that the Government requires storage of hazardous materials, a formal written request will be submitted to the Contractor. Within forty-eight (48) hours of such a request, the Government will provide a comprehensive Safety Data Sheet (SDS) for each material.
Examples of hazardous material that may be stored.
o 10-20w oil for generator o Aerosol paint o Cleaning agents o Adhesives, solvents o Batteries (lithium/lead-acid)
5.0 Safety and Insurance
5.1 Safety Compliance
The Contractor shall comply with all applicable local, state, and federal safety and fire codes.
5.2 Insurance
The Contractor shall, at its own expense, procure and maintain commercial property insurance in an amount not less than $1,000,000. This insurance policy shall cover all stored Government property in the Contractor's possession against loss, damage, or destruction resulting from fire, theft, and other insurable hazards. Prior to the commencement of work, the Contractor shall furnish a valid Certificate of Insurance to the Contracting Officer as evidence of this required coverage.
6.0 Period and Place of Performance
6.1 Place of Performance
The services shall be performed in the unincorporated territory of Guam, United States.
6.2 Period of Performance (PoP)
The PoP shall consist of one (1) 12-month base year and four (4) 12-month option years.
Base Year: 06/01/2026 – 05/31/2027
Option Year I: 06/01/2027 – 05/31/2028
Option Year II: 06/01/2028 – 05/31/2029
Option Year III: 06/01/2029 – 05/31/2030
Option Year IV: 06/01/2030 – 05/31/2031
File details come from the government source that posted it. Updated .